메뉴 건너뛰기




Volumn 31, Issue 3, 2016, Pages 312-321

An analytic hierarchy process model to evaluate road section design

Author keywords

analytic hierarchy process; intersection; multi criteria decision making; road section design; roundabouts; sensitivity analysis

Indexed keywords

ANALYTIC HIERARCHY PROCESS; CARDIOVASCULAR SYSTEM; DECISION MAKING; DESIGN; HIERARCHICAL SYSTEMS; INTERSECTIONS; ROADS AND STREETS; SENSITIVITY ANALYSIS; STREET TRAFFIC CONTROL; TRANSPORTATION;

EID: 84961941193     PISSN: 16484142     EISSN: 16483480     Source Type: Journal    
DOI: 10.3846/16484142.2016.1157830     Document Type: Article
Times cited : (42)

References (57)
  • 1
    • 84874180414 scopus 로고    scopus 로고
    • Using the analytic network process for addressing a transport decision problem
    • F.Abastante, ; M.Bottero, ; I.M.Lami, 2012. Using the analytic network process for addressing a transport decision problem, International Journal of the Analytic Hierarchy Process 4(1):41–60. http://dx.doi.org/10.13033/ijahp.v4i1.119
    • (2012) International Journal of the Analytic Hierarchy Process , vol.4 , Issue.1 , pp. 41-60
    • Abastante, F.1    Bottero, M.2    Lami, I.M.3
  • 2
    • 84865275751 scopus 로고    scopus 로고
    • Prioritizing constructing projects of municipalities based on AHP and COPRAS-G: a case study about footbridges in Iran
    • M.H.Aghdaie, ; S.Hashemkhani Zolfani, ; E.K.Zavadskas, 2012. Prioritizing constructing projects of municipalities based on AHP and COPRAS-G:a case study about footbridges in Iran, The Baltic Journal of Road and Bridge Engineering 7(2):145–153. http://dx.doi.org/10.3846/bjrbe.2012.20
    • (2012) The Baltic Journal of Road and Bridge Engineering , vol.7 , Issue.2 , pp. 145-153
    • Aghdaie, M.H.1    Hashemkhani Zolfani, S.2    Zavadskas, E.K.3
  • 4
    • 0034324933 scopus 로고    scopus 로고
    • Transportation projects selection process using fuzzy sets theory
    • E.Avineri, ; J.Prashker, ; A.Ceder, 2000. Transportation projects selection process using fuzzy sets theory, Fuzzy Sets and Systems 116(1):35–47. http://dx.doi.org/10.1016/S0165-0114(99)00036-6
    • (2000) Fuzzy Sets and Systems , vol.116 , Issue.1 , pp. 35-47
    • Avineri, E.1    Prashker, J.2    Ceder, A.3
  • 5
    • 36349014236 scopus 로고    scopus 로고
    • Implementation of relevant methods in assessing traffic-technological projects
    • D.Barić, ; D.Čerepić, ; Ž.Radačić,. 2007. Implementation of relevant methods in assessing traffic-technological projects, Promet – Traffic&Transportation 19(5):329–336.
    • (2007) Promet – Traffic&Transportation , vol.19 , Issue.5 , pp. 329-336
    • Barić, D.1    Čerepić, D.2    Radačić, Ž.3
  • 6
    • 84988336997 scopus 로고    scopus 로고
    • Implementation of analytic hierarchy process in solving transport problems
    • D.Barić, ; M.Starčević, 2015. Implementation of analytic hierarchy process in solving transport problems, International Journal of the Analytic Hierarchy Process 7(2):295–312. http://dx.doi.org/10.13033/ijahp.v7i2.251
    • (2015) International Journal of the Analytic Hierarchy Process , vol.7 , Issue.2 , pp. 295-312
    • Barić, D.1    Starčević, M.2
  • 8
    • 78651596353 scopus 로고    scopus 로고
    • A methodology to assess pedestrian crossing safety
    • O.Basile, ; L.Persia, ; D.S.Usami, 2010. A methodology to assess pedestrian crossing safety, European Transport Research Review 2(3):129–137. http://dx.doi.org/10.1007/s12544-010-0036-z
    • (2010) European Transport Research Review , vol.2 , Issue.3 , pp. 129-137
    • Basile, O.1    Persia, L.2    Usami, D.S.3
  • 9
    • 84988445466 scopus 로고    scopus 로고
    • Analiza i struktura investicijskih projekata
    • (in Croatian)
    • J.Bendeković, 2008. Analiza i struktura investicijskih projekata, Računovodstvo, revizija i financije 18(4):76–82 (in Croatian).
