-
4
-
-
0035400636
-
A multiple-depot, multiple-vehicle, location-routing problem with stochastically processed demands
-
Y. Chan, W.B. Carter, and M.D. Burnes A multiple-depot, multiple-vehicle, location-routing problem with stochastically processed demands Computers and Operations Research 28 8 2001 803 826
-
(2001)
Computers and Operations Research
, vol.28
, Issue.8
, pp. 803-826
-
-
Chan, Y.1
Carter, W.B.2
Burnes, M.D.3
-
5
-
-
33750740082
-
Solving a multiobjective location routing problem with a metaheuristic based on tabu search: Application to a real case in Andalusia
-
R. Caballero, M. Gonzalez, F.M. Guerrero, J. Molina, and C. Paralera Solving a multiobjective location routing problem with a metaheuristic based on tabu search: application to a real case in Andalusia European Journal of Operational Research 177 2007 1751 1763
-
(2007)
European Journal of Operational Research
, vol.177
, pp. 1751-1763
-
-
Caballero, R.1
Gonzalez, M.2
Guerrero, F.M.3
Molina, J.4
Paralera, C.5
-
6
-
-
0037290097
-
A simulated annealing methodology to distribution network design and management
-
V. Jayaraman, and A. Ross A simulated annealing methodology to distribution network design and management European Journal of Operational Research 144 2003 629 645
-
(2003)
European Journal of Operational Research
, vol.144
, pp. 629-645
-
-
Jayaraman, V.1
Ross, A.2
-
7
-
-
44649132578
-
An evaluation of new heuristics for the location of cross-docks distribution centers in supply chain network design
-
A. Ross, and V. Jayaraman An evaluation of new heuristics for the location of cross-docks distribution centers in supply chain network design Computers and Industrial Engineering 55 2008 64 79
-
(2008)
Computers and Industrial Engineering
, vol.55
, pp. 64-79
-
-
Ross, A.1
Jayaraman, V.2
-
9
-
-
78651329677
-
A new integrated mathematical model for a bi-objective multi-depot location-routing problem solved by a multi-objective scatter search algorithm
-
R. Tavakkoli-Moghaddam, A. Makui, and Z. Mazloomi A new integrated mathematical model for a bi-objective multi-depot location-routing problem solved by a multi-objective scatter search algorithm Journal of Manufacturing Systems 29 2-3 2010 111 119
-
(2010)
Journal of Manufacturing Systems
, vol.29
, Issue.23
, pp. 111-119
-
-
Tavakkoli-Moghaddam, R.1
Makui, A.2
Mazloomi, Z.3
-
10
-
-
0032263488
-
An efficient heuristic procedure for practical sized capacitated warehouse design and management
-
V. Jayaraman An efficient heuristic procedure for practical sized capacitated warehouse design and management Decision Sciences Journal 29 3 1998 729 745
-
(1998)
Decision Sciences Journal
, vol.29
, Issue.3
, pp. 729-745
-
-
Jayaraman, V.1
-
11
-
-
82955173210
-
Schedule-driven crossdocking networks
-
Donaldson H, Johnson EL, Ratliff HD, Zhang M, Schedule-driven crossdocking networks. Technical report, Georgia Institute of Technology; 1999. http://www.isye.gatech.edu/apps/research-papers/papers/misc9904.pdf.
