메뉴 건너뛰기




Volumn 16, Issue 1, 2012, Pages 85-104

Maintenance strategy selection using AHP and COPRAS under fuzzy environment;Priežiūros strategijos parinkimas taikant AHP ir COPRAS metodus neapibrėžtose situacijose

Author keywords

AHP; COPRAS; Fuzzy set theory; Maintenance strategy; Selection

Indexed keywords


EID: 84865657852     PISSN: 1648715X     EISSN: 16489179     Source Type: Journal    
DOI: 10.3846/1648715X.2012.666657     Document Type: Article
Times cited : (135)

References (85)
  • 1
    • 77957277047 scopus 로고    scopus 로고
    • A Fuzzy-AHP decision support system for evaluation of cities vulnerability against earthquakes
    • Aghataher, R., Delavar, M. R., Nami, M. H. and Samnay, N. (2008) A Fuzzy-AHP decision support system for evaluation of cities vulnerability against earthquakes, World Applied Sciences Journal, 3(1), pp. 66-72.
    • (2008) World Applied Sciences Journal , vol.3 , Issue.1 , pp. 66-72
    • Aghataher, R.1    Delavar, M.R.2    Nami, M.H.3    Samnay, N.4
  • 2
    • 84993055774 scopus 로고    scopus 로고
    • On aircraft scheduled maintenance program development
    • doi:10.1108/13552511011072899
    • Ahmadi, A., Söderholm, P. and Kumar, U. (2010) On aircraft scheduled maintenance program development, Journal of Quality in Maintenance Engineering, 16(3), pp. 229-255. doi:10.1108/13552511011072899
    • (2010) Journal of Quality In Maintenance Engineering , vol.16 , Issue.3 , pp. 229-255
    • Ahmadi, A.1    Söderholm, P.2    Kumar, U.3
  • 3
    • 0004205128 scopus 로고
    • Decision theory in maintenance decision making
    • doi:10.1108/13552519510083138
    • Almeida, A. T. and Bohoris, G. A. (1995) Decision theory in maintenance decision making, Quality in Maintenance Engineering, 1(1), pp. 39-45. doi:10.1108/13552519510083138
    • (1995) Quality In Maintenance Engineering , vol.1 , Issue.1 , pp. 39-45
    • Almeida, A.T.1    Bohoris, G.A.2
  • 4
    • 0037432505 scopus 로고    scopus 로고
    • Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
    • doi:10.1016/S0925-5273(02)00380-8
    • Al-Najjar, B. and Alsyouf, I. (2003) Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making, International Journal of Production Economics, 84(1), pp. 85-100. doi:10.1016/S0925-5273(02)00380-8
    • (2003) International Journal of Production Economics , vol.84 , Issue.1 , pp. 85-100
    • Al-Najjar, B.1    Alsyouf, I.2
  • 7
    • 70449524540 scopus 로고    scopus 로고
    • Risk-based maintenance policy selection using AHP and goal programming
    • doi:10.1016/j.ssci.2009.09.005
    • Arunraj, N. S. and Maiti, J. (2010) Risk-based maintenance policy selection using AHP and goal programming, Safety Science, 48(2), pp. 238-247. doi:10.1016/j.ssci.2009.09.005
    • (2010) Safety Science , vol.48 , Issue.2 , pp. 238-247
    • Arunraj, N.S.1    Maiti, J.2
  • 8
    • 78650695091 scopus 로고    scopus 로고
    • Performance measurement model for Turkish aviation firms using the rough-AHP and TOPSIS methods under fuzzy environment
    • doi:10.1016/j.eswa.2010.09.060
    • Aydogan, E. K. (2011) Performance measurement model for Turkish aviation firms using the rough-AHP and TOPSIS methods under fuzzy environment, Expert Systems with Applications, 38(4), pp. 3992-3998. doi:10.1016/j.eswa.2010.09.060
    • (2011) Expert Systems With Applications , vol.38 , Issue.4 , pp. 3992-3998
    • Aydogan, E.K.1
  • 9
    • 0032596134 scopus 로고    scopus 로고
    • Maintenance policy selection for JIT production systems
    • doi:10.1080/002075499190013
    • Azadivar, F. and Shu, V. (1999) Maintenance policy selection for JIT production systems, International Journal of Production Research, 37(16), pp. 3725-3738. doi:10.1080/002075499190013
    • (1999) International Journal of Production Research , vol.37 , Issue.16 , pp. 3725-3738
    • Azadivar, F.1    Shu, V.2
  • 10
    • 77955664820 scopus 로고    scopus 로고
    • Selecting optimum maintenance strategy by fuzzy interactive linear assignment method
    • doi:10.1016/j.apm.2010.05.014
    • Bashiri, M., Badri, H. and Hejazi, T. H. (2011) Selecting optimum maintenance strategy by fuzzy interactive linear assignment method, Applied Mathematical Modelling, 35(1), pp. 152-164. doi:10.1016/j.apm.2010.05.014
    • (2011) Applied Mathematical Modelling , vol.35 , Issue.1 , pp. 152-164
    • Bashiri, M.1    Badri, H.2    Hejazi, T.H.3
  • 11
    • 77954884663 scopus 로고    scopus 로고
    • Optimal open pit mining equipment selection using fuzzy multiple attribute decision making approach
    • Bazzazi, A. A., Osanloo, M. and Karimi, B. (2009) Optimal open pit mining equipment selection using fuzzy multiple attribute decision making approach, Archive of Mining Science, 54(2), pp. 301-320.
