A contingency approach to software project coordination
-
Andres, H.P. (2001) A contingency approach to software project coordination. Journal of Management Information Systems, 18, 41–70.
-
(2001)
Journal of Management Information Systems
, vol.18
, pp. 41-70
-
-
Andres, H.P.1
-
2
-
-
2942517999
-
Management of risks in information technology projects
-
Baccarini, D., Salm, G. & Love, P. (2004) Management of risks in information technology projects. Industrial Management and Data Systems, 104, 286–295.
-
(2004)
Industrial Management and Data Systems
, vol.104
, pp. 286-295
-
-
Baccarini, D.1
Salm, G.2
Love, P.3
-
3
-
-
42149109120
-
Software estimation: a fuzzy approach
-
Bajaj, N., Tyagi, A. & Agarwal, R. (2006) Software estimation: a fuzzy approach. ACM SIGSOFT Software Engineering Notes, 31, 1–5.
-
(2006)
ACM SIGSOFT Software Engineering Notes
, vol.31
, pp. 1-5
-
-
Bajaj, N.1
Tyagi, A.2
Agarwal, R.3
-
4
-
-
71549173177
-
Toward an assessment of software development risk
-
Barki, H., Rivard, S. & Talbot, J. (1993) Toward an assessment of software development risk. Journal of Management Information Systems, 10, 203–225.
-
(1993)
Journal of Management Information Systems
, vol.10
, pp. 203-225
-
-
Barki, H.1
Rivard, S.2
Talbot, J.3
-
5
-
-
33749671525
-
An open letter to CEOs: how otherwise good managers spend too much on information technology
-
Battles, B.E., Mark, D. & Ryan, C. (1996) An open letter to CEOs: how otherwise good managers spend too much on information technology. The McKinsey Quarterly, 1996, 116–127.
-
(1996)
The McKinsey Quarterly
, vol.1996
, pp. 116-127
-
-
Battles, B.E.1
Mark, D.2
Ryan, C.3
-
6
-
-
84905823878
-
Things I learned from taming software development
-
Bernstein, L. (2012) Things I learned from taming software development. ACM SIGSOFT Software Engineering Notes, 37, 5–6.
-
(2012)
ACM SIGSOFT Software Engineering Notes
, vol.37
, pp. 5-6
-
-
Bernstein, L.1
-
7
-
-
78650385240
-
Overscoping reasons and consequences—a case study on decision making in software product management
-
Sydney, NSW, Australia, September 27
-
Bjarnason, E., Wnuk, K. & Regnell, B. (2010) Overscoping: reasons and consequences—a case study on decision making in software product management.4th International Workshop on Software Product Management (IWSPM), Sydney, NSW, Australia, September 27.
-
(2010)
4th International Workshop on Software Product Management (IWSPM)
-
-
Bjarnason, E.1
Wnuk, K.2
Regnell, B.3
-
8
-
-
84863435148
-
Are you biting off more than you can chew? A case study on causes and effects of overscoping in large-scale software engineering
-
Bjarnason, E., Wnuk, K. & Regnell, B. (2012) Are you biting off more than you can chew? A case study on causes and effects of overscoping in large-scale software engineering. Information and Software Technology, 54, 1107–1124.
-
(2012)
Information and Software Technology
, vol.54
, pp. 1107-1124
-
-
Bjarnason, E.1
Wnuk, K.2
Regnell, B.3
-
10
-
-
0025791156
-
Software risk management: principles and practices
-
Boehm, B. (1991) Software risk management: principles and practices. IEEE Software, 8, 32–41.
-
(1991)
IEEE Software
, vol.8
, pp. 32-41
-
-
Boehm, B.1
-
11
-
-
0033098650
-
Making RAD work for your project
-
Boehm, B. (1999) Making RAD work for your project. Computer, 32, 113–117.
-
(1999)
Computer
, vol.32
, pp. 113-117
-
-
Boehm, B.1
-
12
-
-
85008044997
-
The art of expectations management
-
Boehm, B. (2000) The art of expectations management. Computer, 33, 122–124.
