메뉴 건너뛰기




Volumn 53, Issue 7, 2015, Pages 2202-2224

Mathematical modelling of a robust inspection process plan: Taguchi and Monte Carlo methods

Author keywords

mathematical programming; Monte Carlo simulation; process inspection planning; robust design; Taguchi loss function

Indexed keywords

FUNCTIONS; GENETIC ALGORITHMS; INSPECTION; INTEGER PROGRAMMING; MATHEMATICAL PROGRAMMING; PRODUCT DESIGN; STOCHASTIC SYSTEMS; TAGUCHI METHODS;

EID: 84922832204     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.980460     Document Type: Article
Times cited : (40)

References (52)
  • 1
    • 0142216400 scopus 로고    scopus 로고
    • Process planning optimization for the manufacture of injection molds using a genetic algorithm
    • Alam, M. R., K. S. Lee, M. Rahman, and, Y. F. Zhang. 2003. " Process Planning Optimization for the Manufacture of Injection Molds Using a Genetic Algorithm." International Journal of Computer Integrated Manufacturing 16 (3): 181-191. 10.1080/0951192021000025742
    • (2003) International Journal of Computer Integrated Manufacturing , vol.16 , Issue.3 , pp. 181-191
    • Alam, M.R.1    Lee, K.S.2    Rahman, M.3    Zhang, Y.F.4
  • 4
    • 0030189573 scopus 로고    scopus 로고
    • Optimal allocation of inspection effort in a serial multi-stage production system
    • Bai, D. S., and, H. J. Yun. 1996. " Optimal Allocation of Inspection Effort in a Serial Multi-Stage Production System." Computer and Industrial Engineering 30 (3): 387-396. 10.1016/0360-8352(96)00008-3
    • (1996) Computer and Industrial Engineering , vol.30 , Issue.3 , pp. 387-396
    • Bai, D.S.1    Yun, H.J.2
  • 5
    • 0025262877 scopus 로고
    • A break-even quality level approach to location of inspection station in a multi-stage production process
    • Barad, M. 1990. " A Break-Even quality Level Approach to Location of Inspection Station in a Multi-stage Production Process." International Journal of Production Research 28 (1): 29-45. 10.1080/00207549008942682
    • (1990) International Journal of Production Research , vol.28 , Issue.1 , pp. 29-45
    • Barad, M.1
  • 6
    • 85008047921 scopus 로고    scopus 로고
    • Software defect reduction top 10 list
    • Basili, V., and, B. Boehm. 2001. " Software Defect Reduction Top 10 List." Computer 34 (1): 135-137.
    • (2001) Computer , vol.34 , Issue.1 , pp. 135-137
    • Basili, V.1    Boehm, B.2
  • 7
    • 33745457149 scopus 로고    scopus 로고
    • A robust design method using variable transformation and gauss-hermite integration
    • Beiqing, H., and, X. Du. 2006. " A Robust Design Method Using Variable Transformation and Gauss-Hermite Integration." International Journal for Numerical Methods in Engineering 66 (12): 1841-1858.
    • (2006) International Journal for Numerical Methods in Engineering , vol.66 , Issue.12 , pp. 1841-1858
    • Beiqing, H.1    Du, X.2
  • 8
    • 3543065005 scopus 로고    scopus 로고
    • On the behavior of ( / i, )-es optimizing functions disturbed by generalized noises
    • Beyer, H. G., M. Olhofer, and, B. Sendhoff. 2002. " On the Behavior of ( / i, )-es Optimizing Functions Disturbed by Generalized Noises." In Foundations of Genetic Algorithms.
    • (2002) Foundations of Genetic Algorithms
    • Beyer, H.G.1    Olhofer, M.2    Sendhoff, B.3
  • 10
    • 0023315289 scopus 로고
    • Strategic allocation of inspection effort in a serial, multi-product production system
    • Chakravarty, A. K., and, A. Shtub. 1987. " Strategic Allocation of Inspection Effort in a Serial, Multi-Product Production System." IIE Transactions 19 (1): 13-22. 10.1080/07408178708975364
    • (1987) IIE Transactions , vol.19 , Issue.1 , pp. 13-22
    • Chakravarty, A.K.1    Shtub, A.2
  • 12
    • 0342955073 scopus 로고    scopus 로고
