메뉴 건너뛰기




Volumn 96, Issue , 2016, Pages 180-191

A bi-objective truck scheduling problem in a cross-docking center with probability of breakdown for trucks

Author keywords

Breakdown; Cross docking; Meta heuristics; Multi objective optimization; Response surface methodology; Truck scheduling

Indexed keywords

AUTOMOBILES; DISTRIBUTION FUNCTIONS; DOCKING; GENETIC ALGORITHMS; HEURISTIC METHODS; MULTIOBJECTIVE OPTIMIZATION; OPTIMIZATION; POISSON DISTRIBUTION; SCHEDULING; SIMULATED ANNEALING; STATISTICAL MECHANICS; SURFACE PROPERTIES;

EID: 84964063232     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2016.03.023     Document Type: Article
Times cited : (46)

References (37)
  • 1
    • 79751535966 scopus 로고    scopus 로고
    • A bounded dynamic programming approach to schedule operations in a cross docking platform
    • G. Alpan, R. Larbi, and B. Penz A bounded dynamic programming approach to schedule operations in a cross docking platform Computers & Industrial Engineering 60 3 2011 385 396
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.3 , pp. 385-396
    • Alpan, G.1    Larbi, R.2    Penz, B.3
  • 3
    • 84858748274 scopus 로고    scopus 로고
    • Cross-docking: State of the art
    • J. van Belle, P. Valckenaers, and D. Cattrysse Cross-docking: State of the art Omega 40 6 2012 827 846
    • (2012) Omega , vol.40 , Issue.6 , pp. 827-846
    • Van Belle, J.1    Valckenaers, P.2    Cattrysse, D.3
  • 5
    • 78049529305 scopus 로고    scopus 로고
    • Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage
    • A.R. Boloori Arabani, S.M.T. Fatemi Ghomi, and M. Zandieh Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage Expert Systems with Applications 38 3 2011 1964 1979
    • (2011) Expert Systems with Applications , vol.38 , Issue.3 , pp. 1964-1979
    • Boloori Arabani, A.R.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 6
    • 80053574069 scopus 로고    scopus 로고
    • Multi-objective genetic-based algorithms for a cross-docking scheduling problem
    • A. Boloori Arabani, M. Zandieh, and S.M.T.F. Ghomi Multi-objective genetic-based algorithms for a cross-docking scheduling problem Applied Soft Computing 11 8 2011 4954 4970
    • (2011) Applied Soft Computing , vol.11 , Issue.8 , pp. 4954-4970
    • Boloori Arabani, A.1    Zandieh, M.2    Ghomi, S.M.T.F.3
  • 7
    • 68249114212 scopus 로고    scopus 로고
    • Truck scheduling at zero-inventory cross docking terminals
    • N. Boysen Truck scheduling at zero-inventory cross docking terminals Computers & Operations Research 37 1 2010 32 41
    • (2010) Computers & Operations Research , vol.37 , Issue.1 , pp. 32-41
    • Boysen, N.1
  • 8
    • 77952544548 scopus 로고    scopus 로고
    • Cross dock scheduling: Classification, literature review and research agenda
    • N. Boysen, and M. Fliedner Cross dock scheduling: Classification, literature review and research agenda Omega 38 6 2010 413 422
    • (2010) Omega , vol.38 , Issue.6 , pp. 413-422
    • Boysen, N.1    Fliedner, M.2
  • 9
    • 71149103397 scopus 로고    scopus 로고
    • Scheduling inbound and outbound trucks at cross docking terminals
    • N. Boysen, M. Fliedner, and A. Scholl Scheduling inbound and outbound trucks at cross docking terminals OR Spectrum 32 1 2008 135 161
    • (2008) OR Spectrum , vol.32 , Issue.1 , pp. 135-161
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 10
    • 52049122618 scopus 로고    scopus 로고
    • Minimizing the makespan in a two-machine cross-docking flow shop problem
    • F. Chen, and C.-Y. Lee Minimizing the makespan in a two-machine cross-docking flow shop problem European Journal of Operational Research 193 1 2009 59 72
    • (2009) European Journal of Operational Research , vol.193 , Issue.1 , pp. 59-72
    • Chen, F.1    Lee, C.-Y.2
  • 11
    • 56549110639 scopus 로고    scopus 로고
    • Minimizing makespan in two-stage hybrid cross docking scheduling problem
    • F. Chen, and K. Song Minimizing makespan in two-stage hybrid cross docking scheduling problem Computers & Operations Research 36 6 2009 2066 2073
