1
-
-
84876141067
-
Modeling Uncertainty in Risk Assessment: An Integrated Approach with Fuzzy Set Theory and Monte Carlo Simulation
-
N.S.Arunraj, S.MandalSaptarshi, and J.Maiti. 2013. “Modeling Uncertainty in Risk Assessment:An Integrated Approach with Fuzzy Set Theory and Monte Carlo Simulation.” Accident Analysis and Prevention 55:242–255.
-
(2013)
Accident Analysis and Prevention
, vol.55
, pp. 242-255
-
-
Arunraj, N.S.1
Mandal, S.2
Maiti, J.3
-
2
-
-
77949421406
-
On the Need for Restricting the Probabilistic Analysis in Risk Assessments to Variability
-
T.Aven, Terje. 2010a. “On the Need for Restricting the Probabilistic Analysis in Risk Assessments to Variability.” Risk Analysis 30 (3):354–360.
-
(2010)
Risk Analysis
, vol.30
, Issue.3
, pp. 354-360
-
-
Aven, T.1
-
3
-
-
73649142725
-
Some Reflections on Uncertainty Analysis and Management
-
T.Aven, Terje. 2010b. “Some Reflections on Uncertainty Analysis and Management.” Reliability Engineering & System Safety 95 (3):195–201.
-
(2010)
Reliability Engineering & System Safety
, vol.95
, Issue.3
, pp. 195-201
-
-
Aven, T.1
-
5
-
-
84861872098
-
Proposal of A Risk-factor-based Analytical Approach for Integrating Occupational Health and Safety into Project Risk Evaluation
-
A.Badri, S.Nadeau, and A.Gbodossou. 2012. “Proposal of A Risk-factor-based Analytical Approach for Integrating Occupational Health and Safety into Project Risk Evaluation.” Accident Analysis & Prevention 48:223–234.
-
(2012)
Accident Analysis & Prevention
, vol.48
, pp. 223-234
-
-
Badri, A.1
Nadeau, S.2
Gbodossou, A.3
-
6
-
-
34247199459
-
Joint Propagation of Probability and Possibility in Risk Analysis: Towards a Formal Framework
-
C.Baudrit, Cédric, I.CousoInés, and D.DuboisDidier. 2007. “Joint Propagation of Probability and Possibility in Risk Analysis:Towards a Formal Framework.” International Journal of Approximate Reasoning 45 (1):82–105.
-
(2007)
International Journal of Approximate Reasoning
, vol.45
, Issue.1
, pp. 82-105
-
-
Baudrit, C.1
Couso, I.2
Dubois, D.3
-
8
-
-
0026855415
-
Evaluate Uncertainties in Advanced Process Technologies
-
H.Christopher Frey, and E.S.RubinEdward S. 1992. “Evaluate Uncertainties in Advanced Process Technologies.” Chemical Engineering Progress 88 (5):63–70.
-
(1992)
Chemical Engineering Progress
, vol.88
, Issue.5
, pp. 63-70
-
-
Christopher Frey, H.1
Rubin, E.S.2
-
9
-
-
0032839653
-
Combining Probability Distributions From Experts in Risk Analysis
-
R.T.Clemen, Robert T., and R.L.WinklerRobert L. 1999. “Combining Probability Distributions From Experts in Risk Analysis.” Risk Analysis 19 (2):187–203. Doi:10.1023/A:1006917509560.
-
(1999)
Risk Analysis
, vol.19
, Issue.2
, pp. 187-203
-
-
Clemen, R.T.1
Winkler, R.L.2
-
10
-
-
33645077054
-
Fuzzy Risk Assessment Tool for Microbial Hazards in Food Systems
-
V.J.Davidson, J.Ryks, and A.Fazil. 2006. “Fuzzy Risk Assessment Tool for Microbial Hazards in Food Systems.” Fuzzy Sets and Systems 157 (9):1201–1210.
-
(2006)
Fuzzy Sets and Systems
, vol.157
, Issue.9
, pp. 1201-1210
-
-
Davidson, V.J.1
Ryks, J.2
Fazil, A.3
-
11
-
-
69049117914
-
Handling Data Uncertainties in Event Tree Analysis
-
R.Ferdous, Refaul, F.KhanFaisal, R.SadiqRehan, P.AmyottePaul, and B.VeitchBrian. 2009a. “Handling Data Uncertainties in Event Tree Analysis.” Process Safety and Environmental Protection 87 (5):283–292.