-
(2000)
Computer
, vol.33
, pp. 122-124
-
-
Boehm, B.1
-
13
-
-
0034320884
-
Avoiding the software model-clash spiderweb
-
Boehm, B., Port, D. & Al-Said, M. (2000) Avoiding the software model-clash spiderweb. Computer, 33, 120–122.
-
(2000)
Computer
, vol.33
, pp. 120-122
-
-
Boehm, B.1
Port, D.2
Al-Said, M.3
-
14
-
-
50549103020
-
Achievements and challenges in COCOMO-based software resource estimation
-
Boehm, B. & Valerdi, R. (2008) Achievements and challenges in COCOMO-based software resource estimation. IEEE Software, 25, 74–83.
-
(2008)
IEEE Software
, vol.25
, pp. 74-83
-
-
Boehm, B.1
Valerdi, R.2
-
15
-
-
84993940823
-
Evidence-based software processes
-
ICSP, Paderborn, Germany, July 8–9
-
Boehm, B. & Lane, J.A. (2010) Evidence-based software processes. International Conference on Software Process (ICSP), Paderborn, Germany, July 8–9.
-
(2010)
International Conference on Software Process
-
-
Boehm, B.1
Lane, J.A.2
-
16
-
-
21844497186
-
Exploring the “Planning Fallacy”: why people underestimate their task completion times
-
Buehler, R., Griffin, D. & Ross, M. (1994) Exploring the “Planning Fallacy”: why people underestimate their task completion times. J. Pers. Soc. Psychol., 67, 366–381.
-
(1994)
J. Pers. Soc. Psychol.
, vol.67
, pp. 366-381
-
-
Buehler, R.1
Griffin, D.2
Ross, M.3
-
17
-
-
84953475353
-
It's about time: optimistic predictions in work and love
-
Buehler, R., Griffin, D. & Ross, M. (1995) It's about time: optimistic predictions in work and love. European Review of Social Psychology, 6, 1–32.
-
(1995)
European Review of Social Psychology
, vol.6
, pp. 1-32
-
-
Buehler, R.1
Griffin, D.2
Ross, M.3
-
18
-
-
77954115003
-
The Planning Fallacy: cognitive, motivational, and social origins
-
Buehler, R., Griffin, D. & Peetz, J. (2010a) The Planning Fallacy: cognitive, motivational, and social origins. Advances in Experimental Social Psychology, 43, 1–62.
-
(2010)
Advances in Experimental Social Psychology
, vol.43
, pp. 1-62
-
-
Buehler, R.1
Griffin, D.2
Peetz, J.3
-
19
-
-
74649085458
-
Finishing on time: when do predictions influence completion times?
-
Buehler, R., Peetz, J. & Griffin, D. (2010b) Finishing on time: when do predictions influence completion times? Organ. Behav. Hum. Decis. Process., 111, 23–32.
-
(2010)
Organ. Behav. Hum. Decis. Process.
, vol.111
, pp. 23-32
-
-
Buehler, R.1
Peetz, J.2
Griffin, D.3
-
20
-
-
84855643330
-
Perspectives on prediction: does third-person imagery improve task completion estimates?
-
Buehler, R., Griffin, D., Lam, K. & Deslauriers, J. (2012) Perspectives on prediction: does third-person imagery improve task completion estimates? Organ. Behav. Hum. Decis. Process., 117, 138–149.
-
(2012)
Organ. Behav. Hum. Decis. Process.
, vol.117
, pp. 138-149
-
-
Buehler, R.1
Griffin, D.2
Lam, K.3
Deslauriers, J.4
-
21
-
-
70350578410
-
Learning from failure, part 1: scoping and requirements woes
-
Buschmann, F. (2009) Learning from failure, part 1: scoping and requirements woes. IEEE Software, 26, 68–69.
