메뉴 건너뛰기




Volumn 179, Issue , 2016, Pages 259-272

A multi-objective genetic algorithm for optimisation of energy consumption and shop floor production performance

Author keywords

Energy efficient production planning; Genetic algorithms; Job shop scheduling; Multi objective optimisation; Sustainable manufacturing

Indexed keywords

ALGORITHMS; ENERGY CONSERVATION; ENERGY EFFICIENCY; ENERGY UTILIZATION; GENETIC ALGORITHMS; INDUSTRIAL RESEARCH; JOB SHOP SCHEDULING; MANUFACTURE; MULTIOBJECTIVE OPTIMIZATION; PRODUCTION CONTROL; SCHEDULING;

EID: 84976554750     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2016.06.019     Document Type: Article
Times cited : (116)

References (36)
  • 1
    • 84876127402 scopus 로고    scopus 로고
    • The energy scheduling problem: Industrial case-study and constraint propagation techniques
    • Artigues, C., Lopez, P., Haït, A., The energy scheduling problem: Industrial case-study and constraint propagation techniques. Int. J. Prod. Econ. 143:1 (2013), 13–23.
    • (2013) Int. J. Prod. Econ. , vol.143 , Issue.1 , pp. 13-23
    • Artigues, C.1    Lopez, P.2    Haït, A.3
  • 2
    • 84861589845 scopus 로고    scopus 로고
    • Energy-aware scheduling for improving manufacturing process sustainability: a mathematical model for flexible flow shops
    • Bruzzone, A.A.G., Anghinolfi, D., Paolucci, M., Tonelli, F., Energy-aware scheduling for improving manufacturing process sustainability: a mathematical model for flexible flow shops. CIRP Ann. Manuf. Technol. 61 (2012), 459–462.
    • (2012) CIRP Ann. Manuf. Technol. , vol.61 , pp. 459-462
    • Bruzzone, A.A.G.1    Anghinolfi, D.2    Paolucci, M.3    Tonelli, F.4
  • 3
    • 52949083117 scopus 로고    scopus 로고
    • Evolutionary Scheduling, Series: Studies in Computational Intelligence
    • Springer
    • Dahal, K.P., Tan, K.c., Cowling, P., Evolutionary Scheduling, Series: Studies in Computational Intelligence. Vol. 49, 2007, Springer.
    • (2007) , vol.Vol. 49
    • Dahal, K.P.1    Tan, K.C.2    Cowling, P.3
  • 4
    • 35948959453 scopus 로고    scopus 로고
    • Applications of Industrial Ecology Manufacturing, Recycling, and Efficiency
    • Massachusetts Institute of Technology
    • Dahmus, J.B., Applications of Industrial Ecology Manufacturing, Recycling, and Efficiency. 2007, Massachusetts Institute of Technology.
    • (2007)
    • Dahmus, J.B.1
  • 8
    • 84882319975 scopus 로고    scopus 로고
    • Preference vector ant colony system for minimising make-span and energy consumption in a hybrid flow shop
    • L. Wang A.H.C Ng K. Deb Springer
    • Du, B., Chen, H.P., Huang, G.Q., Yang, H.D., Preference vector ant colony system for minimising make-span and energy consumption in a hybrid flow shop. Wang, L., Ng, A.H.C, Deb, K., (eds.) Multi-objective Evolutionary Optimisation for Product Design and Manufacturing, 2011, Springer, 279–304.
    • (2011) Multi-objective Evolutionary Optimisation for Product Design and Manufacturing , pp. 279-304
    • Du, B.1    Chen, H.P.2    Huang, G.Q.3    Yang, H.D.4
  • 9
    • 80052124788 scopus 로고    scopus 로고
    • A new shop scheduling approach in support of sustainable manufacturing
    • J. Hesselbach C. Herrmann Springer
    • Fang, K., Uhan, N., Zhao, F., Sutherl, J.W., A new shop scheduling approach in support of sustainable manufacturing. Hesselbach, J., Herrmann, C., (eds.) Glocalised Solutions for Sustainability in Manufacturing, 2011, Springer, 305–310.
    • (2011) Glocalised Solutions for Sustainability in Manufacturing , pp. 305-310
    • Fang, K.1    Uhan, N.2    Zhao, F.3    Sutherl, J.W.4
  • 10
    • 0001947856 scopus 로고
    • Probabilistic learning combinations of local job-shop scheduling rules
    • J.F.M. a G.L. Thompson Prentice-Hall NJ, Englewood Cliffs
    • Fisher, H., Thompson, G.L., Probabilistic learning combinations of local job-shop scheduling rules. Thompson, J.F.M. a G.L., (eds.) Industrial Scheduling, 1963, Prentice-Hall, NJ, Englewood Cliffs, 225–251.
    • (1963) Industrial Scheduling , pp. 225-251
    • Fisher, H.1    Thompson, G.L.2
  • 11