-
(2009)
Process Safety and Environmental Protection
, vol.87
, Issue.5
, pp. 283-292
-
-
Ferdous, R.1
Khan, F.2
Sadiq, R.3
Amyotte, P.4
Veitch, B.5
-
12
-
-
67649840714
-
Methodology for Computer Aided Fuzzy Fault Tree Analysis
-
R.Ferdous, Refaul, F.KhanFaisal, B.VeitchBrian, and P.R.AmyottePaul R. 2009b. “Methodology for Computer Aided Fuzzy Fault Tree Analysis.” Process Safety and Environmental Protection 87 (4):217–226.
-
(2009)
Process Safety and Environmental Protection
, vol.87
, Issue.4
, pp. 217-226
-
-
Ferdous, R.1
Khan, F.2
Veitch, B.3
Amyotte, P.R.4
-
13
-
-
78650543064
-
Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling Formulations
-
R.Ferdous, Refaul, F.KhanFaisal, R.SadiqRehan, P.AmyottePaul, and B.VeitchBrian. 2011. “Fault and Event Tree Analyses for Process Systems Risk Analysis:Uncertainty Handling Formulations.” Risk Analysis 31 (1):86–107.
-
(2011)
Risk Analysis
, vol.31
, Issue.1
, pp. 86-107
-
-
Ferdous, R.1
Khan, F.2
Sadiq, R.3
Amyotte, P.4
Veitch, B.5
-
15
-
-
0030289763
-
Different Methods are Needed to Propagate Ignorance and Variability
-
S.Ferson, Scott, and L.R.GinzburgLev R. 1996. “Different Methods are Needed to Propagate Ignorance and Variability.” Reliability Engineering & System Safety 54 (2):133–144.
-
(1996)
Reliability Engineering & System Safety
, vol.54
, Issue.2
, pp. 133-144
-
-
Ferson, S.1
Ginzburg, L.R.2
-
17
-
-
60949463789
-
Psychophysical Causal Relations
-
J.A.Foster, John A. 1968. “Psychophysical Causal Relations.” American Philosophical Quarterly 5 (1):64–70.
-
(1968)
American Philosophical Quarterly
, vol.5
, Issue.1
, pp. 64-70
-
-
Foster, J.A.1
-
18
-
-
0037239960
-
Hybrid Approach for Addressing Uncertainty in Risk Assessments
-
D.Guyonnet, Dominique, B.BourgineBernard, D.DuboisDidier, H.FargierHélène, B.CômeBernard, and J.-P.ChilèsJean-Paul. 2003. “Hybrid Approach for Addressing Uncertainty in Risk Assessments.” Journal of environmental engineering 129 (1):68–78.
-
(2003)
Journal of environmental engineering
, vol.129
, Issue.1
, pp. 68-78
-
-
Guyonnet, D.1
Bourgine, B.2
Dubois, D.3
Fargier, H.4
Côme, B.5
Chilès, J.-P.6
-
19
-
-
18744400778
-
Understanding Risk and Uncertainty in Supplier Networks-A Transaction Cost Approach
-
J.Hallikas, V.-M.Virolainen, and M.Tuominen. 2002. “Understanding Risk and Uncertainty in Supplier Networks-A Transaction Cost Approach.” International Journal of Production Research 40 (15):3519–3531. doi:10.1080/00207540210146512.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.15
, pp. 3519-3531
-
-
Hallikas, J.1
Virolainen, V.-M.2
Tuominen, M.3
-
21
-
-
79951774363
-
Ecological Risk Assessment for the Effects of Fishing
-
A.J.Hobday, A.D.M.Smith, I.C.Stobutzki, C.Bulman, R.Daley, J.M.Dambacher, R.A.Deng,. 2011. “Ecological Risk Assessment for the Effects of Fishing.” Fisheries Research 108 (2–3):372–384.