-
(2009)
IEEE Software
, vol.26
, pp. 68-69
-
-
Buschmann, F.1
-
22
-
-
75149167041
-
Learning from failure, part 2: featuritis, performitis, and other diseases
-
Buschmann, F. (2010) Learning from failure, part 2: featuritis, performitis, and other diseases. IEEE Software, 27, 10–11.
-
(2010)
IEEE Software
, vol.27
, pp. 10-11
-
-
Buschmann, F.1
-
23
-
-
25444497494
-
Why software fails
-
Charette, R.N. (2005) Why software fails. IEEE Spectrum, 42, 42–49.
-
(2005)
IEEE Spectrum
, vol.42
, pp. 42-49
-
-
Charette, R.N.1
-
24
-
-
70349138829
-
Overdosed management: how excess of excellence begets failure
-
Coman, A. & Ronen, B. (2009) Overdosed management: how excess of excellence begets failure. Human Systems Management, 28, 93–99.
-
(2009)
Human Systems Management
, vol.28
, pp. 93-99
-
-
Coman, A.1
Ronen, B.2
-
25
-
-
76749147400
-
Icarus' predicament: managing the pathologies of overspecification and overdesign
-
Coman, A. & Ronen, B. (2010) Icarus' predicament: managing the pathologies of overspecification and overdesign. International Journal of Project Management, 28, 237–244.
-
(2010)
International Journal of Project Management
, vol.28
, pp. 237-244
-
-
Coman, A.1
Ronen, B.2
-
26
-
-
0031175964
-
Decomposed versus holistic estimates of effort required for software writing tasks
-
Connolly, T. & Dean, D. (1997) Decomposed versus holistic estimates of effort required for software writing tasks. Management Science, 43, 1029–1045.
-
(1997)
Management Science
, vol.43
, pp. 1029-1045
-
-
Connolly, T.1
Dean, D.2
-
27
-
-
85023885470
-
Strategies for heading off IS project failure
-
Cule, P., Schmidt, R., Lyytinen, K. & Keil, M. (2000) Strategies for heading off IS project failure. Information Systems Management, 17, 65–73.
-
(2000)
Information Systems Management
, vol.17
, pp. 65-73
-
-
Cule, P.1
Schmidt, R.2
Lyytinen, K.3
Keil, M.4
-
28
-
-
84973385571
-
Creeping featurism and the ratchet effect
-
May 15 (, accessed December 15, 2014)
-
Dominus, M. (2006) Creeping featurism and the ratchet effect. The Universe of Discourse, May 15 (available at http://blog.plover.com/prog/featurism.html; accessed December 15, 2014).
-
(2006)
The Universe of Discourse
-
-
Dominus, M.1
-
30
-
-
42949140480
-
From Nobel prize to project management: getting risks right
-
Flyvbjerg, B. (2006) From Nobel prize to project management: getting risks right. Project Management Journal, 37, 5–15.
-
(2006)
Project Management Journal
, vol.37
, pp. 5-15
-
-
Flyvbjerg, B.1
-
31
-
-
80052257804
-
Why your IT project may be riskier than you think
-
Flyvbjerg, B. & Budzier, A. (2011) Why your IT project may be riskier than you think. Harv. Bus. Rev., 89, 23–25.
-
(2011)
Harv. Bus. Rev.
, vol.89
, pp. 23-25
-
-
Flyvbjerg, B.1
Budzier, A.2
-
32
-
-
84878117597
-
Quality control and due diligence in project management: getting decisions right by taking the outside view
-
Flyvbjerg, B. (2013) Quality control and due diligence in project management: getting decisions right by taking the outside view. International Journal of Project Management, 31, 760–774.
-
(2013)
International Journal of Project Management
, vol.31
, pp. 760-774
-
-
Flyvbjerg, B.1
-
33
-
-
84905724200
-
-
December 16 (, accessed December 8, 2014)
-
Gary, M. (2009) Poor industry consultancy threatens data center constructions, December 16 (available at http://www.businesscomputingworld.co.uk/poor-industry-consultancy-threatens-data-centre-constructions/; accessed December 8, 2014).