-
(1999)
Technical Report, Georgia Institute of Technology
-
-
Donaldson, H.1
Johnson, E.L.2
Ratliff, H.D.3
Zhang, M.4
-
13
-
-
30544434616
-
Transshipment through crossdocks with inventory and time windows
-
A. Lim, Z. Miao, B. Rodrigues, and Z. Xu Transshipment through crossdocks with inventory and time windows Naval Research Logistics 52 8 2005 724 733
-
(2005)
Naval Research Logistics
, vol.52
, Issue.8
, pp. 724-733
-
-
Lim, A.1
Miao, Z.2
Rodrigues, B.3
Xu, Z.4
-
14
-
-
34547896598
-
Supply chain governance: A case of cross dock management in the automotive industry
-
K.A. Reeves Supply chain governance: a case of cross dock management in the automotive industry IEEE Transactions on Engineering Management 54 3 2007 455 467
-
(2007)
IEEE Transactions on Engineering Management
, vol.54
, Issue.3
, pp. 455-467
-
-
Reeves, K.A.1
-
15
-
-
54849186700
-
Designing an integrated multi-echelon agile supply chain network: A hybrid taguchi-particle swarm optimization approach
-
M. Bachlaus, M. Kumar Pandey, C. Mahajan, R. Shankar, and M.K. Tiwari Designing an integrated multi-echelon agile supply chain network: a hybrid taguchi-particle swarm optimization approach Journal of Intelligent Manufacturing 19 2008 747 761
-
(2008)
Journal of Intelligent Manufacturing
, vol.19
, pp. 747-761
-
-
Bachlaus, M.1
Kumar Pandey, M.2
Mahajan, C.3
Shankar, R.4
Tiwari, M.K.5
-
17
-
-
77955273868
-
Ant colony optimization algorithm to solve for the transportation problem of cross-docking network
-
R. Musa, J.-P. Arnaout, and H. Jung Ant colony optimization algorithm to solve for the transportation problem of cross-docking network Computers and Industrial Engineering 59 2010 85 92
-
(2010)
Computers and Industrial Engineering
, vol.59
, pp. 85-92
-
-
Musa, R.1
Arnaout, J.-P.2
Jung, H.3
-
19
-
-
84865861250
-
Two hybrid differential evolution algorithms for optimal inbound and outbound truck sequencing in cross docking operations
-
T.W. Liao, P.J. Egbelu, and P.C. Chang Two hybrid differential evolution algorithms for optimal inbound and outbound truck sequencing in cross docking operations Applied Soft Computing 12 2012 3683 3697
-
(2012)
Applied Soft Computing
, vol.12
, pp. 3683-3697
-
-
Liao, T.W.1
Egbelu, P.J.2
Chang, P.C.3
-
20
-
-
84856015741
-
A tabu search heuristic for redesigning a multi-echelon supply chain network over a planning horizon
-
M.T. Melo, S. Nickel, and F. Saldanha-da-Gama A tabu search heuristic for redesigning a multi-echelon supply chain network over a planning horizon International Journal of Production Economics 136 2012 218 230
-
(2012)
International Journal of Production Economics
, vol.136
, pp. 218-230
-
-
Melo, M.T.1
Nickel, S.2
Saldanha-Da-Gama, F.3
-
21
-
-
77953680104
-
Cross docking distribution networks with setup cost and time window constraint
-
H. Ma, Z. Miao, A. Lim, and B. Rodrigues Cross docking distribution networks with setup cost and time window constraint Omega 39 2011 64 72
-
(2011)
Omega
, vol.39
, pp. 64-72
-
-
Ma, H.1
Miao, Z.2
Lim, A.3
Rodrigues, B.4
-
22
-
-
80052468447
-
Heuristic solutions for transshipment problems in a multiple door cross docking warehouse
-
G. Alpan, A.-L. Ladier, R. Larbi, and B. Penz Heuristic solutions for transshipment problems in a multiple door cross docking warehouse Computers and Industrial Engineering 61 2011 402 408
-
(2011)
Computers and Industrial Engineering
, vol.61
, pp. 402-408
-
-
Alpan, G.1
Ladier, A.-L.2
Larbi, R.3
Penz, B.4
-
23
-
-
80053916961
-
The multi-echelon vehicle routing problem with cross docking in supply chain management
-
