메뉴 건너뛰기




Volumn , Issue , 2011, Pages 305-310

A new shop scheduling approach in support of sustainable manufacturing

Author keywords

Carbon footprint; Peak load; Scheduling

Indexed keywords

CARBON FOOTPRINT; DECISION MAKING; EMISSION CONTROL; ENERGY UTILIZATION; INTEGER PROGRAMMING; LIFE CYCLE; MANUFACTURE; OPTIMAL SYSTEMS;

EID: 80052124788     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1007/978-3-642-19692-8_53     Document Type: Conference Paper
Times cited : (97)

References (19)
  • 5
    • 0038782410 scopus 로고    scopus 로고
    • Energy-conscious, deterministic I/O device scheduling in hard RealTime systems
    • 9
    • Swaminathan, V., and Chakrabarty, K., (2003): Energy-Conscious, Deterministic I/O Device Scheduling in Hard RealTime Systems, in: IEEE Trans. Comput. Aided Des. Integr. Circ. Syst., Vol.22, Vol.9, pp.847-858.
    • (2003) IEEE Trans. Comput. Aided Des. Integr. Circ. Syst. , vol.22 , pp. 847-858
    • Swaminathan, V.1    Chakrabarty, K.2
  • 6
    • 0035242857 scopus 로고    scopus 로고
    • Energy-efficient design of battery-powered embedded systems
    • DOI 10.1109/92.920814, PII S1063821001017863, Low Power Electronics and Design
    • Simunic, T., Benini, L., and De Micheli, G., (2001): Energy-Efficient Design of Battery-Powered Embedded Systems, in: IEEE Trans. Very Large Scale Integr. (VLSI) Syst., Vol.9, No.1, pp.15-28. (Pubitemid 32922807)
    • (2001) IEEE Transactions on Very Large Scale Integration (VLSI) Systems , vol.9 , Issue.1 , pp. 15-28
    • Simunic, T.1    Benini, L.2    De Micheli, G.3
  • 7
    • 34548395445 scopus 로고    scopus 로고
    • Operational methods for minimization of energy consumption of manufacturing equipment
    • DOI 10.1080/00207540701450013, PII 781770536, Sustainable Design and Manufacture
    • Mouzon, G., Yildirim, M.B., Twomey, J., (2007): Operational Methods for Minimization of Energy Consumption of Manufacturing Equipment, in: International Journal of Production Research, Vol.45, No.18-19, pp.4247-4271. (Pubitemid 47351658)
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4247-4271
    • Mouzon, G.1    Yildirim, M.B.2    Twomey, J.3
  • 8
    • 78650636006 scopus 로고    scopus 로고
    • A framework to minimise total energy consumption and total tardiness on a single machine
    • Mouzon, G., Yildirim, M.B., (2008): A Framework to Minimise Total Energy Consumption and Total Tardiness on a Single Machine, in: International Journal of Sustainable Engineering Vol.1, No.1, pp.105-116.
    • (2008) International Journal of Sustainable Engineering , vol.1 , Issue.1 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 9
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
    • DOI 10.1016/j.ijpe.2004.12.008, PII S0925527304004530, Control and Management of Productive Systems
    • Subai, C., Baptiste, N. E., (2006): Scheduling Issues for Environmentally Responsible Manufacturing: The Case of Hoist Scheduling in An Electroplating Line, in: Int. J. production Engineering, Vol.99, No.1, pp.74-87. (Pubitemid 41550212)
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 74-87
    • Subai, C.1    Baptiste, P.2    Niel, E.3
  • 11
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • Ouelhadj, D., Petrovic, S., (2009): A Survey of Dynamic Scheduling in Manufacturing Systems, in: J. of Scheduling, Vol.12, No.3, pp.417-431.
    • (2009) J. of Scheduling , vol.12 , Issue.3 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 12
    • 40849098593 scopus 로고    scopus 로고
    • Real time distributed shop floor scheduling using an agent-based service-oriented architecture
    • DOI 10.1080/00207540701738052, PII 791536362, Enabling Technologies and Frameworks for Collaborative Intelligent Manufacturing
    • Wang, C., Ghenniwa, H., Shen, W., (2008): Real Time Distributed Shop Floor Scheduling Using an Agent-Based Service-Oriented Architecture, in: International Journal of Production Research, Vol.46, No.9, pp.2433-2452. (Pubitemid 351394262)
    • (2008) International Journal of Production Research , vol.46 , Issue.9 , pp. 2433-2452
    • Wang, C.1    Ghenniwa, H.2    Shen, W.3
  • 13
    • 52049091896 scopus 로고    scopus 로고
    • A me-metic algorithm for the flexible flow line scheduling problem with processor blocking
    • Tavakkoli-Moghaddama, R.N., Sassani, S.F., (2009): A Me-metic Algorithm for The Flexible Flow Line Scheduling Problem with Processor Blocking, in: Computers and Operations Research, Vol.36, No.5, pp.402-414.
    • (2009) Computers and Operations Research , vol.36 , Issue.5 , pp. 402-414
    • Tavakkoli-Moghaddama, R.N.1    Sassani, S.F.2
  • 14
    • 75749089533 scopus 로고    scopus 로고
    • A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations
    • Zeballos, L.J., Quiroga, O.D., Henning, G.P. (2010): A Constraint Programming Model for the Scheduling of Flexible Manufacturing Systems with Machine and Tool Limitations, in: Engineering Applications of Artificial Intelligence, Vol.23, No.2, pp.229-248.
    • (2010) Engineering Applications of Artificial Intelligence , vol.23 , Issue.2 , pp. 229-248
    • Zeballos, L.J.1    Quiroga, O.D.2    Henning, G.P.3
  • 15
    • 33646399781 scopus 로고    scopus 로고
    • Algorithms for the car sequencing and the level scheduling problem
    • Drexl, A., Kimms, A., Matthiessen, L., (2006): Algorithms for the Car Sequencing and the Level Scheduling Problem, in: J of Scheduling, Vol.9, No.2, pp.153-176.
    • (2006) J of Scheduling , vol.9 , Issue.2 , pp. 153-176
    • Drexl, A.1    Kimms, A.2    Matthiessen, L.3
  • 16
    • 0000237789 scopus 로고
    • On the job shop scheduling problem
    • Manne, A.S., (1960): On the Job Shop Scheduling Problem, Operations Research, Vol.8, No.2, pp.219-223.
    • (1960) Operations Research , vol.8 , Issue.2 , pp. 219-223
    • Manne, A.S.1
  • 18
    • 0037871958 scopus 로고    scopus 로고
    • Solving project scheduling problems by minimum cut computations
    • Möhring, R., Schulz, A.S., Stork, F., Uetz, M., (2003): Solving Project Scheduling Problems by Minimum Cut Computations, in: Management Science, Vol.49, No.5, pp.330-350.
    • (2003) Management Science , vol.49 , Issue.5 , pp. 330-350
    • Möhring, R.1    Schulz, A.S.2    Stork, F.3    Uetz, M.4
  • 19
    • 0003074223 scopus 로고
    • The traveling salesman problem with asymmetric matrices (in Russian)
    • Demidenko, V.M. (1979): The Traveling Salesman Problem with Asymmetric Matrices (in Russian), in: Vestsi Akad. Navuk BSSR Ser. Fiz.-Mat. Navuk Vol.1, No.1, pp.29-35.
    • (1979) Vestsi Akad. Navuk BSSR Ser. Fiz.-mat. Navuk , vol.1 , Issue.1 , pp. 29-35
    • Demidenko, V.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.