-
(2011)
Fisheries Research
, vol.108
, Issue.2-3
, pp. 372-384
-
-
Hobday, A.J.1
Smith, A.D.M.2
Stobutzki, I.C.3
Bulman, C.4
Daley, R.5
Dambacher, J.M.6
Deng, R.A.7
-
22
-
-
84922022656
-
Newsvendor Decisions under Supply Uncertainty
-
A.Käki, Anssi, J.LiesiöJuuso, A.SaloAhti, and S.TalluriSrinivas. 2015. “Newsvendor Decisions under Supply Uncertainty.” International Journal of Production Research 53 (5):1544–1560.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.5
, pp. 1544-1560
-
-
Käki, A.1
Liesiö, J.2
Salo, A.3
Talluri, S.4
-
24
-
-
77749251959
-
Quantitative Risk Assessment of CO2 Transport by Pipelines-A Review of Uncertainties and their Impacts
-
J.Koornneef, Joris, M.SpruijtMark, M.MolagMenso, A.RamírezAndrea, W.TurkenburgWim, and A.FaaijAndr. 2010. “Quantitative Risk Assessment of CO2 Transport by Pipelines-A Review of Uncertainties and their Impacts.” Journal of Hazardous Materials 177 (1–3):12–27.
-
(2010)
Journal of Hazardous Materials
, vol.177
, Issue.1-3
, pp. 12-27
-
-
Koornneef, J.1
Spruijt, M.2
Molag, M.3
Ramírez, A.4
Turkenburg, W.5
Faaij, A.6
-
25
-
-
84859434892
-
Modeling Risk based Maintenance using Fuzzy Analytic Network Process
-
G.Kumar, Goldy, and J.Maiti. 2012. “Modeling Risk based Maintenance using Fuzzy Analytic Network Process.” Expert Systems with Applications 39 (11):9946–9954.
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.11
, pp. 9946-9954
-
-
Kumar, G.1
Maiti, J.2
-
26
-
-
0031382208
-
Hybrid Fault Tree Analysis using Fuzzy Sets
-
C.-T.Lin, Ching-Torng, and M.-J.J.WangMao-Jiun J. 1997. “Hybrid Fault Tree Analysis using Fuzzy Sets.” Reliability Engineering & System Safety 58 (3):205–213.
-
(1997)
Reliability Engineering & System Safety
, vol.58
, Issue.3
, pp. 205-213
-
-
Lin, C.-T.1
Wang, M.-J.J.2
-
27
-
-
38049034303
-
-
Accuracy 2006: International Symposium on Spatial Accuracy Assessment in Natural Resources and Environmental Sciences, Lisbon. Portugal: Citeseer
-
K.E.Lowell, Kim E., and K.K.BenkeKurt K. 2006. “Uncertainty and Risk Analysis in Hydrological Models for Land-use Management.” In Accuracy 2006:International Symposium on Spatial Accuracy Assessment in Natural Resources and Environmental Sciences, 740–749, Lisbon. Portugal. Citeseer.
-
(2006)
Uncertainty and Risk Analysis in Hydrological Models for Land-use Management
, pp. 740-749
-
-
Lowell, K.E.1
Benke, K.K.2
-
28
-
-
84980584189
-
Chemical Engineering Dynamics. Von J. Ingham, I. Dunn, E. Heinzle und E. Prenusil. VCH Verlagsgesellschaft mbH, Weinheim 1994. 701 S. mit 430 Abb., geb., DM 276,-
-
W.Marquardt, 1995. “Chemical Engineering Dynamics. Von J. Ingham, I. Dunn, E. Heinzle und E. Prenusil. VCH Verlagsgesellschaft mbH, Weinheim 1994. 701 S. mit 430 Abb., geb., DM 276,-.” Chemie Ingenieur Technik 67 (4):500–501.
-
(1995)
Chemie Ingenieur Technik
, vol.67
, Issue.4
, pp. 500-501
-
-
Marquardt, W.1
-
29
-
-
0026944281
-
A Fuzzy Linguistics Model for Job Related Injury Risk Assessment
-
M.S.P.McCauley-Bell, M. S. Pamela, and A.B.BadiruAdedeji B. 1992. “A Fuzzy Linguistics Model for Job Related Injury Risk Assessment.” Computers & Industrial Engineering 23 (1):209–212. http://www.sciencedirect.com/science/article/pii/036083529290100X.