-
(2009)
Poor industry consultancy threatens data center constructions
-
-
Gary, M.1
-
34
-
-
84887494394
-
Editor's comments: information systems research and behavioral economics
-
Goes, P.B. (2013) Editor's comments: information systems research and behavioral economics. MIS Quarterly, 37, iii–viii.
-
(2013)
MIS Quarterly
, vol.37
, pp. iii-viii
-
-
Goes, P.B.1
-
35
-
-
0033329854
-
Factors systematically associated with errors in subjective estimates of software development effort the stability of expert judgment.
-
Boca Raton, FL, November 4–6
-
Gray, A.R., MacDonell, S.G. & Shepperd, M.J. (1999) Factors systematically associated with errors in subjective estimates of software development effort: the stability of expert judgment. Proceedings of the Sixth International Software Metrics Symposium, Boca Raton, FL, November 4–6.
-
(1999)
Proceedings of the Sixth International Software Metrics Symposium
-
-
Gray, A.R.1
MacDonell, S.G.2
Shepperd, M.J.3
-
36
-
-
26844468014
-
Biases and fallacies, memories and predictions: comment on Roy, Christenfeld, and McKenzie (2005)
-
Griffin, D. & Buehler, R. (2005) Biases and fallacies, memories and predictions: comment on Roy, Christenfeld, and McKenzie (2005). Psychol. Bull., 131, 757–760.
-
(2005)
Psychol. Bull.
, vol.131
, pp. 757-760
-
-
Griffin, D.1
Buehler, R.2
-
37
-
-
84860568975
-
From origami to software development: a review of studies on judgment-based predictions of performance time
-
Halkjelsvik, T. & Jørgensen, M. (2012) From origami to software development: a review of studies on judgment-based predictions of performance time. Psychol. Bull., 138, 238–271.
-
(2012)
Psychol. Bull.
, vol.138
, pp. 238-271
-
-
Halkjelsvik, T.1
Jørgensen, M.2
-
38
-
-
0018594651
-
A cognitive model of planning
-
Hayes-Roth, B. & Hayes-Roth, F. (1979) A cognitive model of planning. Cognit. Sci., 3, 275–310.
-
(1979)
Cognit. Sci.
, vol.3
, pp. 275-310
-
-
Hayes-Roth, B.1
Hayes-Roth, F.2
-
39
-
-
0038931985
-
Function point analysis: evaluation of a software cost estimation model
-
Heemstra, F.J. & Kusters, R.J. (1991) Function point analysis: evaluation of a software cost estimation model. European Journal of Information Systems, 1, 229–237.
-
(1991)
European Journal of Information Systems
, vol.1
, pp. 229-237
-
-
Heemstra, F.J.1
Kusters, R.J.2
-
40
-
-
0033888513
-
Experts' estimates of task durations in software development projects
-
Hill, J., Thomas, L.C. & Allen, D.E. (2000) Experts' estimates of task durations in software development projects. International Journal of Project Management, 18, 13–21.
-
(2000)
International Journal of Project Management
, vol.18
, pp. 13-21
-
-
Hill, J.1
Thomas, L.C.2
Allen, D.E.3
-
41
-
-
0034754411
-
Stochastic simulation of risk factor potential effects for software development risk management
-
Houston, D.X., Mackulak, G.T. & Collofello, J.S. (2001) Stochastic simulation of risk factor potential effects for software development risk management. Journal of Systems & Software, 59, 247–257.
-
(2001)
Journal of Systems & Software
, vol.59
, pp. 247-257
-
-
Houston, D.X.1
Mackulak, G.T.2
Collofello, J.S.3
-
44
-
-
0346896449
-
Top-down and bottom-up expert estimation of software development effort
-
Jørgensen, M. (2004) Top-down and bottom-up expert estimation of software development effort. Information and Software Technology, 46, 3–16.
