-
1
-
-
10444242132
-
Effective cross docking for improving distribution efficiencies
-
Apte, U. M., & Viswanathan, S. (2000). Effective cross docking for improving distribution efficiencies. International Journal of Logistics Research and Applications, 3(3), 291-302.
-
(2000)
International Journal of Logistics Research and Applications
, vol.3
, Issue.3
, pp. 291-302
-
-
Apte, U.M.1
Viswanathan, S.2
-
2
-
-
77953609726
-
A multi-criteria cross-docking scheduling with just-in-time approach
-
Boloori Arabani, A., Fatemi Ghomi, S., & Zandieh, M. (2010). A multi-criteria cross-docking scheduling with just-in-time approach. The International Journal of Advanced Manufacturing Technology, 49, 741-756.
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.49
, pp. 741-756
-
-
Boloori Arabani, A.1
Fatemi Ghomi, S.2
Zandieh, M.3
-
3
-
-
77952544548
-
Cross dock scheduling: classification, literature review and research agenda
-
Boysen, N., & Fliedner, M. (2010). Cross dock scheduling: classification, literature review and research agenda. Omega, 38(6), 413-422.
-
(2010)
Omega
, vol.38
, Issue.6
, pp. 413-422
-
-
Boysen, N.1
Fliedner, M.2
-
4
-
-
71149103397
-
Scheduling inbound and outbound trucks at cross docking terminals
-
Boysen, N., Fliedner, M., & Scholl, A. (2010). Scheduling inbound and outbound trucks at cross docking terminals. OR Spektrum, 32, 135-161.
-
(2010)
OR Spektrum
, vol.32
, pp. 135-161
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
5
-
-
84870513691
-
Minimizing maximum lateness of jobs in inventory constrained scheduling
-
(to appear)
-
Briskorn, D., & Leung, J. (2012, to appear). Minimizing maximum lateness of jobs in inventory constrained scheduling. Journal of the Operational Research Society.
-
(2012)
Journal of the Operational Research Society
-
-
Briskorn, D.1
Leung, J.2
-
6
-
-
52049122618
-
Minimizing the makespan in a two-machine cross-docking flow shop problem
-
Chen, F., & Lee, C.-Y. (2009). Minimizing the makespan in a two-machine cross-docking flow shop problem. European Journal of Operational Research, 193(1), 59-72.
-
(2009)
European Journal of Operational Research
, vol.193
, Issue.1
, pp. 59-72
-
-
Chen, F.1
Lee, C.-Y.2
-
7
-
-
78650173663
-
An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems
-
Forouharfard, S., & Zandieh, M. (2010). An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems. The International Journal of Advanced Manufacturing Technology, 51, 1179-1193.
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.51
, pp. 1179-1193
-
-
Forouharfard, S.1
Zandieh, M.2
-
8
-
-
78549247074
-
Scheduling cross docking operations under full, partial and no information on inbound arrivals
-
Larbi, R., Alpan, G., Baptiste, P., & Penz, B. (2011). Scheduling cross docking operations under full, partial and no information on inbound arrivals. Computers & Operations Research, 38(6), 889-900.
-
(2011)
Computers & Operations Research
, vol.38
, Issue.6
, pp. 889-900
-
-
Larbi, R.1
Alpan, G.2
Baptiste, P.3
Penz, B.4
-
9
-
-
79960926327
-
Optimal loading and unloading policy in cross docking platform
-
Moscow, RussiaJune 2009
-
Maknoon, M. Y., Baptiste, P., & Kone, O. (2009). Optimal loading and unloading policy in cross docking platform. In Proceedings of 13th IFAC Symposium on Information Control Problems in Manufacturing, Moscow, Russia, June 2009 (pp. 1263-1268).
-
(2009)
Proceedings of 13th IFAC Symposium on Information Control Problems in Manufacturing
, pp. 1263-1268
-
-
Maknoon, M.Y.1
Baptiste, P.2
Kone, O.3
-
11
-
-
34548432064
-
Scheduling of inbound and outbound trucks in cross docking systems with temporary storage
-
Yu, W., & Egbelu, P. J. (2008). Scheduling of inbound and outbound trucks in cross docking systems with temporary storage. European Journal of Operational Research, 184(1), 377-396.
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.1
, pp. 377-396
-
-
Yu, W.1
Egbelu, P.J.2
|