    • (2009) Archive of Mining Science , vol.54 , Issue.2 , pp. 301-320
    • Bazzazi, A.A.1    Osanloo, M.2    Karimi, B.3
  • 12
    • 33645230448 scopus 로고    scopus 로고
    • A combined goal programming-AHP approach to maintenance selection problem
    • doi:10.1016/j.ress.2005.08.006
    • Bertolini, M. and Bevilacqua, M. (2006) A combined goal programming-AHP approach to maintenance selection problem, Reliability Engineering & System Safety, 91(7), pp. 839-848. doi:10.1016/j.ress.2005.08.006
    • (2006) Reliability Engineering & System Safety , vol.91 , Issue.7 , pp. 839-848
    • Bertolini, M.1    Bevilacqua, M.2
  • 13
    • 33745440830 scopus 로고    scopus 로고
    • Application of the AHP methodology in making a proposal for a public work contract
    • doi:10.1016/j.ijproman.2006.01.005
    • Bertolini, M., Braglia, M. and Carmignani, G. (2006) Application of the AHP methodology in making a proposal for a public work contract, International Journal of Project Management, 24(5), pp. 422-430. doi:10.1016/j.ijproman.2006.01.005
    • (2006) International Journal of Project Management , vol.24 , Issue.5 , pp. 422-430
    • Bertolini, M.1    Braglia, M.2    Carmignani, G.3
  • 14
    • 0034288043 scopus 로고    scopus 로고
    • The analytic hierarchy process applied to maintenance strategy selection
    • doi:10.1016/S0951-8320(00)00047-8
    • Bevilacqua, M. and Braglia, M. (2000) The analytic hierarchy process applied to maintenance strategy selection, Reliability Engineering and System Safety, 70(1), pp. 71-83. doi:10.1016/S0951-8320(00)00047-8
    • (2000) Reliability Engineering and System Safety , vol.70 , Issue.1 , pp. 71-83
    • Bevilacqua, M.1    Braglia, M.2
  • 16
    • 46549093655 scopus 로고
    • Fuzzy hierarchical analysis
    • doi:10.1016/0165-0114(85)90090-9
    • Buckley, J. J. (1985) Fuzzy hierarchical analysis, Fuzzy Sets and Systems, 17(3), pp. 233-247. doi:10.1016/0165-0114(85)90090-9
    • (1985) Fuzzy Sets and Systems , vol.17 , Issue.3 , pp. 233-247
    • Buckley, J.J.1
  • 17
    • 79953681302 scopus 로고    scopus 로고
    • Strategic analysis of healthcare service quality using fuzzy AHP methodology
    • doi:10.1016/j.eswa.2011.01.103
    • Büyüközkan, G., Çifçi, G. and Güleryüz, S. (2011) Strategic analysis of healthcare service quality using fuzzy AHP methodology, Expert Systems with Applications, 38(8), pp. 9407-9424. doi:10.1016/j.eswa.2011.01.103
    • (2011) Expert Systems With Applications , vol.38 , Issue.8 , pp. 9407-9424
    • Büyüközkan, G.1    Çifçi, G.2    Güleryüz, S.3
  • 18
    • 60849130095 scopus 로고    scopus 로고
    • Fuzzy AHP-based decision support system for selecting ERP systems in textile industry by using balanced scorecard
    • doi:10.1016/j.eswa.2008.11.046
    • Cebeci, U. (2009) Fuzzy AHP-based decision support system for selecting ERP systems in textile industry by using balanced scorecard, Expert Systems with Applications, 36 (5), pp. 8900-8909. doi:10.1016/j.eswa.2008.11.046
    • (2009) Expert Systems With Applications , vol.36 , Issue.5 , pp. 8900-8909
    • Cebeci, U.1
  • 19
    • 77958513543 scopus 로고    scopus 로고
    • Materials selection using complex proportional assessment and evaluation of mixed data methods
    • doi:10.1016/j.matdes.2010.07.010
    • Chatterjee, P., Athawale, V. M. and Chakraborty, S. (2011) Materials selection using complex proportional assessment and evaluation of mixed data methods, Materials and Design, 32(2), pp. 851-860.doi:10.1016/j.matdes.2010.07.010
    • (2011) Materials and Design , vol.32 , Issue.2 , pp. 851-860
    • Chatterjee, P.1    Athawale, V.M.2    Chakraborty, S.3
  • 20
    • 77957922739 scopus 로고    scopus 로고
    • Fuzzy MCDM approach for selecting the best environment-watershed plan
    • doi:10.1016/j.asoc.2009.11.017
    • Chen, V. Y. C., Lien, H. P., Liu, C. H., Liou, J. J. H., Tzenge, G. H. and Yang, L. S. (2011) Fuzzy MCDM approach for selecting the best environment-watershed plan, Applied Soft Computing, 11(1), pp. 265-275. doi:10.1016/j.asoc.2009.11.017
    • (2011) Applied Soft Computing , vol.11 , Issue.1 , pp. 265-275
    • Chen, V.Y.C.1    Lien, H.P.2    Liu, C.H.3    Liou, J.J.H.4    Tzenge, G.H.5    Yang, L.S.6