    • (2008) Računovodstvo, revizija i financije , vol.18 , Issue.4 , pp. 76-82
    • Bendeković, J.1
  • 10
    • 18944407138 scopus 로고    scopus 로고
    • Design of delivery areas of public postal operator by applying AHP model
    • I.Bošnjak, ; Z.Kavran, ; D.Matijević, 2005. Design of delivery areas of public postal operator by applying AHP model, Promet – Traffic&Transportation 17(2):77–85.
    • (2005) Promet – Traffic&Transportation , vol.17 , Issue.2 , pp. 77-85
    • Bošnjak, I.1    Kavran, Z.2    Matijević, D.3
  • 12
    • 70349614876 scopus 로고    scopus 로고
    • Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas
    • V.B.G.Campos, ; R.A.R.Ramos, 2009. Multi-criteria analysis procedure for sustainable mobility evaluation in urban areas, Journal of Advanced Transportation 43(4):371–390. http://dx.doi.org/10.1002/atr.5670430403
    • (2009) Journal of Advanced Transportation , vol.43 , Issue.4 , pp. 371-390
    • Campos, V.B.G.1    Ramos, R.A.R.2
  • 13
    • 84888350612 scopus 로고    scopus 로고
    • Applying the analytic network process for risk assessment in sustainable ground improvement
    • A.Cerić, ; D.Marčić, ; M.S.Kovačević, 2013. Applying the analytic network process for risk assessment in sustainable ground improvement, Građevinar 65(10):919–929.
    • (2013) Građevinar , vol.65 , Issue.10 , pp. 919-929
    • Cerić, A.1    Marčić, D.2    Kovačević, M.S.3
  • 14
    • 79954590761 scopus 로고    scopus 로고
    • Determining priorities for managing risk on construction projects
    • A.Cerić, ; T.Marić, 2011. Determining priorities for managing risk on construction projects, Građevinar 63(3):265–271.
    • (2011) Građevinar , vol.63 , Issue.3 , pp. 265-271
    • Cerić, A.1    Marić, T.2
  • 15
    • 58049169390 scopus 로고    scopus 로고
    • Hierarchical evaluation scheme on technology sourcing for advanced public transport systems
    • M.-C.Chung, ; C.-H.Wei, ; C.-J.Chen, 2009. Hierarchical evaluation scheme on technology sourcing for advanced public transport systems, Journal of Advanced Transportation 43(1):89–111. http://dx.doi.org/10.1002/atr.5670430106
    • (2009) Journal of Advanced Transportation , vol.43 , Issue.1 , pp. 89-111
    • Chung, M.-C.1    Wei, C.-H.2    Chen, C.-J.3
  • 16
    • 80052448970 scopus 로고    scopus 로고
    • AHP methodology application in garage-parking facility location selection
    • A.Deluka-Tibljaš, ; B.Karleuša, ; Č.Benac,. 2011. AHP methodology application in garage-parking facility location selection, Promet – Traffic&Transportation 23(4):303–313. http://dx.doi.org/10.7307/ptt.v23i4.133
    • (2011) Promet – Traffic&Transportation , vol.23 , Issue.4 , pp. 303-313
    • Deluka-Tibljaš, A.1    Karleuša, B.2    Benac, Č.3
  • 17
    • 77954840627 scopus 로고    scopus 로고
    • An approach to the selection of optimal transformation strategy in seaports
    • D.Đelović, ; D.Medenica Mitrović, 2010. An approach to the selection of optimal transformation strategy in seaports, Promet – Traffic&Transportation 22(3):219–228. http://dx.doi.org/10.7307/ptt.v22i3.278
    • (2010) Promet – Traffic&Transportation , vol.22 , Issue.3 , pp. 219-228
    • Đelović, D.1    Medenica Mitrović, D.2
  • 18
    • 84894449907 scopus 로고    scopus 로고
    • Selecting the best warehouse data collecting system by using AHP and FAHP methods
    • T.E.Erkan, ; G.F.Can, 2014. Selecting the best warehouse data collecting system by using AHP and FAHP methods, Tehnički vjesnik – Technical Gazette 21(1):87–93.
