메뉴 건너뛰기




Volumn 95, Issue , 2016, Pages 42-52

Evaluating the impacts of high-temperature outdoor working environments on construction labor productivity in China: A case study of rebar workers

Author keywords

Construction labor productivity; Heat stress; High temperature environments; Rebar labor

Indexed keywords

CONSTRUCTION INDUSTRY; HAZARDS; THERMAL STRESS;

EID: 84941926241     PISSN: 03601323     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.buildenv.2015.09.005     Document Type: Article
Times cited : (148)

References (59)
  • 1
    • 84893512410 scopus 로고    scopus 로고
    • Intergovernmental Panel of Climate Change, Berlin, Germany
    • IPCC Fifth Assessment Report: Synthesis Report 2014, Intergovernmental Panel of Climate Change, Berlin, Germany.
    • (2014) Fifth Assessment Report: Synthesis Report
  • 2
    • 67449103894 scopus 로고    scopus 로고
    • Research on heat tolerance of extreme thermal environment in hyperthermal Coal Mine
    • (in Chinese)
    • Neng Z., Jing Z. Research on heat tolerance of extreme thermal environment in hyperthermal Coal Mine. Build. Energy Environ. 2006, 25(5):34-37. (in Chinese).
    • (2006) Build. Energy Environ. , vol.25 , Issue.5 , pp. 34-37
    • Neng, Z.1    Jing, Z.2
  • 3
    • 84941910363 scopus 로고    scopus 로고
    • Standardization administration of the People's Republic of China, Beijing, Interface (in Chinese)
    • AQSIQ Classified Standard of Working in the Hot Environment GB/T 4200-2008 2008, Standardization administration of the People's Republic of China, Beijing, Interface (in Chinese).
    • (2008) Classified Standard of Working in the Hot Environment GB/T 4200-2008
  • 4
    • 84941895433 scopus 로고    scopus 로고
    • Occupational Health & Safety Branch, Ministry of Labour, Canada
    • Heat Stress Health and Safety Guideline 2013, Occupational Health & Safety Branch, Ministry of Labour, Canada.
    • (2013) Heat Stress Health and Safety Guideline
  • 5
    • 77953960137 scopus 로고    scopus 로고
    • Path forward: emerging issues and challenges
    • Gillen M., Gittleman J.L. Path forward: emerging issues and challenges. J. Saf. Res. 2010, 41(3):301-306.
    • (2010) J. Saf. Res. , vol.41 , Issue.3 , pp. 301-306
    • Gillen, M.1    Gittleman, J.L.2
  • 7
    • 84900631803 scopus 로고    scopus 로고
    • From heat tolerance time to optimal recovery time - a heat stress model for construction workers in Hong Kong
    • Chan A.P.C. From heat tolerance time to optimal recovery time - a heat stress model for construction workers in Hong Kong. University: Presentation at Hong Kong Polytechnic 2012.
    • (2012) University: Presentation at Hong Kong Polytechnic
    • Chan, A.P.C.1
  • 8
    • 0022679189 scopus 로고
    • Work sampling can predict unit rate productivity
    • Liou F., Borcherding J.D. Work sampling can predict unit rate productivity. J. Constr. Eng. Manage. 1986, 112(1):90-103.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 90-103
    • Liou, F.1    Borcherding, J.D.2
  • 9
    • 78649279024 scopus 로고    scopus 로고
    • Critical investigation into the applicability of the learning curve theory to Rebar fixing labor productivity
    • Jarkas A.M. Critical investigation into the applicability of the learning curve theory to Rebar fixing labor productivity. J. Constr. Eng. Manag. 2010, 136(12):1279-1288.
    • (2010) J. Constr. Eng. Manag. , vol.136 , Issue.12 , pp. 1279-1288
    • Jarkas, A.M.1
  • 10
    • 84938640753 scopus 로고    scopus 로고
    • Estimating lost labor productivity in construction claims
    • Mcdonald D.F., Zack J.G. Estimating lost labor productivity in construction claims. AACE Int. Recomm. Pract. 2004, 25R:3.
