-
1
-
-
84893512410
-
-
Intergovernmental Panel of Climate Change, Berlin, Germany
-
IPCC Fifth Assessment Report: Synthesis Report 2014, Intergovernmental Panel of Climate Change, Berlin, Germany.
-
(2014)
Fifth Assessment Report: Synthesis Report
-
-
-
2
-
-
67449103894
-
Research on heat tolerance of extreme thermal environment in hyperthermal Coal Mine
-
(in Chinese)
-
Neng Z., Jing Z. Research on heat tolerance of extreme thermal environment in hyperthermal Coal Mine. Build. Energy Environ. 2006, 25(5):34-37. (in Chinese).
-
(2006)
Build. Energy Environ.
, vol.25
, Issue.5
, pp. 34-37
-
-
Neng, Z.1
Jing, Z.2
-
3
-
-
84941910363
-
-
Standardization administration of the People's Republic of China, Beijing, Interface (in Chinese)
-
AQSIQ Classified Standard of Working in the Hot Environment GB/T 4200-2008 2008, Standardization administration of the People's Republic of China, Beijing, Interface (in Chinese).
-
(2008)
Classified Standard of Working in the Hot Environment GB/T 4200-2008
-
-
-
4
-
-
84941895433
-
-
Occupational Health & Safety Branch, Ministry of Labour, Canada
-
Heat Stress Health and Safety Guideline 2013, Occupational Health & Safety Branch, Ministry of Labour, Canada.
-
(2013)
Heat Stress Health and Safety Guideline
-
-
-
5
-
-
77953960137
-
Path forward: emerging issues and challenges
-
Gillen M., Gittleman J.L. Path forward: emerging issues and challenges. J. Saf. Res. 2010, 41(3):301-306.
-
(2010)
J. Saf. Res.
, vol.41
, Issue.3
, pp. 301-306
-
-
Gillen, M.1
Gittleman, J.L.2
-
7
-
-
84900631803
-
From heat tolerance time to optimal recovery time - a heat stress model for construction workers in Hong Kong
-
Chan A.P.C. From heat tolerance time to optimal recovery time - a heat stress model for construction workers in Hong Kong. University: Presentation at Hong Kong Polytechnic 2012.
-
(2012)
University: Presentation at Hong Kong Polytechnic
-
-
Chan, A.P.C.1
-
8
-
-
0022679189
-
Work sampling can predict unit rate productivity
-
Liou F., Borcherding J.D. Work sampling can predict unit rate productivity. J. Constr. Eng. Manage. 1986, 112(1):90-103.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.1
, pp. 90-103
-
-
Liou, F.1
Borcherding, J.D.2
-
9
-
-
78649279024
-
Critical investigation into the applicability of the learning curve theory to Rebar fixing labor productivity
-
Jarkas A.M. Critical investigation into the applicability of the learning curve theory to Rebar fixing labor productivity. J. Constr. Eng. Manag. 2010, 136(12):1279-1288.
-
(2010)
J. Constr. Eng. Manag.
, vol.136
, Issue.12
, pp. 1279-1288
-
-
Jarkas, A.M.1
-
10
-
-
84938640753
-
Estimating lost labor productivity in construction claims
-
Mcdonald D.F., Zack J.G. Estimating lost labor productivity in construction claims. AACE Int. Recomm. Pract. 2004, 25R:3.
-
(2004)
AACE Int. Recomm. Pract.
, vol.25R
, pp. 3
-
-
Mcdonald, D.F.1
Zack, J.G.2
-
11
-
-
74949122039
-
Workplace heat stress, health and productivity - an increasing challenge for low and middle-income countries during climate change
-
Kjellstrom T., Holmer I., Lemke B. Workplace heat stress, health and productivity - an increasing challenge for low and middle-income countries during climate change. Glob. Health Action 2009, 2:47-52.
-
(2009)
Glob. Health Action
, vol.2
, pp. 47-52
-
-
Kjellstrom, T.1
Holmer, I.2
Lemke, B.3
-
12
-
-
84883439665
-
Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future
-
Sahu S., Sett M., Kjellstrom T. Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future. Ind. Health 2013, 51(4):424-431.
-
(2013)
Ind. Health
, vol.51
, Issue.4
, pp. 424-431
-
-
Sahu, S.1
Sett, M.2
Kjellstrom, T.3
-
13
-
-
84900042494
-
Management of climatic heat stress risk in construction: a review of practices, methodologies, and future research
-
Rowlinson S., YunyanJia A., Li B., Chuanjingju C. Management of climatic heat stress risk in construction: a review of practices, methodologies, and future research. Accid. Anal. Prev. 2014, 66:187-198.
-
(2014)
Accid. Anal. Prev.