  • 21
    • 0034248564 scopus 로고    scopus 로고
    • Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures
    • doi:10.1016/S0925-5273(00)00011-6
    • Christer, A. H. and Lee, C. (2000) Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures, International Journal of Production Economics, 67(1), pp. 77-85. doi:10.1016/S0925-5273(00)00011-6
    • (2000) International Journal of Production Economics , vol.67 , Issue.1 , pp. 77-85
    • Christer, A.H.1    Lee, C.2
  • 23
    • 35348935988 scopus 로고    scopus 로고
    • A comparative study of the numerical scales and the prioritization methods in AHP
    • doi:10.1016/j.ejor.2007.01.044
    • Dong, Y., Xu, Y., Li, H. and Dai, M. (2008) A comparative study of the numerical scales and the prioritization methods in AHP, European Journal of Operational Research, 186(1), pp. 229-242. doi:10.1016/j.ejor.2007.01.044
    • (2008) European Journal of Operational Research , vol.186 , Issue.1 , pp. 229-242
    • Dong, Y.1    Xu, Y.2    Li, H.3    Dai, M.4
  • 24
    • 77955716711 scopus 로고    scopus 로고
    • Consensus models for AHP group decision making under row geometric mean prioritization method
    • doi:10.1016/j.dss.2010.03.003
    • Dong, Y., Zhang, G., Hong, W. C. and Xu, Y. (2010) Consensus models for AHP group decision making under row geometric mean prioritization method, Decision Support Systems, 49(3), pp. 281-289. doi:10.1016/j.dss.2010.03.003
    • (2010) Decision Support Systems , vol.49 , Issue.3 , pp. 281-289
    • Dong, Y.1    Zhang, G.2    Hong, W.C.3    Xu, Y.4
  • 25
    • 83055186865 scopus 로고    scopus 로고
    • An integrated model for prioritizing strategies of the Iranian mining sector
    • doi:10.3846/20294913.2011.603173
    • Fouladgar, M. M., Yazdani-Chamzini, A. and Zavadskas, E. K. (2011) An integrated model for prioritizing strategies of the Iranian mining sector, Technological and Economic Development of Economy, 17(3), pp. 459-484. doi:10.3846/20294913.2011.603173
    • (2011) Technological and Economic Development of Economy , vol.17 , Issue.3 , pp. 459-484
    • Fouladgar, M.M.1    Yazdani-Chamzini, A.2    Zavadskas, E.K.3
  • 27
    • 77954868104 scopus 로고    scopus 로고
    • Application of rock mass index (RMi) to determine of blasting index (BI)-a case study Sungun copper mine-Iran
    • Torino, Italy, 19-22 September
    • Hoseinie, S. S., Pourrahimian, Y. and Aghababae, H. (2006) Application of rock mass index (RMi) to determine of blasting index (BI)-a case study Sungun copper mine-Iran. In: International conference on mine planning and equipment selection, Torino, Italy, 19-22 September, pp. 1013-1018.
    • (2006) International Conference On Mine Planning and Equipment Selection , pp. 1013-1018
    • Hoseinie, S.S.1    Pourrahimian, Y.2    Aghababae, H.3
  • 28
    • 3342984611 scopus 로고    scopus 로고
    • Fuzzy MCDM approach for planning and design tenders selection in public office buildings
    • doi:10.1016/j.ijproman.2004.01.002
    • Hsieh, T.-Y., Lu, S.-T. and Tzeng, G.-H. (2004) Fuzzy MCDM approach for planning and design tenders selection in public office buildings, International Journal of Project Management, 22(7), pp. 573-584. doi:10.1016/j.ijproman.2004.01.002
    • (2004) International Journal of Project Management , vol.22 , Issue.7 , pp. 573-584
    • Hsieh, T.-Y.1    Lu, S.-T.2    Tzeng, G.-H.3
  • 29
    • 78650693347 scopus 로고    scopus 로고
    • Intelligent timetable evaluation using fuzzy AHP
    • doi:10.1016/j.eswa.2010.09.030
    • Isaai, M. T., Kanani, A., Tootoonchi, M. and Afzali, H. R. (2011) Intelligent timetable evaluation using fuzzy AHP, Expert Systems with Applications, 38(4), pp. 3718-3723. doi:10.1016/j.eswa.2010.09.030
    • (2011) Expert Systems With Applications , vol.38 , Issue.4 , pp. 3718-3723
    • Isaai, M.T.1    Kanani, A.2    Tootoonchi, M.3    Afzali, H.R.4
  • 30
    • 77955653900 scopus 로고    scopus 로고
    • Using fuzzy delphi method in maintenance strategy selection problem
    • Jafari, A., Jafarian, M., Zareei, A. and Zaerpour, F. (2008) Using fuzzy delphi method in maintenance strategy selection problem, Journal of Uncertain Systems, 2(4), pp. 289-298.
