메뉴 건너뛰기




Volumn 38, Issue 6, 2011, Pages 889-900

Scheduling cross docking operations under full, partial and no information on inbound arrivals

Author keywords

Cross docking; Heuristics; Logistics; Scheduling; Value of information

Indexed keywords

COMPLETE INFORMATION; CROSSDOCKING; DELIVERY TIME; HEURISTICS; INVENTORY HOLDING; OPTIMAL GRAPHS; ORDER PICKING; POLYNOMIAL-TIME ALGORITHMS; SCHEDULING POLICIES; SCHEDULING PROBLEM; TRANSPORTATION COST; VALUE OF INFORMATION;

EID: 78549247074     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2010.10.003     Document Type: Article
Times cited : (80)

References (20)
  • 3
    • 0033226199 scopus 로고    scopus 로고
    • The effects of trailer scheduling on the layout of freight terminals
    • K.R. Gue The effects of trailer scheduling on the layout of freight terminals Transportation Science 33 4 1999 419 428
    • (1999) Transportation Science , vol.33 , Issue.4 , pp. 419-428
    • Gue, K.R.1
  • 5
    • 0025628962 scopus 로고
    • A microcomputer based decision support tool for assigning dock doors in freight yards
    • L.Y. Tsui, and C.-H. Chang A microcomputer based decision support tool for assigning dock doors in freight yards Computers and Industrial Engineering 19 1990 309 312
    • (1990) Computers and Industrial Engineering , vol.19 , pp. 309-312
    • Tsui, L.Y.1    Chang, C.-H.2
  • 9
    • 34548432064 scopus 로고    scopus 로고
    • Scheduling of inbound and outbound trucks in cross docking systems with temporary storage
    • W. Yu, and P.J. Egbelu Scheduling of inbound and outbound trucks in cross docking systems with temporary storage European Journal of Operational Research 184 1 2008 377 396
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 377-396
    • Yu, W.1    Egbelu, P.J.2
  • 15
    • 52049122618 scopus 로고    scopus 로고
    • Minimizing the makespan in two-machine cross-docking flow shop problem
    • F. Chen, and C.-Y. Lee Minimizing the makespan in two-machine cross-docking flow shop problem European Journal of Operational Research 193 1 2009 59 72
    • (2009) European Journal of Operational Research , vol.193 , Issue.1 , pp. 59-72
    • Chen, F.1    Lee, C.-Y.2
  • 16
    • 56549110639 scopus 로고    scopus 로고
    • Minimizing makespan in two-stage hybrid cross docking scheduling problem
    • F. Chen, and K. Song Minimizing makespan in two-stage hybrid cross docking scheduling problem Computers and Operations Research 36 2009 2066 2073
    • (2009) Computers and Operations Research , vol.36 , pp. 2066-2073
    • Chen, F.1    Song, K.2
  • 17
    • 0034313705 scopus 로고    scopus 로고
    • Reducing labor costs in an LTL crossdocking terminal
    • J.J. Bartholdi, and K.R. Gue Reducing labor costs in an LTL crossdocking terminal Operations Research 48 6 2002 823 832
    • (2002) Operations Research , vol.48 , Issue.6 , pp. 823-832
    • Bartholdi, J.J.1    Gue, K.R.2
  • 19
    • 77952544548 scopus 로고    scopus 로고
    • Cross dock scheduling: Classification, literature review and research agenda
    • N. Boysen, and M. Fliedner Cross dock scheduling: classification, literature review and research agenda Omega 38 6 2009 413 422
    • (2009) Omega , vol.38 , Issue.6 , pp. 413-422
    • Boysen, N.1    Fliedner, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.