메뉴 건너뛰기




Volumn 49, Issue 5-8, 2010, Pages 741-756

A multi-criteria cross-docking scheduling with just-in-time approach

Author keywords

Cross docking; Earliness; Just in time scheduling; Multi criteria scheduling; Tardiness

Indexed keywords

CROSSDOCKING; DISTRIBUTION NETWORK; INBOUND TRAILERS; JUST-IN-TIME APPROACH; JUST-IN-TIME SCHEDULING; META HEURISTICS; MULTI CRITERIA SCHEDULING; MULTI-CRITERIA; OBJECTIVE FUNCTIONS; PRIMARY OBJECTIVE; PRODUCT DELIVERY; SCHEDULING PROBLEM; SYSTEM'S PERFORMANCE;

EID: 77953609726     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-009-2429-5     Document Type: Article
Times cited : (82)

References (40)
  • 1
    • 60349093593 scopus 로고    scopus 로고
    • Heuristics for a two-stage assembly flowshop with bi-criteria of maximum lateness and makespan
    • 1179.90117 10.1016/j.cor.2008.11.018 2586541
    • FS Al-Anzi A Allahverdi 2009 Heuristics for a two-stage assembly flowshop with bi-criteria of maximum lateness and makespan Comput Oper Res 36 2682 2689 1179.90117 10.1016/j.cor.2008.11.018 2586541
    • (2009) Comput Oper Res , vol.36 , pp. 2682-2689
    • Al-Anzi, F.S.1    Allahverdi, A.2
  • 2
    • 51249119858 scopus 로고    scopus 로고
    • Solving multi-criteria scheduling flow shop problem through compromise programming and satisfaction functions
    • 1157.90545 10.1016/j.ejor.2007.09.038 2454784
    • MA Allouche B Aouni JM Martel T Loukil A Rebai 2009 Solving multi-criteria scheduling flow shop problem through compromise programming and satisfaction functions Eur J Oper Res 192 460 467 1157.90545 10.1016/j.ejor.2007.09.038 2454784
    • (2009) Eur J Oper Res , vol.192 , pp. 460-467
    • Allouche, M.A.1    Aouni, B.2    Martel, J.M.3    Loukil, T.4    Rebai, A.5
  • 3
    • 62349141627 scopus 로고    scopus 로고
    • Cross-docking - Just in time scheduling: An alternative solution approach
    • 1163.90478 10.1057/palgrave.jors.2602590
    • GA Alvarez-Perez JL Gonzalez-Valarde JW Fowler 2009 Cross-docking - just in time scheduling: an alternative solution approach J Oper Res Soc 60 554 564 1163.90478 10.1057/palgrave.jors.2602590
    • (2009) J Oper Res Soc , vol.60 , pp. 554-564
    • Alvarez-Perez, G.A.1    Gonzalez-Valarde, J.L.2    Fowler, J.W.3
  • 4
    • 0032026875 scopus 로고    scopus 로고
    • Integrated scheduling of material handling and manufacturing activities for just in time production of complex assemblies
    • 0947.90568 10.1080/002075498193624
    • MF Anwar R Nagi 1998 Integrated scheduling of material handling and manufacturing activities for just in time production of complex assemblies Int J Prod Res 36 3 653 681 0947.90568 10.1080/002075498193624
    • (1998) Int J Prod Res , vol.36 , Issue.3 , pp. 653-681
    • Anwar, M.F.1    Nagi, R.2
  • 5
    • 10444242132 scopus 로고    scopus 로고
    • Effective cross-docking for improving distribution efficiencies
    • M Apte S Viswanathan 2000 Effective cross-docking for improving distribution efficiencies Int J Logist 3 3 291 302
    • (2000) Int J Logist , vol.3 , Issue.3 , pp. 291-302
    • Apte, M.1    Viswanathan, S.2
  • 6
    • 3042532019 scopus 로고    scopus 로고
    • The best shape for a cross-dock
    • 10.1287/trsc.1030.0077
    • JJ Bartholdi III KR Gue 2004 The best shape for a cross-dock Transp Sci 38 235 244 10.1287/trsc.1030.0077
    • (2004) Transp Sci , vol.38 , pp. 235-244
    • Bartholdi Iii, J.J.1    Gue, K.R.2
  • 7
    • 1342265978 scopus 로고    scopus 로고
    • An empirical study of policies to integrate reactive scheduling and control in just in time job shop environments