-
(2004)
Information and Software Technology
, vol.46
, pp. 3-16
-
-
Jørgensen, M.1
-
45
-
-
23844532694
-
Reasons for software effort estimation error: impact of respondent role, information collection approach, and data analysis method
-
Jørgensen, M. & Moløkken-Østvold, K. (2004) Reasons for software effort estimation error: impact of respondent role, information collection approach, and data analysis method. IEEE Transactions on Software Engineering, 30, 993–1007.
-
(2004)
IEEE Transactions on Software Engineering
, vol.30
, pp. 993-1007
-
-
Jørgensen, M.1
Moløkken-Østvold, K.2
-
46
-
-
1642487659
-
The impact of customer expectation on software development effort estimates
-
Jørgensen, M. & Sjøberg, D.I.K. (2004) The impact of customer expectation on software development effort estimates. International Journal of Project Management, 22, 317–325.
-
(2004)
International Journal of Project Management
, vol.22
, pp. 317-325
-
-
Jørgensen, M.1
Sjøberg, D.I.K.2
-
47
-
-
44149127236
-
Avoiding irrelevant and misleading information when estimating development effort
-
Jørgensen, M. & Grimstad, S. (2008) Avoiding irrelevant and misleading information when estimating development effort. IEEE Software, 25, 78–83.
-
(2008)
IEEE Software
, vol.25
, pp. 78-83
-
-
Jørgensen, M.1
Grimstad, S.2
-
48
-
-
0000125529
-
Intuitive prediction: biases and corrective procedures
-
Kahneman, D. & Tversky, A. (1979) Intuitive prediction: biases and corrective procedures. TIMS Studies in Management Science, 12, 313–327.
-
(1979)
TIMS Studies in Management Science
, vol.12
, pp. 313-327
-
-
Kahneman, D.1
Tversky, A.2
-
49
-
-
0002731826
-
Timid choices and bold forecasts—a cognitive perspective on risk taking
-
Kahneman, D. & Lovallo, D. (1993) Timid choices and bold forecasts—a cognitive perspective on risk taking. Management science, 39, 17–31.
-
(1993)
Management science
, vol.39
, pp. 17-31
-
-
Kahneman, D.1
Lovallo, D.2
-
51
-
-
84905865379
-
Analysis of Gold Plating: a software development risk
-
Kaur, K., Jyoti, B. & Rani, R. (2013) Analysis of Gold Plating: a software development risk. International Journal of Computer Science and Communication Engineering, 2, 51–54.
-
(2013)
International Journal of Computer Science and Communication Engineering
, vol.2
, pp. 51-54
-
-
Kaur, K.1
Jyoti, B.2
Rani, R.3
-
52
-
-
84905743781
-
The impact of pricing and opportunistic behavior on information systems development
-
Kautz, K. (2009) The impact of pricing and opportunistic behavior on information systems development. Journal of Information Technology Theory and Application, 10, 24–41.
-
(2009)
Journal of Information Technology Theory and Application
, vol.10
, pp. 24-41
-
-
Kautz, K.1
-
53
-
-
0040918921
-
A cross-cultural study on escalation of commitment behavior in software projects
-
Keil, M., Tan, B., Kwok-Kee, W. & Saarinen, T. (2000) A cross-cultural study on escalation of commitment behavior in software projects. MIS Quarterly, 24, 299–325.
-
(2000)
MIS Quarterly
, vol.24
, pp. 299-325
-
-
Keil, M.1
Tan, B.2
Kwok-Kee, W.3
Saarinen, T.4
-
54
-
-
33846317823
-
Reporting bad news on software projects: the effects of culturally constituted views of face-saving
-
Keil, M., Im, G.P. & Mähring, M. (2007) Reporting bad news on software projects: the effects of culturally constituted views of face-saving. Information Systems Journal, 17, 59–87.