    • (2004) AACE Int. Recomm. Pract. , vol.25R , pp. 3
    • Mcdonald, D.F.1    Zack, J.G.2
  • 11
    • 74949122039 scopus 로고    scopus 로고
    • Workplace heat stress, health and productivity - an increasing challenge for low and middle-income countries during climate change
    • Kjellstrom T., Holmer I., Lemke B. Workplace heat stress, health and productivity - an increasing challenge for low and middle-income countries during climate change. Glob. Health Action 2009, 2:47-52.
    • (2009) Glob. Health Action , vol.2 , pp. 47-52
    • Kjellstrom, T.1    Holmer, I.2    Lemke, B.3
  • 12
    • 84883439665 scopus 로고    scopus 로고
    • Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future
    • Sahu S., Sett M., Kjellstrom T. Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future. Ind. Health 2013, 51(4):424-431.
    • (2013) Ind. Health , vol.51 , Issue.4 , pp. 424-431
    • Sahu, S.1    Sett, M.2    Kjellstrom, T.3
  • 13
    • 84900042494 scopus 로고    scopus 로고
    • Management of climatic heat stress risk in construction: a review of practices, methodologies, and future research
    • Rowlinson S., YunyanJia A., Li B., Chuanjingju C. Management of climatic heat stress risk in construction: a review of practices, methodologies, and future research. Accid. Anal. Prev. 2014, 66:187-198.
    • (2014) Accid. Anal. Prev. , vol.66 , pp. 187-198
    • Rowlinson, S.1    YunyanJia, A.2    Li, B.3    Chuanjingju, C.4
  • 14
    • 84894422581 scopus 로고    scopus 로고
    • Critical review of labor productivity research in construction journals
    • Yi W., Chan A.P.C. Critical review of labor productivity research in construction journals. J. Manage. Eng. 2014, 30(2):214-225.
    • (2014) J. Manage. Eng. , vol.30 , Issue.2 , pp. 214-225
    • Yi, W.1    Chan, A.P.C.2
  • 16
    • 84864811612 scopus 로고    scopus 로고
    • Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment
    • Chan A.P.C., Yi W., Wong D.P., Yam M.C.H., Chan D.W.M. Determining an optimal recovery time for construction rebar workers after working to exhaustion in a hot and humid environment. Build. Environ. 2012, 58:163-171.
    • (2012) Build. Environ. , vol.58 , pp. 163-171
    • Chan, A.P.C.1    Yi, W.2    Wong, D.P.3    Yam, M.C.H.4    Chan, D.W.M.5
  • 17
    • 84858744209 scopus 로고    scopus 로고
    • Determining an optimal recovery time after exercising to exhaustion in a controlled climatic environment: application to construction works
    • Chan A.P.C., Wong F.K.W., Wong D.P., Lam E.W.M., Yi W. Determining an optimal recovery time after exercising to exhaustion in a controlled climatic environment: application to construction works. Build. Environ. 2012, 56:28-37.
    • (2012) Build. Environ. , vol.56 , pp. 28-37
    • Chan, A.P.C.1    Wong, F.K.W.2    Wong, D.P.3    Lam, E.W.M.4    Yi, W.5
  • 18
    • 84872459109 scopus 로고    scopus 로고
    • Optimizing work-rest schedule for construction rebar workers in hot and humid environment
    • Yi W., Chan A.P.C. Optimizing work-rest schedule for construction rebar workers in hot and humid environment. Build. Environ. 2013, 61:104-113.
    • (2013) Build. Environ. , vol.61 , pp. 104-113
    • Yi, W.1    Chan, A.P.C.2
  • 19
    • 0032046758 scopus 로고    scopus 로고
    • The effect of hot weather on construction labor productivity and costs
    • Hancher D.E., Abd-Elkhalek H.A. The effect of hot weather on construction labor productivity and costs. Cost. Eng. 1998, 40(4):32.