-
(1992)
Computers & Industrial Engineering
, vol.23
, Issue.1
, pp. 209-212
-
-
McCauley-Bell, M.S.P.1
Badiru, A.B.2
-
30
-
-
84938958803
-
Supplier Selection and Order Allocation in Closed-loop Supply Chain Systems using Hybrid Monte Carlo Simulation and Goal Programming
-
K.S.Moghaddam, Kamran S. 2015. “Supplier Selection and Order Allocation in Closed-loop Supply Chain Systems using Hybrid Monte Carlo Simulation and Goal Programming.” International Journal of Production Research 53 (20):6320–6338.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.20
, pp. 6320-6338
-
-
Moghaddam, K.S.1
-
31
-
-
84922832204
-
Mathematical Modelling of a Robust Inspection Process Plan: Taguchi and Monte Carlo Methods
-
M.Mohammadi, Mehrdad, A.SiadatAli, J.-Y.DantanJean-Yves, and R.Tavakkoli-MoghaddamReza. 2015. “Mathematical Modelling of a Robust Inspection Process Plan:Taguchi and Monte Carlo Methods.” International Journal of Production Research 53 (7):2202–2224.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.7
, pp. 2202-2224
-
-
Mohammadi, M.1
Siadat, A.2
Dantan, J.-Y.3
Tavakkoli-Moghaddam, R.4
-
32
-
-
0003749916
-
-
116, Thousand Oaks, CL: Sage Publications
-
C.Z.Mooney, Christopher Z. 1997. Monte Carlo Simulation, Vol. 116, Thousand Oaks, CL:Sage Publications.
-
(1997)
Monte Carlo Simulation
-
-
Mooney, C.Z.1
-
34
-
-
71649090843
-
Is Risk Analysis a Useful Tool for Improving Process Safety?
-
H.J.Pasman, S.Jung, K.Prem, W.J.Rogers, and X.Yang. 2009. “Is Risk Analysis a Useful Tool for Improving Process Safety?” Journal of Loss Prevention in the Process Industries 22 (6):769–777.
-
(2009)
Journal of Loss Prevention in the Process Industries
, vol.22
, Issue.6
, pp. 769-777
-
-
Pasman, H.J.1
Jung, S.2
Prem, K.3
Rogers, W.J.4
Yang, X.5
-
35
-
-
84856089912
-
Fuzzy Approach for Reducing Subjectivity in Estimating Occupational Accident Severity
-
A.Pinto, Abel, R.A.RibeiroRita A., and I.L.NunesIsabel L. 2012. “Fuzzy Approach for Reducing Subjectivity in Estimating Occupational Accident Severity.” Accident Analysis & Prevention 45:281–290.
-
(2012)
Accident Analysis & Prevention
, vol.45
, pp. 281-290
-
-
Pinto, A.1
Ribeiro, R.A.2
Nunes, I.L.3
-
36
-
-
0028532912
-
Uncertainty Representation and Propagation in Quantified Risk Assessment using Fuzzy Sets
-
J.Quelch, Janelle, and I.T.CameronIan T. 1994. “Uncertainty Representation and Propagation in Quantified Risk Assessment using Fuzzy Sets.” Journal of Loss Prevention in the Process Industries 7 (6):463–473.
-
(1994)
Journal of Loss Prevention in the Process Industries
, vol.7
, Issue.6
, pp. 463-473
-
-
Quelch, J.1
Cameron, I.T.2
-
38
-
-
57049179441
-
Predicting Risk of Water Quality Failures in Distribution Networks under Uncertainties using Fault-tree Analysis
-
R.Sadiq, Rehan, E.Saint-MartinElise, and Y.KleinerYehuda. 2008. “Predicting Risk of Water Quality Failures in Distribution Networks under Uncertainties using Fault-tree Analysis.” Urban Water Journal 5 (4):287–304.
-
(2008)
Urban Water Journal
, vol.5
, Issue.4
, pp. 287-304
-
-
Sadiq, R.1
Saint-Martin, E.2
Kleiner, Y.3
-
39
-
-
84874656003
-
Quantifying Risks in a Supply Chain Through Integration of Fuzzy AHP and Fuzzy TOPSIS
-
A.Samvedi, Avinash, V.JainVipul, and F.T.S.ChanFelix T. S. 2013. “Quantifying Risks in a Supply Chain Through Integration of Fuzzy AHP and Fuzzy TOPSIS.” International Journal of Production Research 51 (8):2433–2442.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.8
, pp. 2433-2442
-
-
Samvedi, A.1
Jain, V.2
Chan, F.T.S.3
-
41
-
-
84980536704
-
Process for Conducting Probabilistic Risk Assessment
-
U.S. Environmental Protection Agency (EPA). 2001. “Process for Conducting Probabilistic Risk Assessment.” RAGS Volume 3:Part A.