R. Dondo, C.A. Méndez, and J. Cerdá The multi-echelon vehicle routing problem with cross docking in supply chain management Computers and Chemical Engineering 35 12 2011 3002 3024
-
(2011)
Computers and Chemical Engineering
, vol.35
, Issue.12
, pp. 3002-3024
-
-
Dondo, R.1
Méndez, C.A.2
Cerdá, J.3
-
26
-
-
70350291572
-
Vehicle routing with cross-docking
-
M. Wen, J. Larsen, J. Clausen, J.-F. Cordeau, and G. Laporte Vehicle routing with cross-docking Journal of the Operational Research Society 60 2009 1708 1718
-
(2009)
Journal of the Operational Research Society
, vol.60
, pp. 1708-1718
-
-
Wen, M.1
Larsen, J.2
Clausen, J.3
Cordeau, J.-F.4
Laporte, G.5
-
27
-
-
5744249209
-
Equations of state calculations by fast computing machines
-
N. Metropolis, A.W. Rosenbluth, M.N. Rosenbluth, A.H. Teller, and E. Teller Equations of state calculations by fast computing machines Journal of Chemical Physics 21 1953 1087 1092
-
(1953)
Journal of Chemical Physics
, vol.21
, pp. 1087-1092
-
-
Metropolis, N.1
Rosenbluth, A.W.2
Rosenbluth, M.N.3
Teller, A.H.4
Teller, E.5
-
29
-
-
77957696176
-
Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing
-
A. Ghodratnama, M. Rabbani, R. Tavakkoli-Moghaddam, and A. Baboli Solving a single-machine scheduling problem with maintenance, job deterioration and learning effect by simulated annealing Journal of Manufacturing Systems 29 2010 1 9
-
(2010)
Journal of Manufacturing Systems
, vol.29
, pp. 1-9
-
-
Ghodratnama, A.1
Rabbani, M.2
Tavakkoli-Moghaddam, R.3
Baboli, A.4
-
30
-
-
79960357930
-
A new mathematical model for a competitive vehicle routing problem with time windows solved by simulated annealing
-
R. Tavakkoli-Moghaddam, M. Gazanfari, M. Alinaghian, A. Salamatbakhsh, and N. Norouzi A new mathematical model for a competitive vehicle routing problem with time windows solved by simulated annealing Journal of Manufacturing Systems 30 2011 83 92
-
(2011)
Journal of Manufacturing Systems
, vol.30
, pp. 83-92
-
-
Tavakkoli-Moghaddam, R.1
Gazanfari, M.2
Alinaghian, M.3
Salamatbakhsh, A.4
Norouzi, N.5
-
31
-
-
79955912268
-
Simulated-annealing heuristics for the single-machine scheduling problem with learning and unequal job release times
-
C.-C. Wu, P.-H. Hsu, and K. Lai Simulated-annealing heuristics for the single-machine scheduling problem with learning and unequal job release times Journal of Manufacturing Systems 30 2011 54 62
-
(2011)
Journal of Manufacturing Systems
, vol.30
, pp. 54-62
-
-
Wu, C.-C.1
Hsu, P.-H.2
Lai, K.3
-
32
-
-
0002703574
-
Tabu search: A tutorial
-
F. Glover Tabu search: a tutorial Interfaces 20 4 1990 74 94
-
(1990)
Interfaces
, vol.20
, Issue.4
, pp. 74-94
-
-
Glover, F.1
-
33
-
-
1842864950
-
Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach
-
R. Swarnkar, and M.K. Tiwari Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach Robotics and Computer-Integrated Manufacturing 20 2004 199 209
-
(2004)
Robotics and Computer-Integrated Manufacturing
, vol.20
, pp. 199-209
-
-
Swarnkar, R.1
Tiwari, M.K.2
-
36
-
-
33748423575
-
Algorithms for single machine total tardiness scheduling with sequence dependent setups
-
S.R. Gupta, and J.S. Smith Algorithms for single machine total tardiness scheduling with sequence dependent setups European Journal of Operational Research 175 2006 722 739
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 722-739
-
-
Gupta, S.R.1
Smith, J.S.2
-
37
-
-
0000419596
-
Scheduling of vehicles from a central depot to a number of delivery points
-
G. Clarke, and J. Wright Scheduling of vehicles from a central depot to a number of delivery points Operations Research 12 1964 568 581
-
(1964)
Operations Research
, vol.12
, pp. 568-581
-
-
Clarke, G.1
Wright, J.2
|