메뉴 건너뛰기




Volumn 43, Issue 14, 2003, Pages 1473-1486

A hierarchical approach to generating precedence graphs for assembly planning

Author keywords

Assembly planning; Geometric reasoning; Hierarchical structure; Precedence graphs; Precedence relations

Indexed keywords

ALGORITHMS; GRAPH THEORY; PLANNING;

EID: 0141681206     PISSN: 08906955     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0890-6955(03)00168-8     Document Type: Article
Times cited : (47)

References (24)
  • 3
    • 0026142590 scopus 로고
    • A correct and complete algorithm for the generation of mechanical assembly sequences
    • Homem de Mello L.S., Sanderson A.C. A correct and complete algorithm for the generation of mechanical assembly sequences. IEEE Transactions on Robotics and Automation. 7:(2):1991;228-240.
    • (1991) IEEE Transactions on Robotics and Automation , vol.7 , Issue.2 , pp. 228-240
    • Homem de Mello, L.S.1    Sanderson, A.C.2
  • 8
    • 0027589546 scopus 로고
    • An integrated approach to automated assembly planning for three-dimensional mechanical products
    • Lin A.C., Chang T.C. An integrated approach to automated assembly planning for three-dimensional mechanical products. International Journal of Production Research. 31:(5):1993;1201-1227.
    • (1993) International Journal of Production Research , vol.31 , Issue.5 , pp. 1201-1227
    • Lin, A.C.1    Chang, T.C.2
  • 10
    • 0030129093 scopus 로고    scopus 로고
    • Minimal precedence constraints for integrated assembly and execution planning
    • Rajan V.N., Nof S.Y. Minimal precedence constraints for integrated assembly and execution planning. IEEE Transactions on Robotics and Automation. 12:(2):1996;175-186.
    • (1996) IEEE Transactions on Robotics and Automation , vol.12 , Issue.2 , pp. 175-186
    • Rajan, V.N.1    Nof, S.Y.2
  • 14
    • 0034838203 scopus 로고    scopus 로고
    • Generation of precedence graphs for a product family using a disassembly approach
    • Soft Research Park, Fukuoka, Japan, May
    • Fouda P., De Lit P., Rekiek B. Generation of precedence graphs for a product family using a disassembly approach. IEEE International Symposium on Assembly and Task Planning, Soft Research Park, Fukuoka, Japan, May:2001;226-231.
    • (2001) IEEE International Symposium on Assembly and Task Planning , pp. 226-231
    • Fouda, P.1    De Lit, P.2    Rekiek, B.3
  • 15
    • 0002199316 scopus 로고
    • The use of heuristics in assembly sequence planning
    • Heemskerk C.J.M. Jr. The use of heuristics in assembly sequence planning. Annals of the CIRP. 38:(1):1989;37-40.
    • (1989) Annals of the CIRP , vol.38 , Issue.1 , pp. 37-40
    • Heemskerk C.J.M., Jr.1
  • 17
    • 0032633128 scopus 로고    scopus 로고
    • Automatic subassembly detection from a product model for disassembly sequence generation
    • Ong N.S., Wong Y.C. Automatic subassembly detection from a product model for disassembly sequence generation. International of Advanced Manufacturing Technology. 15:1999;425-431.
    • (1999) International of Advanced Manufacturing Technology , vol.15 , pp. 425-431
    • Ong, N.S.1    Wong, Y.C.2
  • 19
    • 0037208753 scopus 로고    scopus 로고
    • A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies
    • Yin Z.P., Ding H., Li H.X., Xiong Y. A connector-based hierarchical approach to assembly sequence planning for mechanical assemblies. Computer-Aided Design. 35:2003;37-56.
    • (2003) Computer-aided Design , vol.35 , pp. 37-56
    • Yin, Z.P.1    Ding, H.2    Li, H.X.3    Xiong, Y.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.