    • (2008) Journal of Uncertain Systems , vol.2 , Issue.4 , pp. 289-298
    • Jafari, A.1    Jafarian, M.2    Zareei, A.3    Zaerpour, F.4
  • 31
    • 79151485263 scopus 로고    scopus 로고
    • A fuzzy AHP-GP approach for integrated production-planning considering manufacturing partners
    • doi:10.1016/j.eswa.2010.11.039
    • Jung, H. (2011) A fuzzy AHP-GP approach for integrated production-planning considering manufacturing partners,Expert Systems with Applications, 38(5), pp. 5833-5840. doi:10.1016/j.eswa.2010.11.039
    • (2011) Expert Systems With Applications , vol.38 , Issue.5 , pp. 5833-5840
    • Jung, H.1
  • 33
    • 33644749098 scopus 로고    scopus 로고
    • Selection of low-e windows in retrofit of public buildings by applying multiple criteria method COPRAS: A Lithuanian case
    • doi:10.1016/j.enbuild.2005.08.005
    • Kaklauskas, A., Zavadskas, E. K., Raslanas, S., Ginevicius, R., Komka, A. and Malinauskas, P. (2006) Selection of low-e windows in retrofit of public buildings by applying multiple criteria method COPRAS: A Lithuanian case, Energy and Buildings, 38(5), pp. 454-462. doi:10.1016/j.enbuild.2005.08.005
    • (2006) Energy and Buildings , vol.38 , Issue.5 , pp. 454-462
    • Kaklauskas, A.1    Zavadskas, E.K.2    Raslanas, S.3    Ginevicius, R.4    Komka, A.5    Malinauskas, P.6
  • 34
    • 79959878659 scopus 로고    scopus 로고
    • Integrated model and system for passive houses multiple criteria analysis
    • doi:10.3846/1648715X.2011.574903
    • Kaklauskas, A., Rute, J., Gudauskas, R. and Banaitis, A. (2011) Integrated model and system for passive houses multiple criteria analysis, International Journal of Strategic Property Management, 15(1), pp. 74-90. doi:10.3846/1648715X.2011.574903
    • (2011) International Journal of Strategic Property Management , vol.15 , Issue.1 , pp. 74-90
    • Kaklauskas, A.1    Rute, J.2    Gudauskas, R.3    Banaitis, A.4
  • 35
    • 37349066473 scopus 로고    scopus 로고
    • An analysis of housing location attributes in the inner city of Budapest, Hungary, using expert judgements
    • doi:10.1080/1648715X.2007.9637570
    • Kauko, T. (2007) An analysis of housing location attributes in the inner city of Budapest, Hungary, using expert judgements, International Journal of Strategic Property Management, 11(4), pp. 209-225. doi:10.1080/1648715X.2007.9637570
    • (2007) International Journal of Strategic Property Management , vol.11 , Issue.4 , pp. 209-225
    • Kauko, T.1
  • 36
    • 79953673540 scopus 로고    scopus 로고
    • Fuzzy AHP approach for supplier selection in a washing machine company
    • doi:10.1016/j. eswa.2011.01.159
    • Kilincci, O. and Onal, S. A. (2011) Fuzzy AHP approach for supplier selection in a washing machine company, Expert Systems with Applications, 38(8), pp. 9656-9664. doi:10.1016/j. eswa.2011.01.159
    • (2011) Expert Systems With Applications , vol.38 , Issue.8 , pp. 9656-9664
    • Kilincci, O.1    Onal, S.A.2
  • 37
    • 84862217865 scopus 로고    scopus 로고
    • A strategic standpoint on maintenance taxonomy
    • doi:10.1108/14725961111128452
    • Khazraei, Kh. and Deuse, J. (2011) A strategic standpoint on maintenance taxonomy, Journal of Facilities Management, 9(2), pp. 96-113. doi:10.1108/14725961111128452
    • (2011) Journal of Facilities Management , vol.9 , Issue.2 , pp. 96-113
    • Khazraei, K.1    Deuse, J.2
  • 38
    • 67651089785 scopus 로고    scopus 로고
    • Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units
    • doi:10.1016/j.compchemeng.2009.03.003
    • Laggoune, R., Chateauneuf, A. and Aissani, D. (2009) Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units, Computers & Chemical Engineering, 33(9), pp. 1499-1510. doi:10.1016/j.compchemeng.2009.03.003
    • (2009) Computers & Chemical Engineering , vol.33 , Issue.9 , pp. 1499-1510
    • Laggoune, R.1    Chateauneuf, A.2    Aissani, D.3
  • 39
    • 79551473996 scopus 로고    scopus 로고
    • Prioritizing the weights of hydrogen energy technologies in the sector of the hydrogen economy by using a fuzzy AHP approach
    • doi:10.1016/j.ijhydene.2010.01.035
    • Lee, S. K., Mogi, G., Lee, S. K. and Kim, J. W. (2011) Prioritizing the weights of hydrogen energy technologies in the sector of the hydrogen economy by using a fuzzy AHP approach, International Journal of Hydrogen Energy, 36(2), pp. 1897-1902. doi:10.1016/j.ijhydene.2010.01.035
    • (2011) International Journal of Hydrogen Energy , vol.36 , Issue.2 , pp. 1897-1902
    • Lee, S.K.1    Mogi, G.2    Lee, S.K.3    Kim, J.W.4
  • 40
    • 60249091250 scopus 로고    scopus 로고
    • Applying TRIZ and Fuzzy AHP to develop innovative design for automated manufacturing systems
    • doi:10.1016/j.eswa.2008.10.025
    • Li, T. S. and Huang, H. H. (2009) Applying TRIZ and Fuzzy AHP to develop innovative design for automated manufacturing systems, Expert Systems with Applications, 36, pp. 8302-8312. doi:10.1016/j.eswa.2008.10.025
    • (2009) Expert Systems With Applications , vol.36 , pp. 8302-8312
    • Li, T.S.1    Huang, H.H.2
  • 41
    • 77956629502 scopus 로고    scopus 로고
    • Determining key ecological indicators for urban land consolidation
    • doi:10.3846/ijspm.2010.08
    • Lin, K.-L. (2010) Determining key ecological indicators for urban land consolidation, International Journal of Strategic Property Management, 14(2), pp. 89-103. doi:10.3846/ijspm.2010.08
    • (2010) International Journal of Strategic Property Management , vol.14 , Issue.2 , pp. 89-103
    • Lin, K.-L.1
  • 42
    • 36148947128 scopus 로고    scopus 로고
    • Using AHP and TOPSIS approaches in customer-driven product design process
    • doi:10.1016/j.compind.2007.05.013
    • Lin, M. C., Wang, C. C., Chen, M. S. and Chang, C. A. (2008) Using AHP and TOPSIS approaches in customer-driven product design process, Computers in Industry, 59(1), pp. 17-31. doi:10.1016/j.compind.2007.05.013
    • (2008) Computers In Industry , vol.59 , Issue.1 , pp. 17-31
    • Lin, M.C.1    Wang, C.C.2    Chen, M.S.3    Chang, C.A.4
  • 44
    • 78650696505 scopus 로고    scopus 로고
    • FAHP ranking and selection of pretreatment module for membrane separation processes in textile cluster
    • doi:10.1016/j.biortech.2010.07.086
    • Manekar, P., Nandy, T., Sargaonkar, A., Rathi, B. and Karthik, M. (2011) FAHP ranking and selection of pretreatment module for membrane separation processes in textile cluster, Bioresource Technology, 102(2), pp. 558-566. doi:10.1016/j.biortech.2010.07.086
    • (2011) Bioresource Technology , vol.102 , Issue.2 , pp. 558-566
    • Manekar, P.1    Nandy, T.2    Sargaonkar, A.3    Rathi, B.4    Karthik, M.5
  • 45
    • 0001856712 scopus 로고
    • Statistical-based or condition-based preventive maintenance?