    • (1998) Cost. Eng. , vol.40 , Issue.4 , pp. 32
    • Hancher, D.E.1    Abd-Elkhalek, H.A.2
  • 20
    • 67449091261 scopus 로고    scopus 로고
    • Productivity model in hot and humid environment based on heat tolerance time analysis
    • Zhao J., Zhu N., Lu S. Productivity model in hot and humid environment based on heat tolerance time analysis. Build. Environ. 2009, 44(11):2202-2207.
    • (2009) Build. Environ. , vol.44 , Issue.11 , pp. 2202-2207
    • Zhao, J.1    Zhu, N.2    Lu, S.3
  • 21
    • 51849095296 scopus 로고    scopus 로고
    • Measuring and modeling labor productivity using historical data
    • Song L., Abourizk S.M. Measuring and modeling labor productivity using historical data. J. Constr. Eng. Manage. 2008, 134(10):786-794.
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.10 , pp. 786-794
    • Song, L.1    Abourizk, S.M.2
  • 22
    • 0032206731 scopus 로고    scopus 로고
    • Construction labor productivity modeling with neural networks
    • Sonmez R., Rowings J.E. Construction labor productivity modeling with neural networks. J. Constr. Eng. Manage. 1998, 124(6):498-504.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 498-504
    • Sonmez, R.1    Rowings, J.E.2
  • 23
    • 45749117591 scopus 로고    scopus 로고
    • Relative productivity in the AEC industries in the United States for on-site and off-site activities
    • Eastman C.M., Sacks R. Relative productivity in the AEC industries in the United States for on-site and off-site activities. J. Constr. Eng. Manage. 2008, 134(7):517-526.
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.7 , pp. 517-526
    • Eastman, C.M.1    Sacks, R.2
  • 25
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • Thomas H.R., Riley D.R., Sanvido V.E. Loss of labor productivity due to delivery methods and weather. J. Constr. Eng. Manage. 1999, 125(1):39-46.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, H.R.1    Riley, D.R.2    Sanvido, V.E.3
  • 28
    • 84941883739 scopus 로고    scopus 로고
    • Workplace Safety & Health Topics. (Date accessed).
    • The National Institute for Occupational Safety and Health, USA. Workplace Safety & Health Topics. Available at: , (Date accessed). http://www.cdc.gov/niosh/topics/heatstress/acclima.html/2015.
  • 29
    • 84939126606 scopus 로고    scopus 로고
    • Influence of the temperature and relative humidity on human heat acclimatization during training in extremely hot environments
    • Shen D., Zhu N. Influence of the temperature and relative humidity on human heat acclimatization during training in extremely hot environments. Build. Environ. 2015, 94:1-11.
    • (2015) Build. Environ. , vol.94 , pp. 1-11
    • Shen, D.1    Zhu, N.2
  • 30
    • 37249083568 scopus 로고    scopus 로고
    • Wet-bulb globe temperature (WBGT)-its history and its limitations
    • Budd G.M. Wet-bulb globe temperature (WBGT)-its history and its limitations. J. Sci. Med. Sport 2008, 11(1):20-32.
    • (2008) J. Sci. Med. Sport , vol.11 , Issue.1 , pp. 20-32
    • Budd, G.M.1
  • 35
    • 0026382438 scopus 로고
    • Factors affecting masonry-labor productivity
    • Sanders S.R., Thomas H.R. Factors affecting masonry-labor productivity. J. Constr. Eng. Manage. 1991, 117(4):626-644.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.4 , pp. 626-644
    • Sanders, S.R.1    Thomas, H.R.2
  • 36
    • 0035510283 scopus 로고    scopus 로고
    • Estimating labor production rates for industrial construction activities
    • AbouRizk S., Knowles P., Hermann U.R. Estimating labor production rates for industrial construction activities. J. Constr. Eng. Manage. 2001, 127(6):502-511.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 502-511
    • AbouRizk, S.1    Knowles, P.2    Hermann, U.R.3
  • 37
    • 25444440655 scopus 로고    scopus 로고
    • Predicting industrial construction labor productivity using fuzzy expert systems
    • Fayek A.R., Oduba A. Predicting industrial construction labor productivity using fuzzy expert systems. J. Constr. Eng. Manage. 2005, 131(8):938-941.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.8 , pp. 938-941
    • Fayek, A.R.1    Oduba, A.2
  • 38
    • 77953660083 scopus 로고    scopus 로고
    • Preliminary results of major labour productivity monitoring programme
    • Symposium Construction Management, Cavtat.