    • Robustness optimization for constrained nonlinear programming problems
    • Das, I. 2000. " Robustness Optimization for Constrained Nonlinear Programming Problems." Engineering Optimization 32 (5): 585-618. 10.1080/03052150008941314
    • (2000) Engineering Optimization , vol.32 , Issue.5 , pp. 585-618
    • Das, I.1
  • 13
    • 79956280625 scopus 로고    scopus 로고
    • Uncertainty of measurement and conformity assessment: A review
    • Desimoni, E., and, B. Brunetti. 2011. " Uncertainty of Measurement and Conformity Assessment: A Review." Analytical and Bioanalytical Chemistry 400: 1729-1741. 10.1007/s00216-011-4776-y
    • (2011) Analytical and Bioanalytical Chemistry , vol.400 , pp. 1729-1741
    • Desimoni, E.1    Brunetti, B.2
  • 14
    • 60249094324 scopus 로고    scopus 로고
    • A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis
    • Ferreira, R. J. P., A. T. Almeida, and, C. Cavalcante. 2009. " A Multi-criteria Decision Model to Determine Inspection Intervals of Condition Monitoring Based on Delay Time Analysis." Reliability Engineering and System Safety 94: 905-912. 10.1016/j.ress.2008.10.001
    • (2009) Reliability Engineering and System Safety , vol.94 , pp. 905-912
    • Ferreira, R.J.P.1    Almeida, A.T.2    Cavalcante, C.3
  • 16
    • 0036530729 scopus 로고    scopus 로고
    • Robust optimization in discrete design space for constrained problems
    • Gyung-Jin, P., and, K. H. Lee. 2002. " Robust Optimization in Discrete Design Space for Constrained Problems." AIAA Journal 40 (4): 774-780.
    • (2002) AIAA Journal , vol.40 , Issue.4 , pp. 774-780
    • Gyung-Jin, P.1    Lee, K.H.2
  • 17
    • 13544263209 scopus 로고    scopus 로고
    • A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
    • Hanne, T., and, S. Nickel. 2005. " A Multiobjective Evolutionary Algorithm for Scheduling and Inspection Planning in Software Development Projects." European Journal of Operational Research 167: 663-678. 10.1016/j.ejor.2004.07.014
    • (2005) European Journal of Operational Research , vol.167 , pp. 663-678
    • Hanne, T.1    Nickel, S.2
  • 19
    • 0015681690 scopus 로고
    • Imperfect inspection in a in a multi-workstation production process
    • Hurst, E. 1973. " Imperfect Inspection in a in a Multi-Workstation Production Process." Management Science 20: 378-384. 10.1287/mnsc.20.3.378
    • (1973) Management Science , vol.20 , pp. 378-384
    • Hurst, E.1
  • 20
    • 80053184383 scopus 로고    scopus 로고
    • Product-specific adaption of conformity assessment criteria and their financial consequences
    • Hinrichs, W. 2011. " Product-Specific Adaption of Conformity Assessment Criteria and Their Financial Consequences." Journal of Production Engineering Research and Development 5: 549-556. 10.1007/s11740-011-0329-7
    • (2011) Journal of Production Engineering Research and Development , vol.5 , pp. 549-556
    • Hinrichs, W.1
  • 21
    • 0024702296 scopus 로고
    • Evaluating the impact of operating environments on MRP system nervousness
    • Ho, C. 1989. " Evaluating the Impact of Operating Environments on MRP System Nervousness." International Journal of Production Research 27: 1115-1135. 10.1080/00207548908942611
    • (1989) International Journal of Production Research , vol.27 , pp. 1115-1135
    • Ho, C.1
  • 25
    • 35248860704 scopus 로고    scopus 로고
    • Trade-off between performance and robustness: An evolutionary multiobjective approach
    • Jin, Y., and, B. Sendhoff. 2003. " Trade-off between Performance and Robustness: An Evolutionary Multiobjective Approach." Lecture Note in Computer Science 2632: 237-251. 10.1007/3-540-36970-8
    • (2003) Lecture Note in Computer Science , vol.2632 , pp. 237-251
    • Jin, Y.1    Sendhoff, B.2
  • 27
