-
2
-
-
23244458542
-
An environmental analysis of machining
-
November 13-19, 2004, Anaheim, California
-
Dahmus, J.B., Gutowski, T.C. (2004): An Environmental Analysis of Machining, in: ASME International Mechanical Engineering Congress and RD&D Expo, November 13-19, 2004, Anaheim, California.
-
(2004)
ASME International Mechanical Engineering Congress and RD&D Expo
-
-
Dahmus, J.B.1
Gutowski, T.C.2
-
3
-
-
36448934178
-
Data collection framework on energy consumption in manufacturing
-
May 20-24, 2006, Orlando, FL
-
Drake, R., Yildirim, M.B., Twomey J., Whitman, L., Ahmad, J., and Lodhia, P., (2006): Data Collection Framework on Energy Consumption in Manufacturing, in: IIE Annual Conference and Expo, May 20-24, 2006, Orlando, FL.
-
(2006)
IIE Annual Conference and Expo
-
-
Drake, R.1
Yildirim, M.B.2
Twomey, J.3
Whitman, L.4
Ahmad, J.5
Lodhia, P.6
-
4
-
-
4243118645
-
Environmentally benign manufacturing: Observations from Japan, Europe and the United States
-
Gutowski, T.C., Murphy, C., Allen, D., Bauer, D., Bras, B., Piwonka, T., Sheng, P., Sutherland, J., Thurston, D. and Wolff, E., (2005): Environmentally Benign Manufacturing: Observations from Japan, Europe and the United States. In: Journal of Cleaner Production, Vol.13, No.1, pp.1-17.
-
(2005)
Journal of Cleaner Production
, vol.13
, Issue.1
, pp. 1-17
-
-
Gutowski, T.C.1
Murphy, C.2
Allen, D.3
Bauer, D.4
Bras, B.5
Piwonka, T.6
Sheng, P.7
Sutherland, J.8
Thurston, D.9
Wolff, E.10
-
5
-
-
0038782410
-
Energy-conscious, deterministic I/O device scheduling in hard RealTime systems
-
9
-
Swaminathan, V., and Chakrabarty, K., (2003): Energy-Conscious, Deterministic I/O Device Scheduling in Hard RealTime Systems, in: IEEE Trans. Comput. Aided Des. Integr. Circ. Syst., Vol.22, Vol.9, pp.847-858.
-
(2003)
IEEE Trans. Comput. Aided Des. Integr. Circ. Syst.
, vol.22
, pp. 847-858
-
-
Swaminathan, V.1
Chakrabarty, K.2
-
6
-
-
0035242857
-
Energy-efficient design of battery-powered embedded systems
-
DOI 10.1109/92.920814, PII S1063821001017863, Low Power Electronics and Design
-
Simunic, T., Benini, L., and De Micheli, G., (2001): Energy-Efficient Design of Battery-Powered Embedded Systems, in: IEEE Trans. Very Large Scale Integr. (VLSI) Syst., Vol.9, No.1, pp.15-28. (Pubitemid 32922807)
-
(2001)
IEEE Transactions on Very Large Scale Integration (VLSI) Systems
, vol.9
, Issue.1
, pp. 15-28
-
-
Simunic, T.1
Benini, L.2
De Micheli, G.3
-
7
-
-
34548395445
-
Operational methods for minimization of energy consumption of manufacturing equipment
-
DOI 10.1080/00207540701450013, PII 781770536, Sustainable Design and Manufacture
-
Mouzon, G., Yildirim, M.B., Twomey, J., (2007): Operational Methods for Minimization of Energy Consumption of Manufacturing Equipment, in: International Journal of Production Research, Vol.45, No.18-19, pp.4247-4271. (Pubitemid 47351658)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4247-4271
-
-
Mouzon, G.1
Yildirim, M.B.2
Twomey, J.3
-
8
-
-
78650636006
-
A framework to minimise total energy consumption and total tardiness on a single machine
-
Mouzon, G., Yildirim, M.B., (2008): A Framework to Minimise Total Energy Consumption and Total Tardiness on a Single Machine, in: International Journal of Sustainable Engineering Vol.1, No.1, pp.105-116.
-
(2008)
International Journal of Sustainable Engineering
, vol.1
, Issue.1
, pp. 105-116
-
-
Mouzon, G.1
Yildirim, M.B.2
-
9
-
-
27644439216
-
Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
-
DOI 10.1016/j.ijpe.2004.12.008, PII S0925527304004530, Control and Management of Productive Systems
-
Subai, C., Baptiste, N. E., (2006): Scheduling Issues for Environmentally Responsible Manufacturing: The Case of Hoist Scheduling in An Electroplating Line, in: Int. J. production Engineering, Vol.99, No.1, pp.74-87. (Pubitemid 41550212)
-
(2006)
International Journal of Production Economics
, vol.99
, Issue.1-2
, pp. 74-87
-
-
Subai, C.1
Baptiste, P.2
Niel, E.3
-
10
-
-
77953216458
-
Optimal scheduling to achieve energy reduction in automotive paint shops
-
October 4-7, 2009, West Lafayette, IN, USA
-
Wang, J., Li, J., Huang, N., (2009): Optimal Scheduling to Achieve Energy Reduction in Automotive Paint Shops, in: Proceedings of 2009 ASME Manufacturing Science and Engineering Conferences, October 4-7, 2009, West Lafayette, IN, USA.
