메뉴 건너뛰기




Volumn 38, Issue 5, 2005, Pages 373-398

Model for estimation of time and cost for tunnel projects based on risk evaluation

Author keywords

Cost; Estimation; Monte Carlo simulation; Risk; Time; Tunnelling

Indexed keywords

COMPUTER SIMULATION; COST EFFECTIVENESS; DECISION MAKING; MATHEMATICAL MODELS; MONTE CARLO METHODS; PLANNING; PROJECT MANAGEMENT; RISK ASSESSMENT;

EID: 27744566746     PISSN: 07232632     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00603-005-0048-5     Document Type: Article
Times cited : (44)

References (42)
  • 1
    • 27744535471 scopus 로고    scopus 로고
    • Assessing underground tunnelling projects past and future role of reinsurers
    • 7-8 December, Basel, Switzerland, Independent Technical Conferences Ltd, Bredford, UK
    • Andreossi, E. M. (1998): Assessing underground tunnelling projects past and future role of reinsurers. In: Proc., Reducing Risk in Tunnel Design and Construction. 7-8 December, Basel, Switzerland, Independent Technical Conferences Ltd, Bredford, UK.
    • (1998) Proc., Reducing Risk in Tunnel Design and Construction
    • Andreossi, E.M.1
  • 5
    • 27744440502 scopus 로고
    • Byggstyrning-begrepp ekonomi och förvaltning
    • Liber Förlag (in Swedish)
    • Bunner, J., Råsled, B., Söderberg, E. (1981): Byggstyrning-begrepp ekonomi och förvaltning. Handboken Bygg, Liber Förlag (in Swedish).
    • (1981) Handboken Bygg
    • Bunner, J.1    Råsled, B.2    Söderberg, E.3
  • 7
    • 0344267707 scopus 로고    scopus 로고
    • Contractual risk and liability sharing in hydropower construction
    • Charoenngam, C., Yeh, C.-Y. (1999): Contractual risk and liability sharing in hydropower construction. Int. J. Project Management 17(1), 29-37.
    • (1999) Int. J. Project Management , vol.17 , Issue.1 , pp. 29-37
    • Charoenngam, C.1    Yeh, C.-Y.2
  • 10
    • 0023171767 scopus 로고
    • Computer based decision support systems for underground construction
    • Ch. 77
    • Einstein, H. H., Salazar, G. F., Kim, Y. W., Ioannou, P. G. (1987): Computer Based Decision Support Systems for Underground Construction. In: Proc., RETC, Ch. 77, 1287-1307.
    • (1987) Proc., RETC , pp. 1287-1307
    • Einstein, H.H.1    Salazar, G.F.2    Kim, Y.W.3    Ioannou, P.G.4
  • 14
    • 27744575593 scopus 로고
    • Geologie und hydrogeologie des grauholztunnels
    • Referate der Studientagung vom 23. August 1990 in Schönbühl, Fachgruppe für Untertagebau, Grauholztunnel (in German)
    • Harsch, W. (1990): Geologie und Hydrogeologie des Grauholztunnels. Referate der Studientagung vom 23. August 1990 in Schönbühl, Fachgruppe für Untertagebau, SIA Dokumentation D063, Grauholztunnel (in German).
    • (1990) SIA Dokumentation , vol.D063
    • Harsch, W.1
  • 15
    • 27744558998 scopus 로고    scopus 로고
    • Safety of New Austrian tunnelling method tunnels - A review of sprayed concrete lined tunnels with particular reference to London Clay
    • Health and Safety Executive (1996): Safety of New Austrian Tunnelling Method tunnels - a review of sprayed concrete lined tunnels with particular reference to London Clay. HSE Books 1996, 86.
    • (1996) HSE Books 1996 , vol.86
  • 16
    • 9144250857 scopus 로고    scopus 로고
    • Doctoral Thesis, Division of Soil and Rock Mechanics, Dep. of Civil and Environmental Engineering, Royal Institute of Technology, Sweden, ISSN 1650-9501
    • Isaksson, T. (2002): Model for estimation of time and cost based on risk evaluation applied on tunnel projects. Doctoral Thesis, Division of Soil and Rock Mechanics, Dep. of Civil and Environmental Engineering, Royal Institute of Technology, Sweden, ISSN 1650-9501.
    • (2002) Model for Estimation of Time and Cost Based on Risk Evaluation Applied on Tunnel Projects
    • Isaksson, T.1
  • 17
    • 0033502480 scopus 로고    scopus 로고
    • Risk mitigation for tunnelling projects - A structured approach
    • ITA Oslo, Norway
    • Isaksson, T., Reilly, J., Anderson, J. (1999a): Risk mitigation for tunnelling projects - a structured approach. Challenges for the 21st Century, ITA Oslo, Norway.
    • (1999) Challenges for the 21st Century
    • Isaksson, T.1    Reilly, J.2    Anderson, J.3
  • 19
    • 27744558248 scopus 로고
    • Analyse des verbruches im landrückentunnel, baulos mitte
    • in German
    • John, M., Wogrin, J., Heissel, G. (1987): Analyse des Verbruches im Landrückentunnel, Baulos Mitte. Felsbau 5(2) (in German).
    • (1987) Felsbau , vol.5 , Issue.2
    • John, M.1    Wogrin, J.2    Heissel, G.3
  • 25
    • 27744474118 scopus 로고
    • Tunnelbau, Salzburg. Enke, Stuttgart (in German)
