메뉴 건너뛰기




Volumn 10, Issue 2, 2009, Pages 181-189

Application of AHP technique

Author keywords

AHP technique; Criterion weight; Multicriteria evaluation methods; The agreement between expert estimates

Indexed keywords


EID: 76049118472     PISSN: 16111699     EISSN: None     Source Type: Journal    
DOI: 10.3846/1611-1699.2009.10.181-189     Document Type: Article
Times cited : (169)

References (43)
  • 2
    • 76049115338 scopus 로고    scopus 로고
    • Beshelev, S. D.; Gurvish, F. G. 1974. Mathematical and statistical methods of expert evaluation. Moscow: Statistics (in Russian).
    • Beshelev, S. D.; Gurvish, F. G. 1974. Mathematical and statistical methods of expert evaluation. Moscow: Statistics (in Russian).
  • 3
    • 11944249373 scopus 로고    scopus 로고
    • Contractor selection using the analytic network process
    • Cheng, E. W. L.; Li, H. 2004. Contractor selection using the analytic network process, Construction Management and Economics 22: 1021-1032.
    • (2004) Construction Management and Economics , vol.22 , pp. 1021-1032
    • Cheng, E.W.L.1    Li, H.2
  • 4
    • 33645922778 scopus 로고    scopus 로고
    • An analytic hierarchy process based model for risk and opportunity assessment of international construction projects
    • Dikmen, I.; Birgonul, M. T. 2006. An analytic hierarchy process based model for risk and opportunity assessment of international construction projects, Canadian Journal of Civil Engineering 33: 58-68.
    • (2006) Canadian Journal of Civil Engineering , vol.33 , pp. 58-68
    • Dikmen, I.1    Birgonul, M.T.2
  • 6
    • 76049129032 scopus 로고    scopus 로고
    • Multicritcria evaluation of the criteria weights by multicriteria methods based on their interrelationships
    • in Lithuanian
    • Gincvičitis, R. 2006. Multicritcria evaluation of the criteria weights by multicriteria methods based on their interrelationships, Verslas: teorija irpraktika [Business: Theory and Practice] 7(1): 3-13 (in Lithuanian).
    • (2006) Verslas: Teorija irpraktika [Business: Theory and Practice] , vol.7 , Issue.1 , pp. 3-13
    • Gincvičitis, R.1
  • 8
    • 29144444949 scopus 로고    scopus 로고
    • Quantitative assessing the accuracy of expert methods
    • Ginevičius, R ; Podvezko, V. 2004. Quantitative assessing the accuracy of expert methods, Engineering Economics 5(40): 7-12.
    • (2004) Engineering Economics , vol.5 , Issue.40 , pp. 7-12
    • Ginevičius, R.1    Podvezko, V.2
  • 11
    • 57849152306 scopus 로고    scopus 로고
    • Complex assessment of sustainable development of state regions with emphasis on ecological and dwelling conditions
    • Ginevičius, R.; Podvezko, V. 2007b. Complex assessment of sustainable development of state regions with emphasis on ecological and dwelling conditions, Ekologija 53: 41-48.
    • (2007) Ekologija , vol.53 , pp. 41-48
    • Ginevičius, R.1    Podvezko, V.2
  • 13
    • 57849103545 scopus 로고    scopus 로고
    • Multicriteria graphical- analytical evaluation of the financial state of construction enterprises
    • Ginevičius, R.; Podvezko, V. 2008b. Multicriteria graphical- analytical evaluation of the financial state of construction enterprises, Technological and Economic Development of Economy 14(4): 452-461.
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.4 , pp. 452-461
    • Ginevičius, R.1    Podvezko, V.2
  • 14
    • 57149118014 scopus 로고    scopus 로고
    • Housing in the context of economic and social development of Lithuanian regions
    • Ginevičius, R.; Podvezko, V. 2008c. Housing in the context of economic and social development of Lithuanian regions, International Journal of Environment and Pollution 35(2/3/4): 309-330.
    • (2008) International Journal of Environment and Pollution , vol.35 , Issue.2 3 4 , pp. 309-330
    • Ginevičius, R.1    Podvezko, V.2
  • 19
  • 20
    • 34247118646 scopus 로고    scopus 로고
    • Online multicriteria risk assessment model for construction of joint ventures in China