-
(2007)
Information Systems Journal
, vol.17
, pp. 59-87
-
-
Keil, M.1
G.P., I.2
Mähring, M.3
-
55
-
-
81255149030
-
Managing software project risks with the chi-square technique
-
Khanfar, K., Elzamly, A., Al-Ahmad, W., El-Qawasmeh, E., Alsamara, K. & Abuleil, S. (2008) Managing software project risks with the chi-square technique. International Management Review, 4, 18–29.
-
(2008)
International Management Review
, vol.4
, pp. 18-29
-
-
Khanfar, K.1
Elzamly, A.2
Al-Ahmad, W.3
El-Qawasmeh, E.4
Alsamara, K.5
Abuleil, S.6
-
56
-
-
33645166839
-
Understanding conceptual schemas: exploring the role of application and IS domain knowledge
-
Khatri, V., Vessey, I., Ramesh, V., Clay, P. & Park, S.J. (2006) Understanding conceptual schemas: exploring the role of application and IS domain knowledge. Information Systems Research, 17, 81–102.
-
(2006)
Information Systems Research
, vol.17
, pp. 81-102
-
-
Khatri, V.1
Vessey, I.2
Ramesh, V.3
Clay, P.4
Park, S.J.5
-
57
-
-
80053052701
-
Performers, trackers, lemmings and the lost: sustained false optimism in forecasting project outcomes—evidence from a quasi-experiment
-
Kutsch, E., Maylor, H., Weyer, B. & Lupson, J. (2011) Performers, trackers, lemmings and the lost: sustained false optimism in forecasting project outcomes—evidence from a quasi-experiment. International Journal of Project Management, 29, 1070–1081.
-
(2011)
International Journal of Project Management
, vol.29
, pp. 1070-1081
-
-
Kutsch, E.1
Maylor, H.2
Weyer, B.3
Lupson, J.4
-
58
-
-
84893192855
-
Confirmation biases in the financial analysis of IT investments
-
Legoux, R., Leger, P., Robert, J. & Boyer, M. (2014) Confirmation biases in the financial analysis of IT investments. Journal of the Association for Information Systems, 15, 33–52.
-
(2014)
Journal of the Association for Information Systems
, vol.15
, pp. 33-52
-
-
Legoux, R.1
Leger, P.2
Robert, J.3
Boyer, M.4
-
59
-
-
1642277111
-
Delusions of success: how optimism undermines executives' decisions
-
Lovallo, D. & Kahneman, D. (2003) Delusions of success: how optimism undermines executives' decisions. Harv. Bus. Rev., 81, 56–63.
-
(2003)
Harv. Bus. Rev.
, vol.81
, pp. 56-63
-
-
Lovallo, D.1
Kahneman, D.2
-
60
-
-
84905848759
-
Estimating the effects of Gold Plating using fuzzy cognitive maps
-
Malhotra, N., Bhardwaj, M. & Kaur, R. (2012) Estimating the effects of Gold Plating using fuzzy cognitive maps. International Journal of Computer Science and Information Technologies, 3, 4806–4808.
-
(2012)
International Journal of Computer Science and Information Technologies
, vol.3
, pp. 4806-4808
-
-
Malhotra, N.1
Bhardwaj, M.2
Kaur, R.3
-
61
-
-
0001856413
-
If we build it, they will come: designing information systems that people want to use
-
Markus, M.L. & Keil, M. (1994) If we build it, they will come: designing information systems that people want to use. Sloan Manage. Rev., 35, 11–25.
-
(1994)
Sloan Manage. Rev.
, vol.35
, pp. 11-25
-
-
Markus, M.L.1
Keil, M.2
-
62
-
-
0001591897
-
Portfolio approach to information systems
-
McFarlan, F.W. (1981) Portfolio approach to information systems. Harv. Bus. Rev., 59, 142–150.
-
(1981)
Harv. Bus. Rev.
, vol.59
, pp. 142-150
-
-
McFarlan, F.W.1
-
63
-
-
0032662225
-
Early communication key to software project success
-
Myers, W. (1999) Early communication key to software project success. Computer, 32, 110-111.
