Volumn 22, Issue 6, 2016, Pages 758-767

Risk identification and allocation in underground rail construction joint ventures: contractors’ perspective

Author keywords

joint venture; risk allocation; risk identification; Singapore; underground rail

Indexed keywords

CONTRACTORS; MERGERS AND ACQUISITIONS; RAILROADS; SURVEYS;

EID: 84949774658     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/13923730.2014.914095     Document Type: Article
Times cited : (76)

References (40)
  • 1
    • 33748632130 scopus 로고    scopus 로고
    • Abednego, M. P.; Ogunlana, S. O. 2006. Good project governance for proper risk allocation in public-private partnerships in Indonesia, International Journal of Project Management 24(7): 622–634. http://dx.doi.org/10.1016/j.ijproman.2006.07.010
  • 2
    • 84975879667 scopus 로고    scopus 로고
    • Adnan, H. 2008. An assessment of risk management in joint venture projects (JV) in Malaysia, Asian Social Science 4(6): 99–106.
  • 3
    • 0031705846 scopus 로고    scopus 로고
    • Akinci, B.; Fischer, M. 1998. Factors affecting contractors’ risk of cost overburden, Journal of Management in Engineering 14(1): 67–76. http://dx.doi.org/10.1061/(ASCE)0742-597X(1998)14:1(67)
  • 4
    • 2242459831 scopus 로고    scopus 로고
    • Akintoye, A. 2000. Analysis of factors influencing project cost estimating practice, Construction Management and Economics 18(1): 77–89. http://dx.doi.org/10.1080/014461900370979
  • 5
    • 84975850923 scopus 로고    scopus 로고
    • Cushman, R. F.; Hedemann, G. C.; King, P. J. 1992. Construction contractor’s handbook of business and law. New York: John Wiley & Sons.
  • 6
    • 84975855470 scopus 로고    scopus 로고
    • Dalle, G.; Potts, K. 1999. Joint ventures in the construction industry, in Proceedings of COBRA 1999, 1–2 September 1999, London, 68–76.
  • 7
    • 78651405686 scopus 로고    scopus 로고
    • Edalat, K.; Vahdatirad, M. J.; Ghodrat, H.; Firouzian, S.; Barari, A. 2010. Choosing TBM for Tabriz subway using multi criteria method, Journal of Civil Engineering and Management 16(4): 531–539. http://dx.doi.org/10.3846/jcem.2010.59
  • 8
    • 79960894175 scopus 로고    scopus 로고
    • Fang, Q.; Zhang, D.; Wong, L. N. Y. 2011. Environmental risk management for a cross interchange subway station construction in China, Tunnelling and Underground Space Technology 26(6): 750–763. http://dx.doi.org/10.1016/j.tust.2011.05.003
  • 9
    • 84975793110 scopus 로고    scopus 로고
    • Favié, R.; Kafa, A.; Maas, G. J. 2009. Risk allocation in joint ventures, in Proceedings of CIB Joint International Symposium 2009-Construction Facing Worldwide Challenges, 27 September – 1 October 2009, Dubrovnik, Croatia, 1023–1030.
  • 10
    • 84975870229 scopus 로고    scopus 로고
    • Goh, N. K.; Kwok, K. H. 2000. Management of construction joint ventures: MSc thesis. Nanyang Technological University, Singapore.
  • 11
    • 61449227351 scopus 로고    scopus 로고
    • Hong, E.-S.; Lee, I.-M.; Shin, H.-S.; Nam, S.-W.; Kong, J.-S. 2009. Quantitative risk evaluation based on event tree analysis technique: application to the design of shield TBM, Tunnelling and Underground Space Technology 24(3): 269–277. http://dx.doi.org/10.1016/j.tust.2008.09.004
  • 12
    • 60449091309 scopus 로고    scopus 로고
    • Hwang, B. G.; Thomas, S. R.; Haas, C. T.; Caldas, C. H. 2009. Measuring the impact of rework on construction cost performance, Journal of Construction Engineering and Management 135(3): 187–198. http://dx.doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)
  • 13
    • 84874303376 scopus 로고    scopus 로고
    • Hwang, B. G.; Zhao, X.; Gay, M. J. S. 2013a. Public private partnership projects in Singapore: factors, critical risks and preferred risk allocation from the perspective of contractors, International Journal of Project Management 31(3): 424–433. http://dx.doi.org/10.1016/j.ijproman.2012.08.003
  • 14
    • 84871919654 scopus 로고    scopus 로고
    • Hwang, B. G.; Zhao, X.; Ng, S. Y. 2013b. Identifying the critical factors affecting schedule performance of public housing projects, Habitat International 38: 214–221. http://dx.doi.org/10.1016/j.habitatint.2012.06.008
  • 15
    • 27744566746 scopus 로고    scopus 로고
    • Isaksson, T.; Stille, H. 2005. Model for estimation of time and cost for tunnel projects based on risk evaluation, Rock Mechanics and Rock Engineering 38(5): 373–398. http://dx.doi.org/10.1007/s00603-005-0048-5
  • 16
    • 84975822382 scopus 로고    scopus 로고
    • Kwok, H. C. A.; Then, D.; Skitmore, M. 2000. Risk management in Singapore construction joint ventures, Journal of Construction Research 1(2): 139–149.
  • 17
    • 34248327941 scopus 로고    scopus 로고
    • Lam, K. C.; Wang, D.; Lee, P. T. K.; Tsang, Y. 2007. Modelling risk allocation decision in construction contracts, International Journal of Project Management 25(5): 485–493. http://dx.doi.org/10.1016/j.ijproman.2006.11.005
  • 18
    • 84975888311 scopus 로고    scopus 로고
    • Li, B. 2000. Risk management of international construction joint ventures: MSc thesis. Nanyang Technological University, Singapore.