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 2066-2073
    • Chen, F.1    Song, K.2
  • 13
    • 80053916961 scopus 로고    scopus 로고
    • The multi-echelon vehicle routing problem with cross docking in supply chain management
    • R. Dondo, C.A. Méndez, and J. Cerdá The multi-echelon vehicle routing problem with cross docking in supply chain management Computers & Chemical Engineering 35 12 2011 3002 3024
    • (2011) Computers & Chemical Engineering , vol.35 , Issue.12 , pp. 3002-3024
    • Dondo, R.1    Méndez, C.A.2    Cerdá, J.3
  • 14
    • 78650173663 scopus 로고    scopus 로고
    • An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems
    • S. Forouharfard, and M. Zandieh An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems The International Journal of Advanced Manufacturing Technology 51 9-12 2010 1179 1193
    • (2010) The International Journal of Advanced Manufacturing Technology , vol.51 , Issue.9-12 , pp. 1179-1193
    • Forouharfard, S.1    Zandieh, M.2
  • 17
    • 84864816923 scopus 로고    scopus 로고
    • Cost-stable truck scheduling at a cross-dock facility with unknown truck arrivals: A meta-heuristic approach
    • D. Konur, and M.M. Golias Cost-stable truck scheduling at a cross-dock facility with unknown truck arrivals: A meta-heuristic approach Transportation Research Part E: Logistics and Transportation Review 49 1 2013 71 91
    • (2013) Transportation Research Part E: Logistics and Transportation Review , vol.49 , Issue.1 , pp. 71-91
    • Konur, D.1    Golias, M.M.2
  • 18
    • 78549247074 scopus 로고    scopus 로고
    • Scheduling cross docking operations under full, partial and no information on inbound arrivals
    • R. Larbi, G. Alpan, P. Baptiste, and B. Penz Scheduling cross docking operations under full, partial and no information on inbound arrivals Computers & Operations Research 38 6 2011 889 900
    • (2011) Computers & Operations Research , vol.38 , Issue.6 , pp. 889-900
    • Larbi, R.1    Alpan, G.2    Baptiste, P.3    Penz, B.4
  • 19
    • 33750203805 scopus 로고    scopus 로고
    • Vehicle routing scheduling for cross-docking in the supply chain
    • Y.H. Lee, J.W. Jung, and K.M. Lee Vehicle routing scheduling for cross-docking in the supply chain Computers & Industrial Engineering 51 2 2006 247 256
    • (2006) Computers & Industrial Engineering , vol.51 , Issue.2 , pp. 247-256
    • Lee, Y.H.1    Jung, J.W.2    Lee, K.M.3
  • 20
    • 84865861250 scopus 로고    scopus 로고
    • Two hybrid differential evolution algorithms for optimal inbound and outbound truck sequencing in cross docking operations
    • T.W. Liao, P.J. Egbelu, and P.C. Chang Two hybrid differential evolution algorithms for optimal inbound and outbound truck sequencing in cross docking operations Applied Soft Computing 12 11 2012 3683 3697
    • (2012) Applied Soft Computing , vol.12 , Issue.11 , pp. 3683-3697
    • Liao, T.W.1    Egbelu, P.J.2    Chang, P.C.3
  • 21
    • 84869502731 scopus 로고    scopus 로고
    • Simultaneous dock assignment and sequencing of inbound trucks under a fixed outbound truck schedule in multi-door cross docking operations
    • T.W. Liao, P.J. Egbelu, and P.C. Chang Simultaneous dock assignment and sequencing of inbound trucks under a fixed outbound truck schedule in multi-door cross docking operations International Journal of Production Economics 141 1 2013 212 229
    • (2013) International Journal of Production Economics , vol.141 , Issue.1 , pp. 212-229
    • Liao, T.W.1    Egbelu, P.J.2    Chang, P.C.3
  • 22
    • 67349220457 scopus 로고    scopus 로고
    • Genetic-based scheduling to solve the parcel hub scheduling problem
    • D.L. McWilliams Genetic-based scheduling to solve the parcel hub scheduling problem Computers & Industrial Engineering 56 4 2009 1607 1616
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.4 , pp. 1607-1616
    • McWilliams, D.L.1
  • 23
    • 84899005890 scopus 로고    scopus 로고
    • A genetic based scheduling algorithm for the PHSP with unequal batch size inbound trailers