    • (2014) Tehnički vjesnik – Technical Gazette , vol.21 , Issue.1 , pp. 87-93
    • Erkan, T.E.1    Can, G.F.2
  • 21
    • 84871357038 scopus 로고    scopus 로고
    • An integrated framework for competitive market strategy selection by using fuzzy AHP
    • M.H.Gholami, ; M.Seyyed-Esfahani, 2012. An integrated framework for competitive market strategy selection by using fuzzy AHP, Tehnički vjesnik – Technical Gazette 19(4):769–780.
    • (2012) Tehnički vjesnik – Technical Gazette , vol.19 , Issue.4 , pp. 769-780
    • Gholami, M.H.1    Seyyed-Esfahani, M.2
  • 22
    • 83355168325 scopus 로고    scopus 로고
    • Application of a multi-criteria approach to road safety evaluation in the Bushehr province, Iran
    • F.Haghighat, 2011. Application of a multi-criteria approach to road safety evaluation in the Bushehr province, Iran, Promet – Traffic & Transportation 23(5):341–352. http://dx.doi.org/10.7307/ptt.v23i5.152
    • (2011) Promet – Traffic & Transportation , vol.23 , Issue.5 , pp. 341-352
    • Haghighat, F.1
  • 24
    • 0028972217 scopus 로고
    • Comparative assessment of AHP and MAV in highway planning: case study
    • J.Holguín-Veras, 1995. Comparative assessment of AHP and MAV in highway planning:case study, Journal of Transportation Engineering 121(2):191–200. http://dx.doi.org/10.1061/(ASCE)0733-947X(1995)121:2(191)
    • (1995) Journal of Transportation Engineering , vol.121 , Issue.2 , pp. 191-200
    • Holguín-Veras, J.1
  • 25
    • 73349117808 scopus 로고    scopus 로고
    • Assessment of Vilnius city development scenarios based on transport system modelling and multicriteria analysis
    • M.Jakimavičius, ; M.Burinskienė, 2009. Assessment of Vilnius city development scenarios based on transport system modelling and multicriteria analysis, Journal of Civil Engineering and Management 15(4):361–368. http://dx.doi.org/10.3846/1392-3730.2009.15.361-368
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.4 , pp. 361-368
    • Jakimavičius, M.1    Burinskienė, M.2
  • 26
    • 84903184266 scopus 로고    scopus 로고
    • Improving decision making in defining priorities for implementation of irrigation plans using AHP methodology
    • B.Karleuša, ; N.Ožanić, ; A.Deluka-Tibljaš, 2014. Improving decision making in defining priorities for implementation of irrigation plans using AHP methodology, Tehnički vjesnik – Technical Gazette 21(3):673–680.
    • (2014) Tehnički vjesnik – Technical Gazette , vol.21 , Issue.3 , pp. 673-680
    • Karleuša, B.1    Ožanić, N.2    Deluka-Tibljaš, A.3
  • 27
    • 0032824698 scopus 로고    scopus 로고
    • An integrated planning tool for evaluating road environmental impacts
    • P.Klungboonkrong, ; M.A.P.Taylor, 1999. An integrated planning tool for evaluating road environmental impacts, Computer-Aided Civil and Infrastructure Engineering 14(5):335–345. http://dx.doi.org/10.1111/0885-9507.00152
    • (1999) Computer-Aided Civil and Infrastructure Engineering , vol.14 , Issue.5 , pp. 335-345
    • Klungboonkrong, P.1    Taylor, M.A.P.2
  • 30
    • 77954885449 scopus 로고    scopus 로고
    • Integration of sustainability issues in strategic transportation planning: a multi-criteria model for the assessment of transport infrastructure plans
    • E.López, ; A.Monzón, 2010. Integration of sustainability issues in strategic transportation planning:a multi-criteria model for the assessment of transport infrastructure plans, Computer-Aided Civil and Infrastructure Engineering 25(6):440–451. http://dx.doi.org/10.1111/j.1467-8667.2010.00652.x
    • (2010) Computer-Aided Civil and Infrastructure Engineering , vol.25 , Issue.6 , pp. 440-451
    • López, E.1    Monzón, A.2
  • 31
    • 84922686590 scopus 로고    scopus 로고
    • Functional and economic evaluations for choosing road intersection layout
    • R.Mauro, ; M.Cattani, 2012. Functional and economic evaluations for choosing road intersection layout, Promet –Traffic & Transportation 24(5):441–448. http://dx.doi.org/10.7307/ptt.v24i5.1180