  • 19
    • 0032646010 scopus 로고    scopus 로고
    • Li, B.; Tiong, R. L. K. 1999. Risk management model for international construction joint ventures, Journal of Construction Engineering and Management 125(5): 377–384. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:5(377)
  • 20
    • 0032666456 scopus 로고    scopus 로고
    • Li, B.; Tiong, R. L. K.; Fan, W. W.; Chew, D. A. S. 1999. Risk management in international construction joint ventures, Journal of Construction Engineering and Management 125(4): 277–284. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:4(277)
  • 21
    • 84975888313 scopus 로고    scopus 로고
    • Li, H.; Zhu, B.; Zhao, X. 2010. Application of evaluation strategy in the tendering and bidding game of Nanjing metro projects, Journal of Engineering Management 24(2): 148–151 (in Chinese).
  • 22
    • 84975888314 scopus 로고    scopus 로고
    • Liu, Y. 2002. Strategies in structuring international construction joint ventures: MSc thesis. Nanyang Technological University, Singapore.
  • 23
    • 84975791185 scopus 로고    scopus 로고
    • Mead, P. 2007. Current trends in risk allocation in construction projects and their implications for industry participants, Construction Law Journal 23(1): 23–45.
  • 24
    • 84867163835 scopus 로고    scopus 로고
    • Excavation management for slurry TBMs tunnelling under residential houses at C853 (CCL3) project
    • 29–30 November 2007, Singapore:
    • Nakano, A.; Sahabdeen, M.; Kulindran, A.; Seah, T. 2007. Excavation management for slurry TBMs tunnelling under residential houses at C853 (CCL3) project, in Proceedings of Underground Singapore 2007, 29–30 November 2007, Singapore, 38–45.
    • Proceedings of Underground Singapore 2007 , pp. 38-45
  • 25
    • 84993012450 scopus 로고    scopus 로고
    • Ofori, G.; Chan, S. L. 2000. Growth paths of construction enterprises in Singapore, 1980–1998, Engineering, Construction and Architectural Management 7(3): 307–321. http://dx.doi.org/10.1080/01446190150505072
  • 26
    • 0035282123 scopus 로고    scopus 로고
    • Ofori, G.; Chan, S. L. 2001. Factors influencing development of construction enterprises in Singapore, Construction Management and Economics 19(2): 145–154. http://dx.doi.org/10.1080/01446190150505072
  • 27
    • 84875111333 scopus 로고    scopus 로고
    • A review of the performance of the tunnelling for Singapore’s circle line project
    • 19–25 September 2008, Agra, India:
    • N.H.Osborne, ; C.K.Hassell, ; L.Tan, ; R.Wong, 2008. A review of the performance of the tunnelling for Singapore’s circle line project, in Proceedings of World Tunnel Congress 2008, 19–25 September 2008, Agra, India, 1497–1508.
    • (2008) Proceedings of World Tunnel Congress 2008 , pp. 1497-1508
    • Osborne, N.H.1    Hassell, C.K.2    Tan, L.3    Wong, R.4
  • 29
    • 0035135304 scopus 로고    scopus 로고
    • Risk assessment for construction joint ventures in China
    • L.Y.Shen, ; G.W.C.Wu, ; C.S.K.Ng, 2001. Risk assessment for construction joint ventures in China, Journal of Construction Engineering and Management 127(1): 76–81. http://dx.doi.org/10.1061/(ASCE)0733-9364(2001)127:1(76) doi: 10.1061/(ASCE)0733-9364(2001)127:1(76)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 76-81
    • Shen, L.Y.1    Wu, G.W.C.2    Ng, C.S.K.3
  • 31
    • 82855175190 scopus 로고    scopus 로고
    • Sousa, R. L.; Einstein, H. H. 2012. Risk analysis during tunnel construction using bayesian networks: Porto metro case study, Tunnelling and Underground Space Technology 27(1): 86–100. http://dx.doi.org/10.1016/j.tust.2011.07.003
  • 34
    • 2342420461 scopus 로고    scopus 로고
    • Wang, S. Q.; Dulaimi, M. F.; Aguria, M. Y. 2004. Risk management framework for construction projects in developing countries, Construction Management and Economics 22(3): 237–252. http://dx.doi.org/10.1080/0144619032000124689
  • 35
    • 77955332730 scopus 로고    scopus 로고
    • Xu, Y.; Chan, A. P. C.; Yeung, J. F. Y. 2010. Developing a fuzzy risk allocation model for PPP projects in China, Journal of Construction Engineering and Management 136(8): 894–903. http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000189
  • 38
    • 34548665502 scopus 로고    scopus 로고
    • Zhang, G.; Zou, P. X. W. 2007. Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China, Journal of Construction Engineering and Management 133(10): 771–779. http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:10(771)
  • 39
    • 0011127465 scopus 로고    scopus 로고
    • Zhi, H. 1995. Risk management for overseas construction projects, International Journal of Project Management 13(4): 231–237. http://dx.doi.org/10.1016/0263-7863(95)00015-I
  • 40
    • 34447566136 scopus 로고    scopus 로고
    • Zou, P. X. W.; Zhang, G.; Wang, J. 2007. Understanding the key risks in construction projects in China, International Journal of Project Management 25(6): 601–614. http://dx.doi.org/10.1016/j.ijproman.2007.03.001


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.