    • 84945488150 scopus 로고    scopus 로고
    • Energy-efficient scheduling in manufacturing companies: a review and research framework
    • Gahm, C., Denz, F., Dirr, M., Tuma, A., Energy-efficient scheduling in manufacturing companies: a review and research framework. Eur. J. Oper. Res. 248:3 (2016), 744–757.
    • (2016) Eur. J. Oper. Res. , vol.248 , Issue.3 , pp. 744-757
    • Gahm, C.1    Denz, F.2    Dirr, M.3    Tuma, A.4
  • 13
    • 82055191581 scopus 로고    scopus 로고
    • A modeling method of task-oriented energy consumption for machining manufacturing system
    • He, Y., Liu, B., Zhang, X., Gao, H., Liu, X., A modeling method of task-oriented energy consumption for machining manufacturing system. J. Clean. Prod. 23 (2012), 167–174.
    • (2012) J. Clean. Prod. , vol.23 , pp. 167-174
    • He, Y.1    Liu, B.2    Zhang, X.3    Gao, H.4    Liu, X.5
  • 14
    • 58149328520 scopus 로고    scopus 로고
    • The economic effects of energy price shocks
    • Kilian, L., The economic effects of energy price shocks. J. Econ. Lit. 46 (2008), 871–909.
    • (2008) J. Econ. Lit. , vol.46 , pp. 871-909
    • Kilian, L.1
  • 17
    • 67650530385 scopus 로고    scopus 로고
    • Intelligent Optimization Scheduling Algorithms for Manufacturing Process and Their Applications
    • National Defense Industry Press
    • Liu, M., Wu, C., Intelligent Optimization Scheduling Algorithms for Manufacturing Process and Their Applications. 2008, National Defense Industry Press.
    • (2008)
    • Liu, M.1    Wu, C.2
  • 18
    • 84930473950 scopus 로고    scopus 로고
    • Multi-objective Optimisation Methods for Minimising Total Weighted Tardiness, Electricity Consumption and Electricity Cost in Job shops Trough Scheduling
    • PhD thesis, University of Nottingham United Kingdom
    • Liu, Y., Multi-objective Optimisation Methods for Minimising Total Weighted Tardiness, Electricity Consumption and Electricity Cost in Job shops Trough Scheduling. 2013, PhD thesis, University of Nottingham, United Kingdom.
    • (2013)
    • Liu, Y.1
  • 19
    • 84930482687 scopus 로고    scopus 로고
    • Reducing environmental impact of production during a rolling blackout policy – a multi-objective schedule optimisation approach
    • Liu, Y., Dong, H.B., Lohse, N., Petrovic, S., Reducing environmental impact of production during a rolling blackout policy – a multi-objective schedule optimisation approach. J. Clean. Prod. 102 (2015), 418–427.
    • (2015) J. Clean. Prod. , vol.102 , pp. 418-427
    • Liu, Y.1    Dong, H.B.2    Lohse, N.3    Petrovic, S.4
  • 20
    • 84893758734 scopus 로고    scopus 로고
    • An investigation into minimising total energy consumption and total weighted tardiness in job shops
    • Liu, Y., Dong, H., Lohse, N., Petrovic, S., Gindy, N., An investigation into minimising total energy consumption and total weighted tardiness in job shops. J. Clean. Prod. 65 (2014), 87–96.
    • (2014) J. Clean. Prod. , vol.65 , pp. 87-96
    • Liu, Y.1    Dong, H.2    Lohse, N.3    Petrovic, S.4    Gindy, N.5
  • 21
    • 84886724001 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling considering machine electricity consumption cost
    • Luo, H., Du, B., Huang, G.Q., Chen, H., Li, X., Hybrid flow shop scheduling considering machine electricity consumption cost. Int. J. Prod. Econ. 146:2 (2013), 423–439.
    • (2013) Int. J. Prod. Econ. , vol.146 , Issue.2 , pp. 423-439
    • Luo, H.1    Du, B.2    Huang, G.Q.3    Chen, H.4    Li, X.5
  • 22
    • 84959504765 scopus 로고    scopus 로고
    • Experimental study on energy consumption of computer numerical control machine tools
    • Lv, J.X., Tang, R.Z., Jia, S., Liu, Y., Experimental study on energy consumption of computer numerical control machine tools. J. Clean. Prod. 112 (2016), 3864–3874.
    • (2016) J. Clean. Prod. , vol.112 , pp. 3864-3874
    • Lv, J.X.1    Tang, R.Z.2    Jia, S.3    Liu, Y.4
  • 23
    • 84945236886 scopus 로고    scopus 로고
    • Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
    • Mansouri, S.A., Aktas, E., Besikci, U., Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption. Eur. J. Oper. Res. 248:3 (2016), 772–788.