    • 1069.90039
    • R Bollapragada NM Sadeh 2004 An empirical study of policies to integrate reactive scheduling and control in just in time job shop environments Int J Prod Res 42 4 693 718 1069.90039
    • (2004) Int J Prod Res , vol.42 , Issue.4 , pp. 693-718
    • Bollapragada, R.1    Sadeh, N.M.2
  • 8
    • 68249114212 scopus 로고    scopus 로고
    • Trailer scheduling at zero-inventory cross-docking terminals
    • 10.1016/j.cor.2009.03.010
    • N Boysen 2009 Trailer scheduling at zero-inventory cross-docking terminals Comput Oper Res 10.1016/j.cor.2009.03.010
    • (2009) Comput Oper Res
    • Boysen, N.1
  • 9
    • 71149103397 scopus 로고    scopus 로고
    • Scheduling inbound and outbound trailers at cross-docking terminals
    • 10.1007/s00291-008-0139-2
    • N Boysen M Fliedner A Scholl 2008 Scheduling inbound and outbound trailers at cross-docking terminals OR Spectrum 10.1007/s00291-008-0139-2
    • (2008) OR Spectrum
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 10
    • 51149115118 scopus 로고    scopus 로고
    • Optimizing inbound and outbound door assignments in less-than-trailerload cross-docks
    • 10.1080/07408170802167688
    • YA Bozer HJ Carlo 2008 Optimizing inbound and outbound door assignments in less-than-trailerload cross-docks IIE Trans 40 11 1007 1018 10.1080/07408170802167688
    • (2008) IIE Trans , vol.40 , Issue.11 , pp. 1007-1018
    • Bozer, Y.A.1    Carlo, H.J.2
  • 11
    • 21444450253 scopus 로고    scopus 로고
    • Multiple crossdocks with inventory and time windows
    • DOI 10.1016/j.cor.2004.06.002, PII S0305054804001200
    • P Chen Y Guo A Lim B Rodrigues 2006 Multiple cross-docks with inventory and time windows Comput Oper Res 33 43 63 1089.90007 10.1016/j.cor.2004.06.002 (Pubitemid 40915202)
    • (2006) Computers and Operations Research , vol.33 , Issue.1 , pp. 43-63
    • Chen, P.1    Guo, Y.2    Lim, A.3    Rodrigues, B.4
  • 12
    • 34347241980 scopus 로고    scopus 로고
    • Cross-docking logistics scheduling problem and its approximation and exact algorithms
    • F Chen KL Song 2006 Cross-docking logistics scheduling problem and its approximation and exact algorithms Ind Eng Manage 6 53 58
    • (2006) Ind Eng Manage , vol.6 , pp. 53-58
    • Chen, F.1    Song, K.L.2
  • 14
    • 33748697397 scopus 로고    scopus 로고
    • Genetic algorithms for layout optimization in crossdocking operations of a manufacturing plant
    • DOI 10.1080/00207540500521147, PII N226H447831611U6
    • K Hauser CH Chung 2006 Genetic algorithms for layout optimization in cross-docking operations of a manufacturing plant Int J Prod Res 44 21 4663 4680 10.1080/00207540500521147 (Pubitemid 44395474)
    • (2006) International Journal of Production Research , vol.44 , Issue.21 , pp. 4663-4680
    • Hauser, K.1    Chung, C.H.2
  • 17
    • 33750203805 scopus 로고    scopus 로고
    • Vehicle routing scheduling for cross-docking in the supply chain
    • DOI 10.1016/j.cie.2006.02.006, PII S036083520600091X
    • WH Lee JW Jung KM Lee 2006 Vehicle routing scheduling for cross-docking in the supply chain Comput Ind Eng 51 247 256 10.1016/j.cie.2006.02.006 (Pubitemid 44604431)
    • (2006) Computers and Industrial Engineering , vol.51 , Issue.2 , pp. 247-256
    • Lee, Y.H.1    Jung, J.W.2    Lee, K.M.3
  • 18
    • 33749150331 scopus 로고    scopus 로고
    • Earliness-tardiness production planning for just-in-time manufacturing: A unifying approach by goal programming
    • DOI 10.1016/j.ejor.2005.06.009, PII S0377221705005096