    • Hsueh, S.-L.; Perng, Y.-H.; Yan, M.-R.; Lee, J.-R. 2007. Online multicriteria risk assessment model for construction of joint ventures in China, Automation in Construction 16: 607-619.
    • (2007) Automation in Construction , vol.16 , pp. 607-619
    • Hsueh, S.-L.1    Perng, Y.-H.2    Yan, M.-R.3    Lee, J.-R.4
  • 25
    • 0032709416 scopus 로고    scopus 로고
    • A subjective and objective integrated approach to determine attribute weights
    • Ma, J.; Fan, Z.-P; Huang, L.-H. 1999. A subjective and objective integrated approach to determine attribute weights, European Journal of Operational Research 112 (2): 397- 404.
    • (1999) European Journal of Operational Research , vol.112 , Issue.2 , pp. 397-404
    • Ma, J.1    Fan, Z.-P.2    Huang, L.-H.3
  • 27
    • 53349127623 scopus 로고    scopus 로고
    • Assessment of employee's knowledge potential in transport sector
    • Morkvėnas, R.: Bivainis, J.; Jařzemskas, J. 2008. Assessment of employee's knowledge potential in transport sector, Transport 23(3): 258-265.
    • (2008) Transport , vol.23 , Issue.3 , pp. 258-265
    • Morkvėnas, R.1    Bivainis, J.2    Jařzemskas, J.3
  • 31
    • 76049083883 scopus 로고    scopus 로고
    • Saaty, T. L. 1980. The Analytic Hierarchy Process. M. Graw- Hill, New York.
    • Saaty, T. L. 1980. The Analytic Hierarchy Process. M. Graw- Hill, New York.
  • 32
    • 84955140706 scopus 로고    scopus 로고
    • The Analytic Hierarchy and Analytic Network Processes for the Measurement of Intangible Criteria and for Decision-Making
    • Figueira, J, Greco, S, Ehrgott, M, Eds, Springer
    • Saaty, T. L. 2005. The Analytic Hierarchy and Analytic Network Processes for the Measurement of Intangible Criteria and for Decision-Making, in Figueira, J.; Greco, S.; Ehrgott, M. (Eds.). Multiple Criteria Decision Analysis: State of the Art Surveys. Springer, 345-408.
    • (2005) Multiple Criteria Decision Analysis: State of the Art Surveys , pp. 345-408
    • Saaty, T.L.1
  • 33
    • 76049115606 scopus 로고    scopus 로고
    • Shikin, Y. V.; Chartishvili, A. G. 2000. The use of mathematical methods and models in management. Moscow, Delo (in Russian).
    • Shikin, Y. V.; Chartishvili, A. G. 2000. The use of mathematical methods and models in management. Moscow, Delo (in Russian).
  • 36
    • 70349092704 scopus 로고    scopus 로고
    • Multi-criteria optimization system for decision making in construction design and management, Inzinerine ekonomika
    • Turskis, Z.; Zavadskas, E. K.; Peldschus, F. 2009. Multi-criteria optimization system for decision making in construction design and management, Inzinerine ekonomika - Engineering Economics 1(61): 7-17.
    • (2009) Engineering Economics , vol.1 , Issue.61 , pp. 7-17
    • Turskis, Z.1    Zavadskas, E.K.2    Peldschus, F.3
  • 37
    • 34548230481 scopus 로고    scopus 로고
    • Application of a quantitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction
    • Ustinovichius, L.; Zavadskas, E. K.; Podvezko, V. 2007. Application of a quantitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction, Control and Cybernetics 35(2): 251-268.
    • (2007) Control and Cybernetics , vol.35 , Issue.2 , pp. 251-268
    • Ustinovichius, L.1    Zavadskas, E.K.2    Podvezko, V.3
  • 41
    • 30444458522 scopus 로고    scopus 로고
    • A multiple criteria evaluation of multi-family apartment block's maintenance contractors: I-Model for maintenance contractor evaluation and the determination of its selection criteria
    • Zavadskas, E. K.; Vilutienė, T. A. 2006. A multiple criteria evaluation of multi-family apartment block's maintenance contractors: I-Model for maintenance contractor evaluation and the determination of its selection criteria, Building and Environment 41: 621-632.
    • (2006) Building and Environment , vol.41 , pp. 621-632
    • Zavadskas, E.K.1    Vilutienė, T.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.