    • Horner R, Talhouni BT, Thomas HR. Preliminary results of major labour productivity monitoring programme, Proceedings of the 3rd Yugoslavian. Symposium Construction Management, Cavtat. 18-28.
    • Proceedings of the 3rd Yugoslavian , pp. 18-28
    • Horner, R.1    Talhouni, B.T.2    Thomas, H.R.3
  • 39
    • 34548593425 scopus 로고    scopus 로고
    • Factors affecting the productivity of building craftsmen-studies of Uganda
    • Alinaitwe H.M., Mwakali J.A., Hansson B. Factors affecting the productivity of building craftsmen-studies of Uganda. J. Civ. Eng. Manage. 2007, 13(3):169-176.
    • (2007) J. Civ. Eng. Manage. , vol.13 , Issue.3 , pp. 169-176
    • Alinaitwe, H.M.1    Mwakali, J.A.2    Hansson, B.3
  • 40
    • 37849024121 scopus 로고    scopus 로고
    • Factors affecting labour productivity in building projects in the Gaza Strip
    • Enshassi A., Mohamed S., Mustafa Z.A., Mayer P.E. Factors affecting labour productivity in building projects in the Gaza Strip. J. Civ. Eng. Manage. 2007, 13(4):245-254.
    • (2007) J. Civ. Eng. Manage. , vol.13 , Issue.4 , pp. 245-254
    • Enshassi, A.1    Mohamed, S.2    Mustafa, Z.A.3    Mayer, P.E.4
  • 42
    • 84926417699 scopus 로고    scopus 로고
    • Modelling masonry crew productivity using two artificial neural network techniques
    • Gerek I.H., Erdis E., Mistikoglu G., Usmen M. Modelling masonry crew productivity using two artificial neural network techniques. J. Civ. Eng. Manage. 2015, 21(2):231-238.
    • (2015) J. Civ. Eng. Manage. , vol.21 , Issue.2 , pp. 231-238
    • Gerek, I.H.1    Erdis, E.2    Mistikoglu, G.3    Usmen, M.4
  • 43
    • 0024228273 scopus 로고
    • Nutrition and labor productivity in agriculture: estimates for Rural South India
    • Deolalikar A.B. Nutrition and labor productivity in agriculture: estimates for Rural South India. Rev. Econ. Stat. 1988, 406-413.
    • (1988) Rev. Econ. Stat. , pp. 406-413
    • Deolalikar, A.B.1
  • 45
    • 84874001088 scopus 로고    scopus 로고
    • Factors affecting construction labor productivity in Kuwait
    • Jarkas A.M., Bitar C.G. Factors affecting construction labor productivity in Kuwait. J. Constr. Eng. Manage. 2012, 138(7):811-820.
    • (2012) J. Constr. Eng. Manage. , vol.138 , Issue.7 , pp. 811-820
    • Jarkas, A.M.1    Bitar, C.G.2
  • 46
    • 84858841235 scopus 로고    scopus 로고
    • On-site labour productivity of New Zealand construction industry: key constraints and improvement measures
    • Durdyev S., Mbachu J. On-site labour productivity of New Zealand construction industry: key constraints and improvement measures. Australas. J. Constr. Econ. Build. 2011, 11(3):18-33.
    • (2011) Australas. J. Constr. Econ. Build. , vol.11 , Issue.3 , pp. 18-33
    • Durdyev, S.1    Mbachu, J.2
  • 47
    • 38849161608 scopus 로고    scopus 로고
    • Major factors influencing productivity of water and wastewater treatment plant construction: evidence from the deep south USA
    • Mojahed S., Aghazadeh F. Major factors influencing productivity of water and wastewater treatment plant construction: evidence from the deep south USA. Int. J. Proj. Manage. 2008, 26(2):195-202.