    • (2016) Eur. J. Oper. Res. , vol.248 , Issue.3 , pp. 772-788
    • Mansouri, S.A.1    Aktas, E.2    Besikci, U.3
  • 24
    • 84893623800 scopus 로고    scopus 로고
    • Operational methods and models for minimisation of energy consumption in a manufacturing environment
    • Wichita State University
    • Mouzon, G., Operational methods and models for minimisation of energy consumption in a manufacturing environment. 2008, Wichita State University.
    • (2008)
    • Mouzon, G.1
  • 25
    • 78650636006 scopus 로고    scopus 로고
    • A framework to minimize total energy consumption and total tardiness on a single machine
    • Mouzon, G., Yildirim, M.B., A framework to minimize total energy consumption and total tardiness on a single machine. Int. J. Sustain. Eng. 1:2 (2008), 105–116.
    • (2008) Int. J. Sustain. Eng. , vol.1 , Issue.2 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 26
    • 34548395445 scopus 로고    scopus 로고
    • Operational methods for minimization of energy consumption of manufacturing equipment
    • Mouzon, G., Yildirim, M.B., Twomey, J., Operational methods for minimization of energy consumption of manufacturing equipment. Int. J. Prod. Res. 45 (2007), 4247–4271.
    • (2007) Int. J. Prod. Res. , vol.45 , pp. 4247-4271
    • Mouzon, G.1    Yildirim, M.B.2    Twomey, J.3
  • 29
    • 0033357382 scopus 로고    scopus 로고
    • Job shop scheduling with beam search
    • Sabuncuoglu, I., Bayiz, M., Job shop scheduling with beam search. Eur. J. Oper. Res. 118 (1999), 390–412.
    • (1999) Eur. J. Oper. Res. , vol.118 , pp. 390-412
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 30
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line
    • Subaï, C., Baptiste, P., Niel, E., Scheduling issues for environmentally responsible manufacturing: the case of hoist scheduling in an electroplating line. Int. J. Prod. Econ. 99 (2006), 74–87.
    • (2006) Int. J. Prod. Econ. , vol.99 , pp. 74-87
    • Subaï, C.1    Baptiste, P.2    Niel, E.3
  • 31
    • 40649106449 scopus 로고    scopus 로고
    • Decision support system for the batching problems of steelmaking and continuous-casting production
    • Tang, L.X., Wang, G.S., Decision support system for the batching problems of steelmaking and continuous-casting production. Omega 36:6 (2008), 976–991.
    • (2008) Omega , vol.36 , Issue.6 , pp. 976-991
    • Tang, L.X.1    Wang, G.S.2
  • 32
    • 0033741404 scopus 로고    scopus 로고
    • A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex
    • Tang, L.X., Liu, J.Y., Rong, A.Y., Yang, Z.H., A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex. Eur. J. Oper. Res. 124:2 (2000), 267–282.
    • (2000) Eur. J. Oper. Res. , vol.124 , Issue.2 , pp. 267-282
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 33
    • 84863268763 scopus 로고    scopus 로고
    • Optimal vehicle batching and sequencing to reduce energy consumption and atmospheric emissions in automotive paint shops
    • Wang, J., Li, J., Huang, N., Optimal vehicle batching and sequencing to reduce energy consumption and atmospheric emissions in automotive paint shops. Int. J. Sustain. Manuf. 2 (2011), 141–160.
    • (2011) Int. J. Sustain. Manuf. , vol.2 , pp. 141-160
    • Wang, J.1    Li, J.2    Huang, N.3
  • 34
    • 34247620981 scopus 로고    scopus 로고
    • Studies on Metaheuristics for Job Shop and Flow Shop Scheduling Problems
    • Kyoto University
    • Yamada, T., Studies on Metaheuristics for Job Shop and Flow Shop Scheduling Problems. 2003, Kyoto University.
    • (2003)
    • Yamada, T.1
  • 35
    • 84893738940 scopus 로고    scopus 로고
    • Energy implications in a two-stage production system with controllable production rates
    • Zanoni, S., Bettoni, L., Glock, C.H., Energy implications in a two-stage production system with controllable production rates. Int. J. Prod. Econ. 149 (2014), 164–171.
    • (2014) Int. J. Prod. Econ. , vol.149 , pp. 164-171
    • Zanoni, S.1    Bettoni, L.2    Glock, C.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.