    • 0003070321 scopus 로고
    • Process capability indices
    • Kane, V. E. 1986. " Process Capability Indices." Journal of Quality Technology 18 (1): 41-52.
    • (1986) Journal of Quality Technology , vol.18 , Issue.1 , pp. 41-52
    • Kane, V.E.1
  • 29
    • 0035175069 scopus 로고    scopus 로고
    • Integration of process planning and scheduling using simulation-based genetic algorithms
    • Lee, H., and, S. S. Kim. 2001. " Integration of Process Planning and Scheduling Using Simulation-based Genetic Algorithms." International Journal of Advanced Manufacturing Technology 18: 586-590. 10.1007/s001700170035
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , pp. 586-590
    • Lee, H.1    Kim, S.S.2
  • 30
    • 0031703397 scopus 로고    scopus 로고
    • Planning quality inspection operations in multistage manufacturing systems with inspection errors
    • Lee, J., and, S. Unnikrishnan. 1998. " Planning Quality Inspection Operations in Multistage Manufacturing Systems with Inspection Errors." International Journal of Production Research 36 (1): 141-155. 10.1080/002075498193976
    • (1998) International Journal of Production Research , vol.36 , Issue.1 , pp. 141-155
    • Lee, J.1    Unnikrishnan, S.2
  • 31
    • 0000140746 scopus 로고
    • Allocation of screening inspection effort - Dynamic programming approach
    • Lindsay, G. F., and, A. B. Bishop. 1964. " Allocation of Screening Inspection Effort-Dynamic Programming Approach." Management Science 10 (2): 343-352.
    • (1964) Management Science , vol.10 , Issue.2 , pp. 343-352
    • Lindsay, G.F.1    Bishop, A.B.2
  • 37
    • 84985801795 scopus 로고
    • Location of quality inspection stations: An experimental assessment of five normative heuristics
    • Peters, M. H., and, W. W. Williams. 1984. " Location of Quality Inspection Stations: An Experimental Assessment of Five Normative Heuristics." Decision Science 15 (3): 389-408. 10.1111/deci.1984.15.issue-3
    • (1984) Decision Science , vol.15 , Issue.3 , pp. 389-408
    • Peters, M.H.1    Williams, W.W.2
  • 39
    • 84861583832 scopus 로고    scopus 로고
    • A methodology for the quantification of value-adding by manufacturing metrology
    • Savio, E. 2012. " A Methodology for the Quantification of Value-adding by Manufacturing Metrology." CIRP Annals-Manufacturing Technology 61: 503-506. 10.1016/j.cirp.2012.03.019
    • (2012) CIRP Annals - Manufacturing Technology , vol.61 , pp. 503-506
    • Savio, E.1
  • 40
    • 0037141481 scopus 로고    scopus 로고
    • Inspection resource assignment in a multistage manufacturing system with inspection error model
    • Shiau, Y. R. 2002. " Inspection Resource Assignment in a Multistage Manufacturing System with Inspection Error Model." International Journal of Production Research 40 (8): 1787-1806. 10.1080/00207540110119982
    • (2002) International Journal of Production Research , vol.40 , Issue.8 , pp. 1787-1806
    • Shiau, Y.R.1
  • 41
    • 0037708443 scopus 로고    scopus 로고
    • Inspection allocation planning for a multiple quality characteristic advanced manufacturing system
    • Shiau, Y. R. 2003a. " Inspection Allocation Planning for a Multiple Quality Characteristic Advanced Manufacturing System." International Journal of Advanced Manufacturing Technology 21: 494-500. 10.1007/s001700300058
    • (2003) International Journal of Advanced Manufacturing Technology , vol.21 , pp. 494-500
    • Shiau, Y.R.1
  • 42
    • 0346243614 scopus 로고    scopus 로고
    • Quick decision-making support for inspection allocation planning with rapidly changing customer requirements
    • Shiau, Y. R. 2003b. " Quick Decision-making Support for Inspection Allocation Planning with Rapidly Changing Customer Requirements." International Journal of Advanced Manufacturing Technology 22 (9-10): 633-640. 10.1007/s00170-002-1521-x