    • (2008) Int. J. Proj. Manage. , vol.26 , Issue.2 , pp. 195-202
    • Mojahed, S.1    Aghazadeh, F.2
  • 48
    • 60449102494 scopus 로고    scopus 로고
    • Construction craft workers' perceptions of the factors affecting their productivity
    • Dai J., Goodrum P.M., Maloney W.F. Construction craft workers' perceptions of the factors affecting their productivity. J. Constr. Eng. Manage. 2009, 135(3):217-226.
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.3 , pp. 217-226
    • Dai, J.1    Goodrum, P.M.2    Maloney, W.F.3
  • 49
    • 2342437438 scopus 로고    scopus 로고
    • A survey of constraints on Iranian construction operatives' productivity
    • Zakeri M., Olomolaiye P.O., Holt G.D., Harris F.C. A survey of constraints on Iranian construction operatives' productivity. Constr. Manage. Econ. 1996, 14(5):417-426.
    • (1996) Constr. Manage. Econ. , vol.14 , Issue.5 , pp. 417-426
    • Zakeri, M.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4
  • 50
    • 84941913861 scopus 로고    scopus 로고
    • Construction productivity in Turkmenistan: survey of the constraining factors
    • Durdyev S., Ismail S., Bakar N.A. Construction productivity in Turkmenistan: survey of the constraining factors. Changes 2013, 90(64):34.
    • (2013) Changes , vol.90 , Issue.64 , pp. 34
    • Durdyev, S.1    Ismail, S.2    Bakar, N.A.3
  • 51
    • 84891407687 scopus 로고    scopus 로고
    • Factors influencing construction labor productivity in Egypt
    • El-Gohary K.M., Aziz R.F. Factors influencing construction labor productivity in Egypt. J. Manage. Eng. 2014, 30(1):1-9.
    • (2014) J. Manage. Eng. , vol.30 , Issue.1 , pp. 1-9
    • El-Gohary, K.M.1    Aziz, R.F.2
  • 52
    • 84885103026 scopus 로고    scopus 로고
    • Contractors perspective toward factors affecting labor productivity in building construction
    • Mahamid I. Contractors perspective toward factors affecting labor productivity in building construction. Eng. Constr. Archit. Manag. 2013, 20(5):446-460.
    • (2013) Eng. Constr. Archit. Manag. , vol.20 , Issue.5 , pp. 446-460
    • Mahamid, I.1
  • 53
    • 0003747807 scopus 로고
    • University of Texas at Austin, Austin, TX, Publication 3-1
    • Construction Industry Institute (CII) Constructability: a Primer 1986, University of Texas at Austin, Austin, TX, Publication 3-1.
    • (1986) Constructability: a Primer
  • 54
    • 84883439665 scopus 로고    scopus 로고
    • Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future
    • Sahu S., Sett M., Kjellstrom T. Heat exposure, cardiovascular stress and work productivity in rice harvesters in India: implications for a climate change future. Ind. Health 2013, 51(4):424-431.
    • (2013) Ind. Health , vol.51 , Issue.4 , pp. 424-431
    • Sahu, S.1    Sett, M.2    Kjellstrom, T.3
  • 55
    • 0019698750 scopus 로고
    • Financial incentives to raise productivity
    • Laufer A., Borcherding J.D. Financial incentives to raise productivity. J. Constr. Div. 1981, 107(4):745-756.
    • (1981) J. Constr. Div. , vol.107 , Issue.4 , pp. 745-756
    • Laufer, A.1    Borcherding, J.D.2
  • 56
    • 79960075291 scopus 로고    scopus 로고
    • Critical factors influencing construction productivity in Thailand
    • Makulsawatudom A., Emsley M., Sinthawanarong K. Critical factors influencing construction productivity in Thailand. J. KMITNB 2004, 14(3):1-6.
    • (2004) J. KMITNB , vol.14 , Issue.3 , pp. 1-6
    • Makulsawatudom, A.1    Emsley, M.2    Sinthawanarong, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.