-
(1999)
Computer
, vol.32
, pp. 110-111
-
-
Myers, W.1
-
64
-
-
49049086019
-
IT project management: infamous failures, classic mistakes, and best practices
-
Nelson, R. (2007) IT project management: infamous failures, classic mistakes, and best practices. MIS Quarterly Executive, 6, 67–78.
-
(2007)
MIS Quarterly Executive
, vol.6
, pp. 67-78
-
-
Nelson, R.1
-
65
-
-
84973331807
-
The role of experience on techno-entrepreneurs' decision making biases
-
Nouri, P., Jamali, B. & Ghasemi, E. (2012) The role of experience on techno-entrepreneurs' decision making biases. Management Science Letters, 2, 1957–1964.
-
(2012)
Management Science Letters
, vol.2
, pp. 1957-1964
-
-
Nouri, P.1
Jamali, B.2
Ghasemi, E.3
-
67
-
-
32044455835
-
The social implications of planning: how public predictions bias future plans
-
Pezzo, S.P., Pezzo, M.V. & Stone, E.R. (2006a) The social implications of planning: how public predictions bias future plans. Journal of Experimental Social Psychology, 42, 221–227.
-
(2006)
Journal of Experimental Social Psychology
, vol.42
, pp. 221-227
-
-
Pezzo, S.P.1
Pezzo, M.V.2
Stone, E.R.3
-
68
-
-
33748434319
-
On the distinction between yuppies and hippies: individual differences in prediction biases for planning future tasks
-
Pezzo, M.V., Litman, J.A. & Pezzo, S.P. (2006b) On the distinction between yuppies and hippies: individual differences in prediction biases for planning future tasks. Personality and Individual Differences, 41, 1359–1371.
-
(2006)
Personality and Individual Differences
, vol.41
, pp. 1359-1371
-
-
Pezzo, M.V.1
Litman, J.A.2
Pezzo, S.P.3
-
70
-
-
0033734394
-
Components of software development risk: how to address them? A project manager survey
-
Ropponen, J. & Lyytinen, K. (2000) Components of software development risk: how to address them? A project manager survey. IEEE Transactions on Software Engineering, 26, 98–112.
-
(2000)
IEEE Transactions on Software Engineering
, vol.26
, pp. 98-112
-
-
Ropponen, J.1
Lyytinen, K.2
-
71
-
-
32644432149
-
Defeating feature fatigue
-
Rust, R.T., Thompson, D.V. & Hamilton, R.W. (2006) Defeating feature fatigue. Harv. Bus. Rev., 84, 98–107.
-
(2006)
Harv. Bus. Rev.
, vol.84
, pp. 98-107
-
-
Rust, R.T.1
Thompson, D.V.2
Hamilton, R.W.3
-
72
-
-
26444477650
-
The hourglass is half full or half empty: temporal framing and the group Planning Fallacy
-
Sanna, L.J., Parks, C.D., Chang, E.C. & Carter, S.E. (2005) The hourglass is half full or half empty: temporal framing and the group Planning Fallacy. Group Dynamics: Theory, Research and Practice, 9, 173–188.
-
(2005)
Group Dynamics: Theory, Research and Practice
, vol.9
, pp. 173-188
-
-
Sanna, L.J.1
Parks, C.D.2
Chang, E.C.3
Carter, S.E.4
-
73
-
-
36049001781
-
The impact of size and volatility on IT project performance
-
Sauer, C., Gemino, A. & Reich, B.H. (2007) The impact of size and volatility on IT project performance. Communications of the ACM, 50, 79–84.
-
(2007)
Communications of the ACM
, vol.50
, pp. 79-84
-
-
Sauer, C.1
Gemino, A.2
Reich, B.H.3
-
74
-
-
0034894377
-
Identifying software project risks: an international Delphi study
-
Schmidt, R., Lyytinen, K., Keil, M. & Cule, P. (2001) Identifying software project risks: an international Delphi study. Journal of Management Information Systems, 17, 5–36.