, vol.66
, pp. 187-198
-
-
Rowlinson, S.1
YunyanJia, A.2
Li, B.3
Chuanjingju, C.4
-
14
-
-
84894422581
-
Critical review of labor productivity research in construction journals
-
Yi W., Chan A.P.C. Critical review of labor productivity research in construction journals. J. Manage. Eng. 2014, 30(2):214-225.
-
(2014)
J. Manage. Eng.
, vol.30
, Issue.2
, pp. 214-225
-
-
Yi, W.1
Chan, A.P.C.2
-
16
-
-
84864811612
-
Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment
-
Chan A.P.C., Yi W., Wong D.P., Yam M.C.H., Chan D.W.M. Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment. Build. Environ. 2012, 58:163-171.
-
(2012)
Build. Environ.
, vol.58
, pp. 163-171
-
-
Chan, A.P.C.1
Yi, W.2
Wong, D.P.3
Yam, M.C.H.4
Chan, D.W.M.5
-
17
-
-
84858744209
-
Determining an optimal recovery time after exercising to exhaustion in a controlled climatic environment: application to construction works
-
Chan A.P.C., Wong F.K.W., Wong D.P., Lam E.W.M., Yi W. Determining an optimal recovery time after exercising to exhaustion in a controlled climatic environment: application to construction works. Build. Environ. 2012, 56:28-37.
-
(2012)
Build. Environ.
, vol.56
, pp. 28-37
-
-
Chan, A.P.C.1
Wong, F.K.W.2
Wong, D.P.3
Lam, E.W.M.4
Yi, W.5
-
18
-
-
84872459109
-
Optimizing work-rest schedule for construction rebar workers in hot and humid environment
-
Yi W., Chan A.P.C. Optimizing work-rest schedule for construction rebar workers in hot and humid environment. Build. Environ. 2013, 61:104-113.
-
(2013)
Build. Environ.
, vol.61
, pp. 104-113
-
-
Yi, W.1
Chan, A.P.C.2
-
19
-
-
0032046758
-
The effect of hot weather on construction labor productivity and costs
-
Hancher D.E., Abd-Elkhalek H.A. The effect of hot weather on construction labor productivity and costs. Cost. Eng. 1998, 40(4):32.
-
(1998)
Cost. Eng.
, vol.40
, Issue.4
, pp. 32
-
-
Hancher, D.E.1
Abd-Elkhalek, H.A.2
-
20
-
-
67449091261
-
Productivity model in hot and humid environment based on heat tolerance time analysis
-
Zhao J., Zhu N., Lu S. Productivity model in hot and humid environment based on heat tolerance time analysis. Build. Environ. 2009, 44(11):2202-2207.
-
(2009)
Build. Environ.
, vol.44
, Issue.11
, pp. 2202-2207
-
-
Zhao, J.1
Zhu, N.2
Lu, S.3
-
21
-
-
51849095296
-
Measuring and modeling labor productivity using historical data
-
Song L., Abourizk S.M. Measuring and modeling labor productivity using historical data. J. Constr. Eng. Manage. 2008, 134(10):786-794.
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.10
, pp. 786-794
-
-
Song, L.1
Abourizk, S.M.2
-
22
-
-
0032206731
-
Construction labor productivity modeling with neural networks
-
Sonmez R., Rowings J.E. Construction labor productivity modeling with neural networks. J. Constr. Eng. Manage. 1998, 124(6):498-504.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 498-504
-
-
Sonmez, R.1
Rowings, J.E.2
-
23
-
-
45749117591
-
Relative productivity in the AEC industries in the United States for on-site and off-site activities
-
Eastman C.M., Sacks R. Relative productivity in the AEC industries in the United States for on-site and off-site activities. J. Constr. Eng. Manage. 2008, 134(7):517-526.
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.7
, pp. 517-526
-
-
Eastman, C.M.1
Sacks, R.2
-
24
-
-
79960433097
-
-
School of Public Health, Curtin University of Technology, Australia, (Ph.D. thesis)
-
Brake D.J. The Deep Body Core Temperatures, Physical Fatigue and Fluid Status of Thermally Stressed Workers and the Development of Thermal Work Limit as an Index of Heat Stress 2002, School of Public Health, Curtin University of Technology, Australia, (Ph.D. thesis).
-
(2002)
The Deep Body Core Temperatures, Physical Fatigue and Fluid Status of Thermally Stressed Workers and the Development of Thermal Work Limit as an Index of Heat Stress
-
-
Brake, D.J.1
-
25
-
-
0032673945
-
Loss of labor productivity due to delivery methods and weather
-
Thomas H.R., Riley D.R., Sanvido V.E. Loss of labor productivity due to delivery methods and weather. J. Constr. Eng. Manage. 1999, 125(1):39-46.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 39-46
-
-
Thomas, H.R.1
Riley, D.R.2
Sanvido, V.E.3
-
28
-
-
84941883739
-
-
Workplace Safety & Health Topics. (Date accessed).