    • doi:10.1108/13552519510083156
    • Mann, L., Saxena, A. and Knapp, G. M. (1995) Statistical-based or condition-based preventive maintenance?, Journal of Quality in Maintenance Engineering, 1(1), pp. 46-59. doi:10.1108/13552519510083156
    • (1995) Journal of Quality In Maintenance Engineering , vol.1 , Issue.1 , pp. 46-59
    • Mann, L.1    Saxena, A.2    Knapp, G.M.3
  • 46
    • 77953979477 scopus 로고    scopus 로고
    • Sustainable construction taking into account the building impact on the environment
    • doi:10.3846/jeelm.2010.14
    • Medineckiene, M., Turskis, Z. and Zavadskas, E. K. (2010) Sustainable construction taking into account the building impact on the environment, Journal of Environmental Engineering and Landscape Management, 18(2), pp. 118-127. doi:10.3846/jeelm.2010.14
    • (2010) Journal of Environmental Engineering and Landscape Management , vol.18 , Issue.2 , pp. 118-127
    • Medineckiene, M.1    Turskis, Z.2    Zavadskas, E.K.3
  • 48
    • 79952617656 scopus 로고    scopus 로고
    • Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming
    • doi:10.1016/j.cie.2010.12.021
    • Moghaddam, K. S. and Usher, J. S. (2011) Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming, Computers & Industrial Engineering, 60(4), pp. 654-665. doi:10.1016/j.cie.2010.12.021
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.4 , pp. 654-665
    • Moghaddam, K.S.1    Usher, J.S.2
  • 49
    • 0032641492 scopus 로고    scopus 로고
    • Optimal decision making in a maintenance service operation
    • doi:10.1016/S0377-2217(98)90202-8
    • Murthy, D. N. P. and Asgharizadeh, E. (1999) Optimal decision making in a maintenance service operation, European Journal of Operational Research, 116, pp. 259-273. doi:10.1016/S0377-2217(98)90202-8
    • (1999) European Journal of Operational Research , vol.116 , pp. 259-273
    • Murthy, D.N.P.1    Asgharizadeh, E.2
  • 50
    • 73349113523 scopus 로고
    • Moving the Earth. North Castle Books, Greenwich, CT. Plebankiewicz, E. (2009) Contractor prequalification model using fuzzy sets
    • doi:10.3846/1392-3730.2009.15.377-385
    • Nichols, H. L. (1976) Moving the Earth. North Castle Books, Greenwich, CT. Plebankiewicz, E. (2009) Contractor prequalification model using fuzzy sets, Journal of Civil Engineering and Management, 15(4), pp. 377-385. doi:10.3846/1392-3730.2009.15.377-385
    • (1976) Journal of Civil Engineering and Management , vol.15 , Issue.4 , pp. 377-385
    • Nichols, H.L.1
  • 51
    • 79956092603 scopus 로고    scopus 로고
    • The comparative analysis of MCDA methods SAW and COPRAS
    • Podvezko, V. (2011) The comparative analysis of MCDA methods SAW and COPRAS, Inzinerine Ekonomika-Engineering Economics, 22(2), pp. 134-146.