-
(2001)
RAGS Volume 3: Part A
-
-
-
42
-
-
2942516070
-
Modeling of Relative Collision Safety Including Driver Characteristics
-
A.M.Vadeby, 2004. “Modeling of Relative Collision Safety Including Driver Characteristics.” Accident Analysis and Prevention 36 (5):909–917.
-
(2004)
Accident Analysis and Prevention
, vol.36
, Issue.5
, pp. 909-917
-
-
Vadeby, A.M.1
-
43
-
-
84856083751
-
ISA Implementation and Uncertainty: A Literature Review and Expert Elicitation Study
-
J.-W.G.M.van der Pas, Jan-Willem G. M., V.A.W.J.MarchauVincent A. W. J., W.E.WalkerWarren E., G.P.Van Wee, and S.H.Vlassenroot. 2012. “ISA Implementation and Uncertainty:A Literature Review and Expert Elicitation Study.” Accident Analysis & Prevention 48:83–96.
-
(2012)
Accident Analysis & Prevention
, vol.48
, pp. 83-96
-
-
van der Pas, J.-W.G.M.1
Marchau, V.A.W.J.2
Walker, W.E.3
Van Wee, G.P.4
Vlassenroot, S.H.5
-
44
-
-
34447287061
-
A Fuzzy Group Decision Making Approach for Bridge Risk Assessment
-
Y.-M.Wang, Ying-Ming, and T.M.S.ElhagTaha M. S. 2007. “A Fuzzy Group Decision Making Approach for Bridge Risk Assessment.” Computers and Industrial Engineering 53 (1):137–148.
-
(2007)
Computers and Industrial Engineering
, vol.53
, Issue.1
, pp. 137-148
-
-
Wang, Y.-M.1
Elhag, T.M.S.2
-
45
-
-
84944715485
-
-
Uncertainty Modeling and Analysis, ISUMA 2003. Fourth International Symposium on, College Park, MD:
-
R.C.Wilcox, Robb C., and B.M.AyyubBilal M. 2003. “Uncertainty Modeling of Data and Uncertainty Propagation for Risk Studies.” Uncertainty Modeling and Analysis, ISUMA 2003. Fourth International Symposium on, College Park, MD. 184–191. doi:10.1109/ISUMA.2003.1236160.
-
(2003)
Uncertainty Modeling of Data and Uncertainty Propagation for Risk Studies
, pp. 184-191
-
-
Wilcox, R.C.1
Ayyub, B.M.2
-
46
-
-
34248666540
-
Fuzzy Sets
-
L.A.Zadeh, 1965. “Fuzzy Sets.” Information and Control 8 (3):338–353. http://www.sciencedirect.com/science/article/pii/S001999586590241X.
-
(1965)
Information and Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
47
-
-
49649152119
-
Similarity Relations and Fuzzy Orderings
-
L.A.Zadeh, 1971. “Similarity Relations and Fuzzy Orderings.” Information Sciences 3 (2):177–200.
-
(1971)
Information Sciences
, vol.3
, Issue.2
, pp. 177-200
-
-
Zadeh, L.A.1
-
49
-
-
54049155665
-
Reliability Engineering: Old Problems and New Challenges
-
E.Zio, Enrico. 2009. “Reliability Engineering:Old Problems and New Challenges.” Reliability Engineering & System Safety 94 (2):125–141.
-
(2009)
Reliability Engineering & System Safety
, vol.94
, Issue.2
, pp. 125-141
-
-
Zio, E.1
-
50
-
-
34250200106
-
-
RAMS ’06. Annual Reliability and Maintainability Symposium, 2006, Newport Beach, CA:
-
S.A.Zonouz, Saman Aliari, and S.G.MiremadiSeyed Ghassem. 2006. “A Fuzzy-Monte Carlo Simulation Approach for Fault Tree Analysis.” RAMS ’06. Annual Reliability and Maintainability Symposium, 2006, Newport Beach, CA. 428–433. doi:10.1109/RAMS.2006.1677412.
-
(2006)
A Fuzzy-Monte Carlo Simulation Approach for Fault Tree Analysis
, pp. 428-433
-
-
Zonouz, S.A.1
Miremadi, S.G.2
|