    • (2012) Promet –Traffic & Transportation , vol.24 , Issue.5 , pp. 441-448
    • Mauro, R.1    Cattani, M.2
  • 32
    • 84929156923 scopus 로고    scopus 로고
    • Analytical investigation of mobile NFC adaption with SWOT-AHP approach: a case of Italian telecom
    • F.Mehmood, ; M.Hassannezhad, ; T.Abbas, 2014. Analytical investigation of mobile NFC adaption with SWOT-AHP approach:a case of Italian telecom, Procedia Technology 12:535–541. http://dx.doi.org/10.1016/j.protcy.2013.12.526
    • (2014) Procedia Technology 12 , pp. 535-541
    • Mehmood, F.1    Hassannezhad, M.2    Abbas, T.3
  • 33
    • 79957981880 scopus 로고    scopus 로고
    • Pavement rehabilitation and maintenance prioritization of urban roads using fuzzy logic
    • D.Moazami, ; H.Behbahani, ; R.Muniandy, 2011. Pavement rehabilitation and maintenance prioritization of urban roads using fuzzy logic, Expert Systems with Applications 38(10):12869–12879. http://dx.doi.org/10.1016/j.eswa.2011.04.079
    • (2011) Expert Systems with Applications , vol.38 , Issue.10 , pp. 12869-12879
    • Moazami, D.1    Behbahani, H.2    Muniandy, R.3
  • 34
    • 84937346631 scopus 로고    scopus 로고
    • Studying the effect of spiral curves and intersection angle, on the accident ratios in two-lane rural highways in Iran
    • M.S.Monajjem, ; M.H.Jalal Kamali, ; M.S.Ayubirad, 2013. Studying the effect of spiral curves and intersection angle, on the accident ratios in two-lane rural highways in Iran, Promet – Traffic&Transportation 25(4):343–348. http://dx.doi.org/10.7307/ptt.v25i4.332
    • (2013) Promet – Traffic&Transportation , vol.25 , Issue.4 , pp. 343-348
    • Monajjem, M.S.1    Jalal Kamali, M.H.2    Ayubirad, M.S.3
  • 35
    • 25444432301 scopus 로고    scopus 로고
    • Investment projects evaluation by simulation and multiple criteria decision aiding procedure
    • M.Nowak, 2005. Investment projects evaluation by simulation and multiple criteria decision aiding procedure, Journal of Civil Engineering and Management 11(3):193–202. http://dx.doi.org/10.1080/13923730.2005.9636350
    • (2005) Journal of Civil Engineering and Management , vol.11 , Issue.3 , pp. 193-202
    • Nowak, M.1
  • 37
    • 84903618080 scopus 로고    scopus 로고
    • Study of vehicle speed in the design of roundabouts
    • H.Pilko, ; D.Brčić, ; N.Šubić, 2014. Study of vehicle speed in the design of roundabouts, Građevinar 66(5):407–416. http://dx.doi.org/10.14256/JCE.887.2013
    • (2014) Građevinar , vol.66 , Issue.5 , pp. 407-416
    • Pilko, H.1    Brčić, D.2    Šubić, N.3
  • 38
    • 76049118472 scopus 로고    scopus 로고
    • Application of AHP technique
    • V.Podvezko, 2009. Application of AHP technique, Journal of Business Economics and Management 10(2):181–189. http://dx.doi.org/10.3846/1611-1699.2009.10.181-189
    • (2009) Journal of Business Economics and Management , vol.10 , Issue.2 , pp. 181-189
    • Podvezko, V.1
  • 40
    • 84874527561 scopus 로고    scopus 로고
    • Comparison of fuzzy-based and AHP methods in sustainability evaluation: a case of traffic pollution-reducing policies
    • R.Rossi, ; M.Gastaldi, ; G.Gecchele, 2013. Comparison of fuzzy-based and AHP methods in sustainability evaluation:a case of traffic pollution-reducing policies, European Transport Research Review 5(1):11–26. http://dx.doi.org/10.1007/s12544-012-0086-5
    • (2013) European Transport Research Review , vol.5 , Issue.1 , pp. 11-26
    • Rossi, R.1    Gastaldi, M.2    Gecchele, G.3
  • 41
    • 84871358020 scopus 로고    scopus 로고
    • Selection of academic staff using the fuzzy analytic hierarchy process (FAHP): a pilot study
    • B.D.Rouyendegh, ; T.E.Erkan, 2012. Selection of academic staff using the fuzzy analytic hierarchy process (FAHP):a pilot study, Tehnički vjesnik – Technical Gazette 19(4):923–929.