    • (2011) Inzinerine Ekonomika-Engineering Economics , vol.22 , Issue.2 , pp. 134-146
    • Podvezko, V.1
  • 52
  • 53
    • 79151470874 scopus 로고    scopus 로고
    • Prioritizing effective 7Ms to improve production systems performance using fuzzy AHP and fuzzy TOPSIS (case study)
    • doi:10.1016/j.eswa.2010.10.045
    • Rostamzadeh, R. and Sofian, S. (2011) Prioritizing effective 7Ms to improve production systems performance using fuzzy AHP and fuzzy TOPSIS (case study), Expert Systems with Applications, 38(5), pp. 5166-5177. doi:10.1016/j.eswa.2010.10.045
    • (2011) Expert Systems With Applications , vol.38 , Issue.5 , pp. 5166-5177
    • Rostamzadeh, R.1    Sofian, S.2
  • 54
    • 79959596947 scopus 로고    scopus 로고
    • Analysis and modeling of maintenance operations in the context of an oil filling plant
    • doi:10.1108/17410381111134509
    • Savsar, M. (2011) Analysis and modeling of maintenance operations in the context of an oil filling plant, Journal of Manufacturing Technology Management, 22 (5), pp. 679-697. doi:10.1108/17410381111134509
    • (2011) Journal of Manufacturing Technology Management , vol.22 , Issue.5 , pp. 679-697
    • Savsar, M.1
  • 57
    • 82855161347 scopus 로고    scopus 로고
    • Hard-rock LHD cost estimation using single and multiple regressions based on principal component analysis
    • doi:10.1016/j.tust.2011.08.006
    • Sayadi, A.R., Lashgari, A. and Paraszczak, J. (2012) Hard-rock LHD cost estimation using single and multiple regressions based on principal component analysis, Tunnelling and Underground Space Technology, 27(1), pp. 133-141. doi:10.1016/j.tust.2011.08.006
    • (2012) Tunnelling and Underground Space Technology , vol.27 , Issue.1 , pp. 133-141
    • Sayadi, A.R.1    Lashgari, A.2    Paraszczak, J.3
  • 58
    • 79957654757 scopus 로고    scopus 로고
    • The criteria for identifying the quality of passengers' transportation by railway and their ranking using AHP method
    • doi:10.3846/transport.2010.46
    • Sivilevičius, H. and Maskeliunaite, L. (2010) The criteria for identifying the quality of passengers' transportation by railway and their ranking using AHP method, Transport, 25(4), pp. 368-381. doi:10.3846/transport.2010.46
    • (2010) Transport , vol.25 , Issue.4 , pp. 368-381
    • Sivilevičius, H.1    Maskeliunaite, L.2
  • 59
    • 77957839959 scopus 로고    scopus 로고
    • A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods
    • doi:10.1016/j.eswa.2010.04.066
    • Sun, C. C. (2010) A performance evaluation model by integrating fuzzy AHP and fuzzy TOPSIS methods, Expert Systems with Applications, 37(12), pp. 7745-7754. doi:10.1016/j.eswa.2010.04.066
    • (2010) Expert Systems With Applications , vol.37 , Issue.12 , pp. 7745-7754
    • Sun, C.C.1
  • 60
    • 0035906314 scopus 로고    scopus 로고
    • Linking maintenance strategies to performance
    • doi:10.1016/S0925-5273(00)00067-0
    • Swanson, L. (2001) Linking maintenance strategies to performance, International Journal of Production Economics, 70(3), pp. 237-244. doi:10.1016/S0925-5273(00)00067-0
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 237-244
    • Swanson, L.1
  • 61
    • 33748941266 scopus 로고    scopus 로고
    • Integrated agent based construction equipment management: Conceptual design
    • doi:10.1080/13923730.2006.9636397
    • Tatari, O. and Skibniewski, M. J. (2006) Integrated agent based construction equipment management: conceptual design, Journal of Civil Engineering and Management, 12(3), pp. 231-236. doi:10.1080/13923730.2006.9636397
    • (2006) Journal of Civil Engineering and Management , vol.12 , Issue.3 , pp. 231-236
    • Tatari, O.1    Skibniewski, M.J.2
  • 62
    • 84865640703 scopus 로고    scopus 로고
    • The study of airline service quality in the Qeshm free zone by fuzzy logic
    • Toosi, N. M. and Kohanali, R. A. (2011) The study of airline service quality in the Qeshm free zone by fuzzy logic, Journal of Mathematics and Computer Science, 2(1), pp. 171-185.
    • (2011) Journal of Mathematics and Computer Science , vol.2 , Issue.1 , pp. 171-185
    • Toosi, N.M.1    Kohanali, R.A.2
  • 63
    • 70649102118 scopus 로고    scopus 로고
    • Fuzzy AHP to determine the relative weights of evaluation criteria and Fuzzy TOPSIS to rank the alternatives
    • doi:10.1016/j.asoc.2009.08.021
    • Torfi, F., Farahani, R. Z. and Rezapour, S. (2010) Fuzzy AHP to determine the relative weights of evaluation criteria and Fuzzy TOPSIS to rank the alternatives, Applied Soft Computing, 10(2), pp. 520-528. doi:10.1016/j.asoc.2009.08.021
    • (2010) Applied Soft Computing , vol.10 , Issue.2 , pp. 520-528
    • Torfi, F.1    Farahani, R.Z.2    Rezapour, S.3
  • 64
    • 78650695288 scopus 로고    scopus 로고
    • Analyzing business competition by using fuzzy TOPSIS method: An example of Turkish domestic airline industry
    • doi:10.1016/j.eswa.2010.08.125
    • Torlak, G., Sevkli, M., Sanal, M. and Zaim, S. (2011) Analyzing business competition by using fuzzy TOPSIS method: an example of Turkish domestic airline industry, Expert Systems with Applications, 38(4), pp. 3396-3406. doi:10.1016/j.eswa.2010.08.125