    • Müller, L. (1978): Der Felsbau. Bd. 3, Tunnelbau, Salzburg. Enke, Stuttgart (in German).
    • (1978) Der Felsbau , vol.3
    • Müller, L.1
  • 26
    • 0033495962 scopus 로고    scopus 로고
    • Quality control of a sub-sea tunnel project in complex ground conditions
    • Proc., Alten et al. (eds), Balkema, Rotterdam
    • Nilsen, B., Palmström, A., Stille, H. (1999): Quality control of a sub-sea tunnel project in complex ground conditions. In: Proc., Alten et al. (eds), Challenges for the 21st century. Balkema, Rotterdam.
    • (1999) Challenges for the 21st Century
    • Nilsen, B.1    Palmström, A.2    Stille, H.3
  • 27
    • 0007404884 scopus 로고
    • Tunnel boring machine project data bases and construction simulation
    • The University of Texas at Austin, Austin, Texas
    • Nelson, P. P., Al-Jalil, Y. A., Laughton, C. (1994): Tunnel boring machine project data bases and construction simulation. Geotechnical Engineering Report GR94-4, The University of Texas at Austin, Austin, Texas, 78712.
    • (1994) Geotechnical Engineering Report , vol.GR94-4 , pp. 78712
    • Nelson, P.P.1    Al-Jalil, Y.A.2    Laughton, C.3
  • 28
    • 0003367477 scopus 로고    scopus 로고
    • Doctoral thesis, Division of Construction Management and Economics, Royal Institute of Technology, Stockholm, Sweden
    • Nylén, K.-O. (1999): Civil works - unique projects or a repeatable process? Doctoral thesis, Division of Construction Management and Economics, Royal Institute of Technology, Stockholm, Sweden.
    • (1999) Civil Works - Unique Projects or a Repeatable Process?
    • Nylén, K.-O.1
  • 30
    • 27744476691 scopus 로고
    • Problem der bauzeitprognose bei konventionellen vortrieben
    • Sicherheit und Risiken bei Untertagebauwerken. 21/22 März 1991, Zürich (in German)
    • Platz, M. (1991): Problem der Bauzeitprognose bei konventionellen Vortrieben. Sicherheit und Risiken bei Untertagebauwerken. ETH-Symposium, 21/22 März 1991, Zürich (in German).
    • (1991) ETH-symposium
    • Platz, M.1
  • 32
    • 27744451948 scopus 로고
    • Risiko analyse
    • Tapir forlag. (in Norwegian)
    • Rausand, M. (1991): Risiko Analyse. Veiledning til NS 5814, Tapir forlag. (in Norwegian).
    • (1991) Veiledning Til NS 5814
    • Rausand, M.1
  • 33
    • 0032698578 scopus 로고    scopus 로고
    • Tunnel procurement process - Management issues and risk mitigation - Getting it right from the beginning - Policy, management, procurement, risk evaluation and decision methodologies for optimal results
    • Melbourne, March'99
    • Reilly, J., Isaksson, T., Anderson, J. (1999): Tunnel procurement process - management issues and risk mitigation - getting it right from the beginning - policy, management, procurement, risk evaluation and decision methodologies for optimal results. 10th Australian Tunnelling Conference: The Race for Space, Melbourne, March'99.
    • (1999) 10th Australian Tunnelling Conference: The Race for Space
    • Reilly, J.1    Isaksson, T.2    Anderson, J.3
  • 35
    • 27744464889 scopus 로고
    • Überlegungen des unternehmers in der offertphase
    • Referate der Studientagung vom 26. Mai 1994 in Schönbühl Fachgruppe für Untertagebau, Orauholztunnel II
    • Rohrer, U. (1994): Überlegungen des Unternehmers in der Offertphase. Referate der Studientagung vom 26. Mai 1994 in Schönbühl Fachgruppe für Untertagebau, SIA Dokumentation D0116, Orauholztunnel II.
    • (1994) SIA Dokumentation , vol.D0116
    • Rohrer, U.1
  • 38
    • 0002901564 scopus 로고    scopus 로고
    • Quality systems and risk analysis - New philosophies in underground construction industry
    • Stockholm, Sweden, 7-9 June 1998, AA Balkema, Rotterdam
    • Stille, H., Sturk, R., Olsson, L. (1998): Quality systems and risk analysis - new philosophies in underground construction industry. In: Proc., Inter. Conf. on Underground Construction in Modem Infrastructure, Stockholm, Sweden, 7-9 June 1998, AA Balkema, Rotterdam.
    • (1998) Proc., Inter. Conf. on Underground Construction in Modem Infrastructure
    • Stille, H.1    Sturk, R.2    Olsson, L.3
  • 41
    • 0017560411 scopus 로고
    • Probabilistic modeling of soil profiles
    • GT 11, Nov 1977
    • Vanmarcke, E. H. (1977): Probabilistic modeling of soil profiles. J Geotechn Engng. ASCE 103, GT 11, Nov 1977.
    • (1977) J Geotechn Engng. ASCE , vol.103
    • Vanmarcke, E.H.1
  • 42
    • 27744592113 scopus 로고
    • Storebaelt review
    • April 1993
    • Wallis, S. (1993): Storebaelt Review. World Tunnelling, April 1993.
    • (1993) World Tunnelling
    • Wallis, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.