    • D.L. McWilliams A genetic based scheduling algorithm for the PHSP with unequal batch size inbound trailers Journal of Industrial and Systems Engineering 4 3 2010 167 182
    • (2010) Journal of Industrial and Systems Engineering , vol.4 , Issue.3 , pp. 167-182
    • McWilliams, D.L.1
  • 25
    • 41549133161 scopus 로고    scopus 로고
    • Minimizing the completion time of the transfer operations in a central parcel consolidation terminal with unequal-batch-size inbound trailers
    • D.L. McWilliams, P.M. Stanfield, and C.D. Geiger Minimizing the completion time of the transfer operations in a central parcel consolidation terminal with unequal-batch-size inbound trailers Computers & Industrial Engineering 54 4 2008 709 720
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.4 , pp. 709-720
    • McWilliams, D.L.1    Stanfield, P.M.2    Geiger, C.D.3
  • 26
    • 84875242109 scopus 로고    scopus 로고
    • A hybrid simulated annealing algorithm for location and routing scheduling problems with cross-docking in the supply chain
    • S.M. Mousavi, and R. Tavakkoli-Moghaddam A hybrid simulated annealing algorithm for location and routing scheduling problems with cross-docking in the supply chain Journal of Manufacturing Systems 32 2 2013 334 346
    • (2013) Journal of Manufacturing Systems , vol.32 , Issue.2 , pp. 334-346
    • Mousavi, S.M.1    Tavakkoli-Moghaddam, R.2
  • 28
    • 44649132578 scopus 로고    scopus 로고
    • An evaluation of new heuristics for the location of cross-docks distribution centers in supply chain network design
    • A. Ross, and V. Jayaraman An evaluation of new heuristics for the location of cross-docks distribution centers in supply chain network design Computers & Industrial Engineering 55 1 2008 64 79
    • (2008) Computers & Industrial Engineering , vol.55 , Issue.1 , pp. 64-79
    • Ross, A.1    Jayaraman, V.2
  • 29
    • 84870514411 scopus 로고    scopus 로고
    • Scheduling incoming and outgoing trucks at cross docking terminals to minimize the storage cost
    • R. Sadykov Scheduling incoming and outgoing trucks at cross docking terminals to minimize the storage cost Annals of Operations Research 201 1 2012 423 440
    • (2012) Annals of Operations Research , vol.201 , Issue.1 , pp. 423-440
    • Sadykov, R.1
  • 30
    • 84859728204 scopus 로고    scopus 로고
    • A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock
    • M. Shakeri, M.Y.H. Low, S.J. Turner, and E.W. Lee A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock Computers & Operations Research 39 11 2012 2564 2577
    • (2012) Computers & Operations Research , vol.39 , Issue.11 , pp. 2564-2577
    • Shakeri, M.1    Low, M.Y.H.2    Turner, S.J.3    Lee, E.W.4
  • 33
    • 0142000477 scopus 로고    scopus 로고
    • Differential evolution - A simple and efficient heuristic for global optimization over continuous spaces
    • R. Storn, and K. Price Differential evolution - A simple and efficient heuristic for global optimization over continuous spaces Journal of Global Optimization 11 4 1997 341 359
    • (1997) Journal of Global Optimization , vol.11 , Issue.4 , pp. 341-359
    • Storn, R.1    Price, K.2
  • 35
    • 72149124796 scopus 로고    scopus 로고
    • Scheduling trucks in cross-docking systems: Robust meta-heuristics
    • B. Vahdani, and M. Zandieh Scheduling trucks in cross-docking systems: Robust meta-heuristics Computers & Industrial Engineering 58 1 2010 12 24
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.1 , pp. 12-24
    • Vahdani, B.1    Zandieh, M.2
  • 37
    • 34548432064 scopus 로고    scopus 로고
    • Scheduling of inbound and outbound trucks in cross docking systems with temporary storage
    • W. Yu, and P.J. Egbelu Scheduling of inbound and outbound trucks in cross docking systems with temporary storage European Journal of Operational Research 184 1 2008 377 396
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 377-396
    • Yu, W.1    Egbelu, P.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.