    • (2011) Expert Systems With Applications , vol.38 , Issue.4 , pp. 3396-3406
    • Torlak, G.1    Sevkli, M.2    Sanal, M.3    Zaim, S.4
  • 65
    • 77953767538 scopus 로고    scopus 로고
    • Multiple criteria assessment of alternatives for built and human environment renovation
    • doi:10.3846/jcem.2010.30
    • Tupenaite, L., Zavadskas, E. K., Kaklauskas, A., Turskis, Z. and Seniut, M. (2010) Multiple criteria assessment of alternatives for built and human environment renovation, Journal of Civil Engineering and Management, 16(2), pp. 257-266. doi:10.3846/jcem.2010.30
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.2 , pp. 257-266
    • Tupenaite, L.1    Zavadskas, E.K.2    Kaklauskas, A.3    Turskis, Z.4    Seniut, M.5
  • 66
    • 73349091546 scopus 로고    scopus 로고
    • A multiple criteria decision-making approach to the selection of concrete pumps
    • doi:10.3846/1392-3730.2009.15.369-376
    • Ulubeyli, S. and Kazaz, A. (2009) A multiple criteria decision-making approach to the selection of concrete pumps, Journal of Civil Engineering and Management, 15(4), pp. 369-376. doi:10.3846/1392-3730.2009.15.369-376
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.4 , pp. 369-376
    • Ulubeyli, S.1    Kazaz, A.2
  • 67
    • 77953974432 scopus 로고    scopus 로고
    • Search for optimal solution of public building renovation in terms of life cycle
    • doi:10.3846/jeelm.2010.12
    • Uzsilaityte, L. and Martinaitis, V. (2010) Search for optimal solution of public building renovation in terms of life cycle, Journal of Environment Engineering and Landscape Management, 18(2), pp. 102-110. doi:10.3846/jeelm.2010.12
    • (2010) Journal of Environment Engineering and Landscape Management , vol.18 , Issue.2 , pp. 102-110
    • Uzsilaityte, L.1    Martinaitis, V.2
  • 68
    • 77957840489 scopus 로고    scopus 로고
    • Integration of fuzzy AHP and FPP with TOPSIS methodology for aeroengine health assessment
    • doi:10.1016/j.eswa.2010.05.024
    • Wang, J., Fan, K. and Wang, W. (2010) Integration of fuzzy AHP and FPP with TOPSIS methodology for aeroengine health assessment, Expert Systems with Applications, 37(12), pp. 8516-8526. doi:10.1016/j.eswa.2010.05.024
    • (2010) Expert Systems With Applications , vol.37 , Issue.12 , pp. 8516-8526
    • Wang, J.1    Fan, K.2    Wang, W.3
  • 69
    • 33847071199 scopus 로고    scopus 로고
    • Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process
    • doi:10.1016/j.ijpe.2006.08.005
    • Wang, L., Chu, J. and Wu, J. (2007) Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process, International Journal of Production Economics, 107(1), pp. 151-163. doi:10.1016/j.ijpe.2006.08.005
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 151-163
    • Wang, L.1    Chu, J.2    Wu, J.3
  • 70
    • 35348973437 scopus 로고    scopus 로고
    • On the extent analysis method for fuzzy AHP and its applications
    • doi:10.1016/j.ejor.2007.01.050
    • Wang, Y. M., Luo, Y. and Hua, Z. (2008) On the extent analysis method for fuzzy AHP and its applications, European Journal of Operational Research, 186(2), pp. 735-747. doi:10.1016/j.ejor.2007.01.050
    • (2008) European Journal of Operational Research , vol.186 , Issue.2 , pp. 735-747
    • Wang, Y.M.1    Luo, Y.2    Hua, Z.3
  • 71
    • 79953856443 scopus 로고    scopus 로고
    • Managing condition-based maintenance technology: A multiple case study in the process industry
    • doi:10.1108/13552511111116240
    • Veldman, J., Klingenberg, W. and Wortmann, H. (2011) Managing condition-based maintenance technology: a multiple case study in the process industry, Journal of Quality in Maintenance Engineering, 17(1), pp. 40-62. doi:10.1108/13552511111116240
    • (2011) Journal of Quality In Maintenance Engineering , vol.17 , Issue.1 , pp. 40-62
    • Veldman, J.1    Klingenberg, W.2    Wortmann, H.3
  • 72
    • 34548400272 scopus 로고    scopus 로고
    • Application of the analytic hierarchy process (AHP) in multicriteria analysis of the selection of intelligent building systems
    • doi:10.1016/j.buildenv.2006.11.019
    • Wong, J. K. W. and Li, H. (2008) Application of the analytic hierarchy process (AHP) in multicriteria analysis of the selection of intelligent building systems, Building and Environment, 43(1), pp. 108-125. doi:10.1016/j.buildenv.2006.11.019
    • (2008) Building and Environment , vol.43 , Issue.1 , pp. 108-125
    • Wong, J.K.W.1    Li, H.2
  • 73
    • 64449088458 scopus 로고    scopus 로고
    • A fuzzy MCDM approach for evaluating banking performance based on balanced scorecard
    • doi:10.1016/j.eswa.2009.01.005
    • Wu, H. Y., Tzeng, G. H. and Chen, Y. H. (2009) A fuzzy MCDM approach for evaluating banking performance based on balanced scorecard, Expert Systems with Applications, 36(6), pp. 10135-10147.doi:10.1016/j.eswa.2009.01.005
    • (2009) Expert Systems With Applications , vol.36 , Issue.6 , pp. 10135-10147
    • Wu, H.Y.1    Tzeng, G.H.2    Chen, Y.H.3
  • 74
    • 78651248928 scopus 로고    scopus 로고
    • Prioritization of environmental issues in offshore oil and gas operations: A hybrid approach using fuzzy inference system and fuzzy analytic hierarchy process