    • (2012) Tehnički vjesnik – Technical Gazette , vol.19 , Issue.4 , pp. 923-929
    • Rouyendegh, B.D.1    Erkan, T.E.2
  • 42
    • 53449102906 scopus 로고    scopus 로고
    • Decision making with the analytic hierarchy process
    • T.L.Saaty, 2008. Decision making with the analytic hierarchy process, International Journal of Services Sciences 1(1):83–98. http://dx.doi.org/10.1504/IJSSCI.2008.017590
    • (2008) International Journal of Services Sciences , vol.1 , Issue.1 , pp. 83-98
    • Saaty, T.L.1
  • 43
    • 0002280144 scopus 로고
    • Transport planning with multiple criteria: the analytic hierarchy process applications and progress review
    • T.L.Saaty, 1995. Transport planning with multiple criteria:the analytic hierarchy process applications and progress review, Journal of Advanced Transportation 29(1):81–126. http://dx.doi.org/10.1002/atr.5670290109
    • (1995) Journal of Advanced Transportation , vol.29 , Issue.1 , pp. 81-126
    • Saaty, T.L.1
  • 47
    • 80052661023 scopus 로고    scopus 로고
    • Pavement condition assessment using fuzzy logic theory and analytic hierarchy process
    • L.Sun, ; W.Gu, 2011. Pavement condition assessment using fuzzy logic theory and analytic hierarchy process, Journal of Transportation Engineering 137(9):648–655. http://dx.doi.org/10.1061/(ASCE)TE.1943-5436.0000239
    • (2011) Journal of Transportation Engineering , vol.137 , Issue.9 , pp. 648-655
    • Sun, L.1    Gu, W.2
  • 49
    • 0029270789 scopus 로고
    • Multiple criteria evaluation of transportation system improvement projects: the case of Korea
    • M.T.Tabucanon, ; H.-M.Lee, 1995. Multiple criteria evaluation of transportation system improvement projects:the case of Korea, Journal of Advanced Transportation 29(1):127–143. http://dx.doi.org/10.1002/atr.5670290110
    • (1995) Journal of Advanced Transportation , vol.29 , Issue.1 , pp. 127-143
    • Tabucanon, M.T.1    Lee, H.-M.2
  • 51
    • 79151474319 scopus 로고    scopus 로고
    • Using a Delphi process and the analytic hierarchy process (AHP) to evaluate the complexity of projects
    • L.-A.Vidal, ; F.Marle, ; J.-C.Bocquet, 2011. Using a Delphi process and the analytic hierarchy process (AHP) to evaluate the complexity of projects, Expert Systems with Applications 38(5):5388–5405. http://dx.doi.org/10.1016/j.eswa.2010.10.016
    • (2011) Expert Systems with Applications , vol.38 , Issue.5 , pp. 5388-5405
    • Vidal, L.-A.1    Marle, F.2    Bocquet, J.-C.3
  • 53
    • 84872962373 scopus 로고    scopus 로고
    • Applying the AHP to support the bestvalue contractor selection – lessons learned from two case studies in Taiwan
    • W.-C.Wang, ; W.-D.Yu, ; I.-T.Yang, ; C.-C.Lin, ; M.-T.Lee; Y.-Y.Cheng, 2013. Applying the AHP to support the bestvalue contractor selection – lessons learned from two case studies in Taiwan, Journal of Civil Engineering and Management 19(1):24–36. http://dx.doi.org/10.3846/13923730.2012.734851
    • (2013) Journal of Civil Engineering and Management , vol.19 , Issue.1 , pp. 24-36
    • Wang, W.-C.1    Yu, W.-D.2    Yang, I.-T.3    Lin, C.-C.4    Lee, M.-T.5    Cheng, Y.-Y.6
  • 57
    • 84862908966 scopus 로고    scopus 로고
    • Locating urban transit hubs: multicriteria model and case study in China
    • J.Yu, ; Y.Liu, ; G.-L.Chang, ; W.Ma, ; X.Yang, 2011. Locating urban transit hubs:multicriteria model and case study in China, Journal of Transportation Engineering 137(12):944–952. http://dx.doi.org/10.1061/(ASCE)TE.1943-5436.0000275
    • (2011) Journal of Transportation Engineering , vol.137 , Issue.12 , pp. 944-952
    • Yu, J.1    Liu, Y.2    Chang, G.-L.3    Ma, W.4    Yang, X.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.