    • (2003) International Journal of Advanced Manufacturing Technology , vol.22 , Issue.910 , pp. 633-640
    • Shiau, Y.R.1
  • 43
    • 34249870610 scopus 로고    scopus 로고
    • Concurrent process/inspection planning for a customized manufacturing system based on genetic algorithm
    • Shiau, Y. R., M. H. Lin, and, W. C. Chuang. 2007. " Concurrent Process/Inspection Planning for a Customized Manufacturing System Based on Genetic Algorithm." International Journal of Advanced Manufacturing Technology 33: 746-755. 10.1007/s00170-006-0486-6
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , pp. 746-755
    • Shiau, Y.R.1    Lin, M.H.2    Chuang, W.C.3
  • 44
    • 84870297386 scopus 로고    scopus 로고
    • Genetic-algorithms-based algorithm portfolio for inventory routing problem with stochastic demand
    • Shukla, N., M. K. Tiwari, and, D. Ceglarek. 2013. " Genetic-Algorithms-based Algorithm Portfolio for Inventory Routing Problem with Stochastic Demand." International Journal of Production Research 51 (1): 118-137. 10.1080/00207543.2011.653010
    • (2013) International Journal of Production Research , vol.51 , Issue.1 , pp. 118-137
    • Shukla, N.1    Tiwari, M.K.2    Ceglarek, D.3
  • 46
    • 70450016760 scopus 로고    scopus 로고
    • A review of practices for robust design methodology
    • Torben, H., M. Arvidsson, and, I. Gremyr. 2009. " A Review of Practices for Robust Design Methodology." Journal of Engineering Design 20 (6): 645-657.
    • (2009) Journal of Engineering Design , vol.20 , Issue.6 , pp. 645-657
    • Torben, H.1    Arvidsson, M.2    Gremyr, I.3
  • 48
    • 77953264864 scopus 로고    scopus 로고
    • A procedure for robust design: Minimizing variations caused by noise factors and control factors
    • Wei, C., J. K. Allen, K. L. Tsui, and, F. Mistree. 2007. " A Procedure for Robust Design: Minimizing Variations Caused by Noise Factors and Control Factors." Journal of Mechanical Design 1-8.
    • (2007) Journal of Mechanical Design , pp. 1-8
    • Wei, C.1    Allen, J.K.2    Tsui, K.L.3    Mistree, F.4
  • 49
    • 0010945943 scopus 로고
    • The analysis of a simple class of multistage inspection plans
    • White, L. S. 1966. " The Analysis of a Simple Class of Multistage Inspection Plans." Management Science 12 (7): 685-693. 10.1287/mnsc.12.9.685
    • (1966) Management Science , vol.12 , Issue.7 , pp. 685-693
    • White, L.S.1
  • 50
    • 0034250264 scopus 로고    scopus 로고
    • Methodology for managing the effect of uncertainty in simulation-based design
    • Xiaoping, D., and, W. Chen. 2000. " Methodology for Managing the Effect of Uncertainty in Simulation-based Design." AIAA Journal 38 (8): 1471-1478.
    • (2000) AIAA Journal , vol.38 , Issue.8 , pp. 1471-1478
    • Xiaoping, D.1    Chen, W.2
  • 51
    • 0023435379 scopus 로고
    • Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach
    • Yum, B. J., and, E. D. McDowell. 1987. " Optimal Inspection Policies in a Serial Production System including Scrap Rework and Repair: An MILP Approach." International Journal of Production Research 25 (8): 1451-1464. 10.1080/00207548708919925
    • (1987) International Journal of Production Research , vol.25 , Issue.8 , pp. 1451-1464
    • Yum, B.J.1    McDowell, E.D.2
  • 52
    • 67349252288 scopus 로고    scopus 로고
    • Computer-aided inspection planning - The state of the art
    • Zhao, F., X. Xu, and, S. Q. Xie. 2009. " Computer-aided Inspection Planning-the State of the Art." Computers in Industry 60: 453-466. 10.1016/j.compind.2009.02.002
    • (2009) Computers in Industry , vol.60 , pp. 453-466
    • Zhao, F.1    Xu, X.2    Xie, S.Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.