    • doi:10.1016/j.psep.2010.08.006
    • Yang, M., Khan, F. I. and Sadiq, R. (2011) Prioritization of environmental issues in offshore oil and gas operations: a hybrid approach using fuzzy inference system and fuzzy analytic hierarchy process, Process Safety and Environmental Protection, 89(1), pp. 22-34.doi:10.1016/j.psep.2010.08.006
    • (2011) Process Safety and Environmental Protection , vol.89 , Issue.1 , pp. 22-34
    • Yang, M.1    Khan, F.I.2    Sadiq, R.3
  • 75
    • 35748965023 scopus 로고    scopus 로고
    • Combining AHP with GIS in synthetic evaluation of eco-environment quality-a case study of Hunan Province, China
    • doi:10.1016/j.ecolmodel.2007.06.007
    • Ying, X., Zeng, G. M., Chen, G. Q., Tang, L., Wang, K.-L. and Huang, D.-Y. (2007) Combining AHP with GIS in synthetic evaluation of eco-environment quality-a case study of Hunan Province, China, Ecological Modelling, 209(2-4), pp. 97-109. doi:10.1016/j.ecolmodel.2007.06.007
    • (2007) Ecological Modelling , vol.209 , Issue.2-4 , pp. 97-109
    • Ying, X.1    Zeng, G.M.2    Chen, G.Q.3    Tang, L.4    Wang, K.-L.5    Huang, D.-Y.6
  • 76
    • 34248666540 scopus 로고
    • Fuzzy sets
    • doi:10.1016/S0019-9958(65)90241-X
    • Zadeh, L. A. (1965) Fuzzy sets, Information and Control, 8(3), pp. 338-353. doi:10.1016/S0019-9958(65)90241-X
    • (1965) Information and Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 77
    • 0016458950 scopus 로고
    • Fuzzy logic and its application to approximate reasoning, Part I
    • doi:10.1016/0020-0255(75)90036-5
    • Zadeh, L. A. (1975a) Fuzzy logic and its application to approximate reasoning, Part I, Information Science, 8(3), pp. 199-249. doi:10.1016/0020-0255(75)90036-5
    • (1975) Information Science , vol.8 , Issue.3 , pp. 199-249
    • Zadeh, L.A.1
  • 78
    • 0016459349 scopus 로고
    • Fuzzy logic and its application to approximate reasoning, Part II
    • doi:10.1016/0020-0255(75)90046-8
    • Zadeh, L. A. (1975b) Fuzzy logic and its application to approximate reasoning, Part II, Information Science, 8(4), pp. 301-357. doi:10.1016/0020-0255(75)90046-8
    • (1975) Information Science , vol.8 , Issue.4 , pp. 301-357
    • Zadeh, L.A.1
  • 79
    • 0016631726 scopus 로고
    • Fuzzy logic and its application to approximate reasoning, Part III
    • doi:10.1016/0020-0255(75)90017-1
    • Zadeh, L. A. (1975c) Fuzzy logic and its application to approximate reasoning, Part III, Information Science, 9(1), pp. 43-80. doi:10.1016/0020-0255(75)90017-1
    • (1975) Information Science , vol.9 , Issue.1 , pp. 43-80
    • Zadeh, L.A.1
  • 81
    • 85056073048 scopus 로고    scopus 로고
    • Determination of an efficient contractor by usingthe new method of multicriteria assessment
    • In: Langford, D. A. and Retik, A. (eds.), Managing the construction project and managing risk., CIB W 65; London: E and FN SPON
    • Zavadskas, E. K. and Kaklauskas, A. (1996) Determination of an efficient contractor by usingthe new method of multicriteria assessment. In: Langford, D. A. and Retik, A. (eds.) International symposium for "The organisation and management of construction". Shaping theory and practice. Vol. 2: Managing the construction project and managing risk. CIB W 65; London: E and FN SPON, pp. 94-104.
    • (1996) International Symposium For "The Organisation and Management of Construction". Shaping Theory and Practice , vol.2 , pp. 94-104
    • Zavadskas, E.K.1    Kaklauskas, A.2
  • 82
    • 67651225590 scopus 로고    scopus 로고
    • Multi-Attribute Decision-Making model by applying grey numbers
    • Zavadskas, E. K., Kaklauskas, A., Turskis, Z. and Tamosaitiene, J. (2009a) Multi-Attribute Decision-Making model by applying grey numbers, Informatica, 20(2), pp. 305-320.
    • (2009) Informatica , vol.20 , Issue.2 , pp. 305-320
    • Zavadskas, E.K.1    Kaklauskas, A.2    Turskis, Z.3    Tamosaitiene, J.4
  • 83
    • 77950333722 scopus 로고    scopus 로고
    • Multicriteria evaluation of apartment blocks maintenance contractors: Lithuanian case study
    • doi:10.3846/1648-715X.2009.13.319-338
    • Zavadskas, E. K., Kaklauskas, A. and Vilutiene, T. (2009b) Multicriteria evaluation of apartment blocks maintenance contractors: Lithuanian case study, International Journal of Strategic Property Management, 13(4), pp. 319-338. doi:10.3846/1648-715X.2009.13.319-338
    • (2009) International Journal of Strategic Property Management , vol.13 , Issue.4 , pp. 319-338
    • Zavadskas, E.K.1    Kaklauskas, A.2    Vilutiene, T.3
  • 85
    • 83055186856 scopus 로고    scopus 로고
    • Multiple criteria decision making (MCDM) methods in economics: An overview
    • doi:10.3846/20294913.2011.593291
    • Zavadskas, E. K. and Turskis, Z. (2011) Multiple criteria decision making (MCDM) methods in economics: an overview, Technological and Economic Development of Economy, 17(2), pp. 397-427. doi:10.3846/20294913.2011.593291
    • (2011) Technological and Economic Development of Economy , vol.17 , Issue.2 , pp. 397-427
    • Zavadskas, E.K.1    Turskis, Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.