-
1
-
-
85040877423
-
-
Blackie and Son Ltd., Glasgow, U.K
-
Attewell P.B., Yeates J., Selby A.R. Soil Movements Induced by Tunnelling and their Effects on Pipelines and Structures 1986, Blackie and Son Ltd., Glasgow, U.K.
-
(1986)
Soil Movements Induced by Tunnelling and their Effects on Pipelines and Structures
-
-
Attewell, P.B.1
Yeates, J.2
Selby, A.R.3
-
2
-
-
74249116388
-
Tunnel safety, risk assessment and decision-making
-
Beard A.N. Tunnel safety, risk assessment and decision-making. Tunnelling and Underground Space Technology 2010, 25(1):91-94.
-
(2010)
Tunnelling and Underground Space Technology
, vol.25
, Issue.1
, pp. 91-94
-
-
Beard, A.N.1
-
4
-
-
0141550838
-
-
A methodology for evaluating potential damage to cast iron pipes induced by tunnelling. In: Proceedings of the Geotechnical Aspects of Underground Construction in Soft Ground, London.
-
Bracegirdle, A., Mair, R.J., Nyren, R.J., Taylor, R.N., 1996. A methodology for evaluating potential damage to cast iron pipes induced by tunnelling. In: Proceedings of the Geotechnical Aspects of Underground Construction in Soft Ground, London, pp. 659-664.
-
(1996)
, pp. 659-664
-
-
Bracegirdle, A.1
Mair, R.J.2
Nyren, R.J.3
Taylor, R.N.4
-
6
-
-
79960889487
-
-
DBJ08-61-97, Foundation Pit Design Code of Shanghai. District Standard Compilation Group of Shanghai, Shanghai, China. (in Chinese).
-
DBJ08-61-97, 1997. Foundation Pit Design Code of Shanghai. District Standard Compilation Group of Shanghai, Shanghai, China. (in Chinese).
-
(1997)
-
-
-
9
-
-
79960889379
-
-
The Decision Aids for Tunnelling - An Update.Transportation Research Record.
-
Einstein, H.H., 2004. The Decision Aids for Tunnelling - An Update.Transportation Research Record.
-
(2004)
-
-
Einstein, H.H.1
-
10
-
-
0345766970
-
-
Decision Aids for Tunneling. Transportation Research Record, National Academy Press.
-
Einstein, H.H., Indermitte, C.A., Sinfield, J.V., Descoeudres, F.P., Dudt, J.P., 1999. Decision Aids for Tunneling. Transportation Research Record, No. 1656, National Academy Press.
-
(1999)
, vol.1656
-
-
Einstein, H.H.1
Indermitte, C.A.2
Sinfield, J.V.3
Descoeudres, F.P.4
Dudt, J.P.5
-
11
-
-
1642488326
-
Guidelines for tunnelling risk management: International Tunnelling Association, WorkingGroup No. 2
-
Eskesen S.D., Tengborg P., Kampmann J., Veicherts T.H. Guidelines for tunnelling risk management: International Tunnelling Association, WorkingGroup No. 2. Tunnelling and Underground Space Technology 2004, 19(3):217-237.
-
(2004)
Tunnelling and Underground Space Technology
, vol.19
, Issue.3
, pp. 217-237
-
-
Eskesen, S.D.1
Tengborg, P.2
Kampmann, J.3
Veicherts, T.H.4
-
12
-
-
79960889708
-
-
GB50007-2002, Code for Design of Building Foundation. The Professional Standards Compilation Group of People's Republic of China, Beijing, China. (in Chinese).
-
GB50007-2002, 2002. Code for Design of Building Foundation. The Professional Standards Compilation Group of People's Republic of China, Beijing, China. (in Chinese).
-
(2002)
-
-
-
13
-
-
79960892738
-
-
GJB02-98, Supporting Technology Criterion of Architecture Excavation in Guangzhou District. District Standard Compilation Group of Guangzhou, Guangzhou, China. (in Chinese).
-
GJB02-98, 1998. Supporting Technology Criterion of Architecture Excavation in Guangzhou District. District Standard Compilation Group of Guangzhou, Guangzhou, China. (in Chinese).
-
(1998)
-
-
-
14
-
-
33846506103
-
Influence of metro construction on underground pipeline
-
(in Chinese)
-
Luo J.J., Zhang D.l., Wang M.S., Zhang C.P. Influence of metro construction on underground pipeline. China Railway Science 2006, 27(6):124-128. (in Chinese).
-
(2006)
China Railway Science
, vol.27
, Issue.6
, pp. 124-128
-
-
Luo, J.J.1
Zhang, D.2
Wang, M.S.3
Zhang, C.P.4
-
16
-
-
0034073266
-
The management process for complex underground and tunnelling projects
-
Reilly J.J. The management process for complex underground and tunnelling projects. Tunnelling and Underground Space Technology 2000, 15(1):31-44.
-
(2000)
Tunnelling and Underground Space Technology
, vol.15
, Issue.1
, pp. 31-44
-
-
Reilly, J.J.1
-
17
-
-
37249022845
-
Risk-based safety impact assessment methodology for underground construction projects in Korea
-
ASCE
-
Seo J.W., Choi H.H. Risk-based safety impact assessment methodology for underground construction projects in Korea. Journal of Construction Engineering and Management 2008, 134(1):72-81. ASCE.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.1
, pp. 72-81
-
-
Seo, J.W.1
Choi, H.H.2
-
18
-
-
0030114753
-
Risk and decision analysis for large underground projects, as applied to the Stockholm Ring Road tunnels
-
Sturk R., Olsson L., Johansson J. Risk and decision analysis for large underground projects, as applied to the Stockholm Ring Road tunnels. Tunnelling and Underground Space Technology 1996, 11(2):157-164.
-
(1996)
Tunnelling and Underground Space Technology
, vol.11
, Issue.2
, pp. 157-164
-
-
Sturk, R.1
Olsson, L.2
Johansson, J.3
-
19
-
-
30044451095
-
IT-based tunnelling risk management system (IT-TURISK) - development and implementation
-
Yoo C., Jeon Y.W., Choi B.S. IT-based tunnelling risk management system (IT-TURISK) - development and implementation. Tunnelling and Underground Space Technology 2006, 21(2):190-202.
-
(2006)
Tunnelling and Underground Space Technology
, vol.21
, Issue.2
, pp. 190-202
-
-
Yoo, C.1
Jeon, Y.W.2
Choi, B.S.3
-
20
-
-
79960894638
-
-
Environmental safety risk management in urban subway tunnel construction using shallow metro. In: 11th Congress of the International Society for Rock Mechanics, July 9-13, 2007.
-
Zhang D.L., Fang, Q., Hou Y.J., 2007. Environmental safety risk management in urban subway tunnel construction using shallow metro. In: 11th Congress of the International Society for Rock Mechanics, July 9-13, 2007, pp. 1289-1291.
-
(2007)
, pp. 1289-1291
-
-
Zhang, D.L.1
Fang, Q.2
Hou, Y.J.3
|