-
(2001)
Journal of Management Information Systems
, vol.17
, pp. 5-36
-
-
Schmidt, R.1
Lyytinen, K.2
Keil, M.3
Cule, P.4
-
75
-
-
0037991534
-
VCs' decision processes: evidence suggesting more experience may not always be better
-
Shepherd, D.A., Zacharakis, A. & Baron, R.A. (2003) VCs' decision processes: evidence suggesting more experience may not always be better. Journal of Business Venturing, 18, 381–401.
-
(2003)
Journal of Business Venturing
, vol.18
, pp. 381-401
-
-
Shepherd, D.A.1
Zacharakis, A.2
Baron, R.A.3
-
76
-
-
84971764252
-
Behavioral decision theory
-
Slovic, P., Fischhoff, B. & Lichtenstein, S. (1977) Behavioral decision theory. Annu. Rev. Psychol., 28, 1–39.
-
(1977)
Annu. Rev. Psychol.
, vol.28
, pp. 1-39
-
-
Slovic, P.1
Fischhoff, B.2
Lichtenstein, S.3
-
77
-
-
56749083174
-
Designing enterprise integration solutions: effectively
-
Umapathy, K., Purao, S. & Barton, R.R. (2008) Designing enterprise integration solutions: effectively. European Journal of Information Systems, 17, 518–527.
-
(2008)
European Journal of Information Systems
, vol.17
, pp. 518-527
-
-
Umapathy, K.1
Purao, S.2
Barton, R.R.3
-
79
-
-
70349268028
-
The what, why, who, when and how of software requirements.
-
Seattle, WA, May 16–18
-
Westfall, L. (2005) The what, why, who, when and how of software requirements.Proceedings of the ASQ World Conference on Quality and Improvement, Seattle, WA, May 16–18.
-
(2005)
Proceedings of the ASQ World Conference on Quality and Improvement
-
-
Westfall, L.1
-
80
-
-
53349142496
-
Executive information requirements: getting it right
-
Wetherbe, J.C. (1991) Executive information requirements: getting it right. MIS Quarterly, 15, 51–65.
-
(1991)
MIS Quarterly
, vol.15
, pp. 51-65
-
-
Wetherbe, J.C.1
-
81
-
-
84879300488
-
Triple your chances of project success risk and requirements
-
Denver, CO, June 23
-
Wheatcraft, L.S. (2011) Triple your chances of project success risk and requirements. INCOSE International Symposium, Denver, CO, June 23.
-
(2011)
INCOSE International Symposium
-
-
Wheatcraft, L.S.1
-
82
-
-
0034224238
-
Strengthening the case for pair programming
-
Williams, L., Kessler, R.R., Cunningham, W. & Jeffries, R. (2000) Strengthening the case for pair programming. IEEE Software, 17, 19–25.
-
(2000)
IEEE Software
, vol.17
, pp. 19-25
-
-
Williams, L.1
Kessler, R.R.2
Cunningham, W.3
Jeffries, R.4
-
83
-
-
37149027302
-
Coping with the cone of uncertainty: an empirical study of the SAIV process model
-
In, Springer, Berlin, Germany
-
Yang, D., Boehm, B., Yang, Y., Wang, Q. & Li, M. (2007) Coping with the cone of uncertainty: an empirical study of the SAIV process model. In: Software Process Dynamics and Agility, pp. 37–48, Springer, Berlin, Germany.
-
(2007)
Software Process Dynamics and Agility
, pp. 37-48
-
-
Yang, D.1
Boehm, B.2
Yang, Y.3
Wang, Q.4
Li, M.5
-
84
-
-
0003167359
-
Management of large software efforts
-
Zmud, R. (1980) Management of large software efforts. MIS Quarterly, 4, 45–55.
-
(1980)
MIS Quarterly
, vol.4
, pp. 45-55
-
-
Zmud, R.1
|