    • L Li DJ Fonseca DS Chen 2006 Earliness-tardiness production planning for just in time manufacturing: A unifying approach by goal programming Eur J Oper Res 175 508 515 10.1016/j.ejor.2005.06.009 (Pubitemid 44470742)
    • (2006) European Journal of Operational Research , vol.175 , Issue.1 , pp. 508-515
    • Li, L.1    Fonseca, D.J.2    Chen, D.-S.3
  • 19
    • 9744228000 scopus 로고    scopus 로고
    • JIT scheduling with time windows
    • 1088.90026 10.1057/palgrave.jors.2601812
    • Y Li A Lim B Rodrigues 2004 JIT scheduling with time windows J Oper Res Soc 55 1342 1351 1088.90026 10.1057/palgrave.jors.2601812
    • (2004) J Oper Res Soc , vol.55 , pp. 1342-1351
    • Li, Y.1    Lim, A.2    Rodrigues, B.3
  • 20
    • 41149134008 scopus 로고    scopus 로고
    • An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs
    • DOI 10.1016/j.cor.2007.03.006, PII S0305054807000731
    • CL Li G Mosheiov U Yovel 2008 An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs Comput Oper Res 35 3612 3619 1170.90395 10.1016/j.cor.2007.03.006 (Pubitemid 351443066)
    • (2008) Computers and Operations Research , vol.35 , Issue.11 , pp. 3612-3619
    • Li, C.-L.1    Mosheiov, G.2    Yovel, U.3
  • 22
    • 59049083361 scopus 로고    scopus 로고
    • Multi-criteria sequence-dependent job shop scheduling using genetic algorithms
    • 10.1016/j.cie.2008.05.002
    • A Manikas YL Chang 2009 Multi-criteria sequence-dependent job shop scheduling using genetic algorithms Comput Ind Eng 56 179 185 10.1016/j.cie.2008.05.002
    • (2009) Comput Ind Eng , vol.56 , pp. 179-185
    • Manikas, A.1    Chang, Y.L.2
  • 23
    • 66149094973 scopus 로고    scopus 로고
    • Proactive, dynamic and multi-criteria scheduling of maintenance activities
    • 10.1080/00207540802311106
    • F Marmier C Varnier N Zerhouni 2009 Proactive, dynamic and multi-criteria scheduling of maintenance activities Int J Prod Res 47 8 2185 2201 10.1080/00207540802311106
    • (2009) Int J Prod Res , vol.47 , Issue.8 , pp. 2185-2201
    • Marmier, F.1    Varnier, C.2    Zerhouni, N.3
  • 24
    • 50849137192 scopus 로고    scopus 로고
    • Trailer dock assignment problem with operational time constraint within cross-docks
    • 1181.90122 10.1016/j.ejor.2007.09.031
    • Z Miao A Lim H Ma 2009 Trailer dock assignment problem with operational time constraint within cross-docks Eur J Oper Res 192 105 115 1181.90122 10.1016/j.ejor.2007.09.031
    • (2009) Eur J Oper Res , vol.192 , pp. 105-115
    • Miao, Z.1    Lim, A.2    Ma, H.3
  • 26
    • 77953612607 scopus 로고    scopus 로고
    • Manage inventory in a real-time environment
    • T Moore C Roy 1997 Manage inventory in a real-time environment Transp Distrib 38 11 93 97
    • (1997) Transp Distrib , vol.38 , Issue.11 , pp. 93-97
    • Moore, T.1    Roy, C.2
  • 27
    • 47749087484 scopus 로고    scopus 로고
    • A multi-criteria scheduling with due-window assignment problem
    • 1156.90369 10.1016/j.mcm.2007.08.018 2451122
    • G Mosheiov A Sarig 2008 A multi-criteria scheduling with due-window assignment problem Math Comput Model 48 898 907 1156.90369 10.1016/j.mcm.2007. 08.018 2451122
    • (2008) Math Comput Model , vol.48 , pp. 898-907
    • Mosheiov, G.1    Sarig, A.2
  • 29
    • 54449096182 scopus 로고    scopus 로고
    • Minimizing the bi-criteria of makespan and maximum tardiness with an upper bound on maximum tardiness
    • 1160.90483 10.1016/j.cor.2007.12.013 2579765
    • R Ruiz A Allahverdi 2009 Minimizing the bi-criteria of makespan and maximum tardiness with an upper bound on maximum tardiness Comput Oper Res 36 1268 1283 1160.90483 10.1016/j.cor.2007.12.013 2579765