-
The National Institute for Occupational Safety and Health, USA. Workplace Safety & Health Topics. Available at: , (Date accessed). http://www.cdc.gov/niosh/topics/heatstress/acclima.html/2015.
-
-
-
-
29
-
-
84939126606
-
Influence of the temperature and relative humidity on human heat acclimatization during training in extremely hot environments
-
Shen D., Zhu N. Influence of the temperature and relative humidity on human heat acclimatization during training in extremely hot environments. Build. Environ. 2015, 94:1-11.
-
(2015)
Build. Environ.
, vol.94
, pp. 1-11
-
-
Shen, D.1
Zhu, N.2
-
30
-
-
37249083568
-
Wet-bulb globe temperature (WBGT)-its history and its limitations
-
Budd G.M. Wet-bulb globe temperature (WBGT)-its history and its limitations. J. Sci. Med. Sport 2008, 11(1):20-32.
-
(2008)
J. Sci. Med. Sport
, vol.11
, Issue.1
, pp. 20-32
-
-
Budd, G.M.1
-
35
-
-
0026382438
-
Factors affecting masonry-labor productivity
-
Sanders S.R., Thomas H.R. Factors affecting masonry-labor productivity. J. Constr. Eng. Manage. 1991, 117(4):626-644.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.4
, pp. 626-644
-
-
Sanders, S.R.1
Thomas, H.R.2
-
36
-
-
0035510283
-
Estimating labor production rates for industrial construction activities
-
AbouRizk S., Knowles P., Hermann U.R. Estimating labor production rates for industrial construction activities. J. Constr. Eng. Manage. 2001, 127(6):502-511.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 502-511
-
-
AbouRizk, S.1
Knowles, P.2
Hermann, U.R.3
-
37
-
-
25444440655
-
Predicting industrial construction labor productivity using fuzzy expert systems
-
Fayek A.R., Oduba A. Predicting industrial construction labor productivity using fuzzy expert systems. J. Constr. Eng. Manage. 2005, 131(8):938-941.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.8
, pp. 938-941
-
-
Fayek, A.R.1
Oduba, A.2
-
38
-
-
77953660083
-
Preliminary results of major labour productivity monitoring programme
-
Symposium Construction Management, Cavtat.
-
Horner R, Talhouni BT, Thomas HR. Preliminary results of major labour productivity monitoring programme, Proceedings of the 3rd Yugoslavian. Symposium Construction Management, Cavtat. 18-28.
-
Proceedings of the 3rd Yugoslavian
, pp. 18-28
-
-
Horner, R.1
Talhouni, B.T.2
Thomas, H.R.3
-
39
-
-
34548593425
-
Factors affecting the productivity of building craftsmen-studies of Uganda
-
Alinaitwe H.M., Mwakali J.A., Hansson B. Factors affecting the productivity of building craftsmen-studies of Uganda. J. Civ. Eng. Manage. 2007, 13(3):169-176.
-
(2007)
J. Civ. Eng. Manage.
, vol.13
, Issue.3
, pp. 169-176
-
-
Alinaitwe, H.M.1
Mwakali, J.A.2
Hansson, B.3
-
40
-
-
37849024121
-
Factors affecting labour productivity in building projects in the Gaza Strip
-
Enshassi A., Mohamed S., Mustafa Z.A., Mayer P.E. Factors affecting labour productivity in building projects in the Gaza Strip. J. Civ. Eng. Manage. 2007, 13(4):245-254.
-
(2007)
J. Civ. Eng. Manage.
, vol.13
, Issue.4
, pp. 245-254
-
-
Enshassi, A.1
Mohamed, S.2
Mustafa, Z.A.3
Mayer, P.E.4
-
42
-
-
84926417699
-
Modelling masonry crew productivity using two artificial neural network techniques
-
Gerek I.H., Erdis E., Mistikoglu G., Usmen M. Modelling masonry crew productivity using two artificial neural network techniques. J. Civ. Eng. Manage. 2015, 21(2):231-238.
-
(2015)
J. Civ. Eng. Manage.
, vol.21
, Issue.2
, pp. 231-238
-
-
Gerek, I.H.1
Erdis, E.2
Mistikoglu, G.3
Usmen, M.4
-
43
-
-
0024228273
-
Nutrition and labor productivity in agriculture: estimates for Rural South India
-
Deolalikar A.B. Nutrition and labor productivity in agriculture: estimates for Rural South India. Rev. Econ. Stat. 1988, 406-413.
-
(1988)
Rev. Econ. Stat.
, pp. 406-413
-
-
Deolalikar, A.B.1
-
45
-
-
84874001088
-
Factors affecting construction labor productivity in Kuwait
-
Jarkas A.M., Bitar C.G. Factors affecting construction labor productivity in Kuwait. J. Constr. Eng. Manage. 2012, 138(7):811-820.