-
(2009)
Proceedings of 2009 ASME Manufacturing Science and Engineering Conferences
-
-
Wang, J.1
Li, J.2
Huang, N.3
-
11
-
-
68249099005
-
A survey of dynamic scheduling in manufacturing systems
-
Ouelhadj, D., Petrovic, S., (2009): A Survey of Dynamic Scheduling in Manufacturing Systems, in: J. of Scheduling, Vol.12, No.3, pp.417-431.
-
(2009)
J. of Scheduling
, vol.12
, Issue.3
, pp. 417-431
-
-
Ouelhadj, D.1
Petrovic, S.2
-
12
-
-
40849098593
-
Real time distributed shop floor scheduling using an agent-based service-oriented architecture
-
DOI 10.1080/00207540701738052, PII 791536362, Enabling Technologies and Frameworks for Collaborative Intelligent Manufacturing
-
Wang, C., Ghenniwa, H., Shen, W., (2008): Real Time Distributed Shop Floor Scheduling Using an Agent-Based Service-Oriented Architecture, in: International Journal of Production Research, Vol.46, No.9, pp.2433-2452. (Pubitemid 351394262)
-
(2008)
International Journal of Production Research
, vol.46
, Issue.9
, pp. 2433-2452
-
-
Wang, C.1
Ghenniwa, H.2
Shen, W.3
-
13
-
-
52049091896
-
A me-metic algorithm for the flexible flow line scheduling problem with processor blocking
-
Tavakkoli-Moghaddama, R.N., Sassani, S.F., (2009): A Me-metic Algorithm for The Flexible Flow Line Scheduling Problem with Processor Blocking, in: Computers and Operations Research, Vol.36, No.5, pp.402-414.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.5
, pp. 402-414
-
-
Tavakkoli-Moghaddama, R.N.1
Sassani, S.F.2
-
14
-
-
75749089533
-
A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations
-
Zeballos, L.J., Quiroga, O.D., Henning, G.P. (2010): A Constraint Programming Model for the Scheduling of Flexible Manufacturing Systems with Machine and Tool Limitations, in: Engineering Applications of Artificial Intelligence, Vol.23, No.2, pp.229-248.
-
(2010)
Engineering Applications of Artificial Intelligence
, vol.23
, Issue.2
, pp. 229-248
-
-
Zeballos, L.J.1
Quiroga, O.D.2
Henning, G.P.3
-
15
-
-
33646399781
-
Algorithms for the car sequencing and the level scheduling problem
-
Drexl, A., Kimms, A., Matthiessen, L., (2006): Algorithms for the Car Sequencing and the Level Scheduling Problem, in: J of Scheduling, Vol.9, No.2, pp.153-176.
-
(2006)
J of Scheduling
, vol.9
, Issue.2
, pp. 153-176
-
-
Drexl, A.1
Kimms, A.2
Matthiessen, L.3
-
16
-
-
0000237789
-
On the job shop scheduling problem
-
Manne, A.S., (1960): On the Job Shop Scheduling Problem, Operations Research, Vol.8, No.2, pp.219-223.
-
(1960)
Operations Research
, vol.8
, Issue.2
, pp. 219-223
-
-
Manne, A.S.1
-
17
-
-
0004281784
-
-
Industrial Press, New York, NY
-
Oberg, E., Jones, F.D., Horton, H.L., Ryffel, H.H., McCauley, C.J., Heald, R., (2008): Machinery's Handbook, Industrial Press, New York, NY.
-
(2008)
Machinery's Handbook
-
-
Oberg, E.1
Jones, F.D.2
Horton, H.L.3
Ryffel, H.H.4
McCauley, C.J.5
Heald, R.6
-
18
-
-
0037871958
-
Solving project scheduling problems by minimum cut computations
-
Möhring, R., Schulz, A.S., Stork, F., Uetz, M., (2003): Solving Project Scheduling Problems by Minimum Cut Computations, in: Management Science, Vol.49, No.5, pp.330-350.
-
(2003)
Management Science
, vol.49
, Issue.5
, pp. 330-350
-
-
Möhring, R.1
Schulz, A.S.2
Stork, F.3
Uetz, M.4
-
19
-
-
0003074223
-
The traveling salesman problem with asymmetric matrices (in Russian)
-
Demidenko, V.M. (1979): The Traveling Salesman Problem with Asymmetric Matrices (in Russian), in: Vestsi Akad. Navuk BSSR Ser. Fiz.-Mat. Navuk Vol.1, No.1, pp.29-35.
-
(1979)
Vestsi Akad. Navuk BSSR Ser. Fiz.-mat. Navuk
, vol.1
, Issue.1
, pp. 29-35
-
-
Demidenko, V.M.1
|