    • (2009) Comput Oper Res , vol.36 , pp. 1268-1283
    • Ruiz, R.1    Allahverdi, A.2
  • 30
    • 33847249437 scopus 로고    scopus 로고
    • Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem
    • 1121.90064 10.1016/j.ejor.2006.05.036 2301412
    • HM Soroush 2007 Minimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problem Eur J Oper Res 181 266 287 1121.90064 10.1016/j.ejor.2006.05.036 2301412
    • (2007) Eur J Oper Res , vol.181 , pp. 266-287
    • Soroush, H.M.1
  • 32
    • 52049088799 scopus 로고    scopus 로고
    • Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system
    • 1163.90008 10.1016/j.cor.2007.09.013 2579933
    • LH Su 2009 Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system Comput Oper Res 36 461 471 1163.90008 10.1016/j.cor.2007.09.013 2579933
    • (2009) Comput Oper Res , vol.36 , pp. 461-471
    • Su, L.H.1
  • 33
    • 33750480526 scopus 로고    scopus 로고
    • Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
    • DOI 10.1016/j.amc.2006.02.033, PII S0096300306002761
    • R Tavakkoli-Moghaddam AR Rahimi-Vahed 2006 Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system Appl Math Comput 181 1471 1481 1102.90358 10.1016/j.amc.2006.02.033 (Pubitemid 44646619)
    • (2006) Applied Mathematics and Computation , vol.181 , Issue.2 , pp. 1471-1481
    • Tavakkoli-Moghaddam, R.1    Rahimi-Vahed, A.R.2
  • 34
    • 74249120641 scopus 로고    scopus 로고
    • Scheduling the truck holdover recurrent dock cross-dock problem using robust meta-heuristics
    • 10.1007/s00170-009-2152-2 1168.65031
    • B Vahdani R Soltani M Zandieh 2009 Scheduling the truck holdover recurrent dock cross-dock problem using robust meta-heuristics Int J Adv Manuf Technol 10.1007/s00170-009-2152-2 1168.65031
    • (2009) Int J Adv Manuf Technol
    • Vahdani, B.1    Soltani, R.2    Zandieh, M.3
  • 35
    • 72149124796 scopus 로고    scopus 로고
    • Scheduling trucks in cross-docking systems: Robust meta-heuristics
    • 10.1016/j.cie.2009.06.006 1168.65031
    • B Vahdani M Zandieh 2009 Scheduling trucks in cross-docking systems: robust meta-heuristics Comput Ind Eng 10.1016/j.cie.2009.06.006 1168.65031
    • (2009) Comput Ind Eng
    • Vahdani, B.1    Zandieh, M.2
  • 37
    • 49249128652 scopus 로고    scopus 로고
    • Real-time trailer scheduling for cross-dock operations
    • 05670258
    • JF Wang A Regan 2008 Real-time trailer scheduling for cross-dock operations Transp J 47 2 5 20 05670258
    • (2008) Transp J , vol.47 , Issue.2 , pp. 5-20
    • Wang, J.F.1    Regan, A.2
  • 38
    • 74849094249 scopus 로고    scopus 로고
    • Minimizing earliness-tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm
    • 10.1016/j.cie.2008.01.008
    • KC Ying 2008 Minimizing earliness-tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm Comput Ind Eng 55 494 502 10.1016/j.cie.2008.01.008
    • (2008) Comput Ind Eng , vol.55 , pp. 494-502
    • Ying, K.C.1
  • 40
    • 34548432064 scopus 로고    scopus 로고
    • Scheduling of inbound and outbound trucks in cross docking systems with temporary storage
    • DOI 10.1016/j.ejor.2006.10.047, PII S0377221706011052
    • W Yu PJ Egbelu 2008 Scheduling of inbound and outbound trailers in cross-docking systems with temporary storage Eur J Oper Res 184 377 396 05197835 10.1016/j.ejor.2006.10.047 (Pubitemid 47368913)
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 377-396
    • Yu, W.1    Egbelu, P.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.