-
(2012)
J. Constr. Eng. Manage.
, vol.138
, Issue.7
, pp. 811-820
-
-
Jarkas, A.M.1
Bitar, C.G.2
-
46
-
-
84858841235
-
On-site labour productivity of New Zealand construction industry: key constraints and improvement measures
-
Durdyev S., Mbachu J. On-site labour productivity of New Zealand construction industry: key constraints and improvement measures. Australas. J. Constr. Econ. Build. 2011, 11(3):18-33.
-
(2011)
Australas. J. Constr. Econ. Build.
, vol.11
, Issue.3
, pp. 18-33
-
-
Durdyev, S.1
Mbachu, J.2
-
47
-
-
38849161608
-
Major factors influencing productivity of water and wastewater treatment plant construction: evidence from the deep south USA
-
Mojahed S., Aghazadeh F. Major factors influencing productivity of water and wastewater treatment plant construction: evidence from the deep south USA. Int. J. Proj. Manage. 2008, 26(2):195-202.
-
(2008)
Int. J. Proj. Manage.
, vol.26
, Issue.2
, pp. 195-202
-
-
Mojahed, S.1
Aghazadeh, F.2
-
48
-
-
60449102494
-
Construction craft workers' perceptions of the factors affecting their productivity
-
Dai J., Goodrum P.M., Maloney W.F. Construction craft workers' perceptions of the factors affecting their productivity. J. Constr. Eng. Manage. 2009, 135(3):217-226.
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.3
, pp. 217-226
-
-
Dai, J.1
Goodrum, P.M.2
Maloney, W.F.3
-
49
-
-
2342437438
-
A survey of constraints on Iranian construction operatives' productivity
-
Zakeri M., Olomolaiye P.O., Holt G.D., Harris F.C. A survey of constraints on Iranian construction operatives' productivity. Constr. Manage. Econ. 1996, 14(5):417-426.
-
(1996)
Constr. Manage. Econ.
, vol.14
, Issue.5
, pp. 417-426
-
-
Zakeri, M.1
Olomolaiye, P.O.2
Holt, G.D.3
Harris, F.C.4
-
50
-
-
84941913861
-
Construction productivity in Turkmenistan: survey of the constraining factors
-
Durdyev S., Ismail S., Bakar N.A. Construction productivity in Turkmenistan: survey of the constraining factors. Changes 2013, 90(64):34.
-
(2013)
Changes
, vol.90
, Issue.64
, pp. 34
-
-
Durdyev, S.1
Ismail, S.2
Bakar, N.A.3
-
51
-
-
84891407687
-
Factors influencing construction labor productivity in Egypt
-
El-Gohary K.M., Aziz R.F. Factors influencing construction labor productivity in Egypt. J. Manage. Eng. 2014, 30(1):1-9.
-
(2014)
J. Manage. Eng.
, vol.30
, Issue.1
, pp. 1-9
-
-
El-Gohary, K.M.1
Aziz, R.F.2
-
52
-
-
84885103026
-
Contractors perspective toward factors affecting labor productivity in building construction
-
Mahamid I. Contractors perspective toward factors affecting labor productivity in building construction. Eng. Constr. Archit. Manag. 2013, 20(5):446-460.
-
(2013)
Eng. Constr. Archit. Manag.
, vol.20
, Issue.5
, pp. 446-460
-
-
Mahamid, I.1
-
53
-
-
0003747807
-
-
University of Texas at Austin, Austin, TX, Publication 3-1
-
Construction Industry Institute (CII) Constructability: a Primer 1986, University of Texas at Austin, Austin, TX, Publication 3-1.
-
(1986)
Constructability: a Primer
-
-
-
54
-
-
84883439665
-
Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future
-
Sahu S., Sett M., Kjellstrom T. Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future. Ind. Health 2013, 51(4):424-431.
-
(2013)
Ind. Health
, vol.51
, Issue.4
, pp. 424-431
-
-
Sahu, S.1
Sett, M.2
Kjellstrom, T.3
-
55
-
-
0019698750
-
Financial incentives to raise productivity
-
Laufer A., Borcherding J.D. Financial incentives to raise productivity. J. Constr. Div. 1981, 107(4):745-756.
-
(1981)
J. Constr. Div.
, vol.107
, Issue.4
, pp. 745-756
-
-
Laufer, A.1
Borcherding, J.D.2
-
56
-
-
79960075291
-
Critical factors influencing construction productivity in Thailand
-
Makulsawatudom A., Emsley M., Sinthawanarong K. Critical factors influencing construction productivity in Thailand. J. KMITNB 2004, 14(3):1-6.
-
(2004)
J. KMITNB
, vol.14
, Issue.3
, pp. 1-6
-
-
Makulsawatudom, A.1
Emsley, M.2
Sinthawanarong, K.3
|