-
2
-
-
0029416676
-
Construction Productivity: Issues encountered by contractors in Singapore
-
LIM, E. C., and ALUM, J., 1995. Construction Productivity:issues encountered by contractors in Singapore. International Journal of Project Management, 13 (1):51–58.
-
(1995)
International Journal of Project Management
, vol.13
, Issue.1
, pp. 51-58
-
-
Lim, E.C.1
Alum, J.2
-
3
-
-
0031077153
-
Factors influencing craftsmen productivity in Indonesia
-
KAMING, P. F., OLOMOLAIYE, P. O., HOLT, G., and HARRIS, F., 1997. Factors influencing craftsmen productivity in Indonesia. International Journal of Project Management, 15 (1):21–30.
-
(1997)
International Journal of Project Management
, vol.15
, Issue.1
, pp. 21-30
-
-
Kaming, P.F.1
Olomolaiye, P.O.2
Holt, G.3
Harris, F.4
-
4
-
-
0023537362
-
Problems influencing craftsmen productivity in Nigeria
-
OLOMOLAIYE, P., WAHAB, K., and PRICE, A., 1987. Problems influencing craftsmen productivity in Nigeria. Building and Environment, 22 (4):317–323.
-
(1987)
Building and Environment
, vol.22
, Issue.4
, pp. 317-323
-
-
Olomolaiye, P.1
Wahab, K.2
Price, A.3
-
5
-
-
0003857217
-
-
Government of Uganda
-
Uganda Bureau of Statistics. 2005. Statistical abstract, 14Government of Uganda.
-
(2005)
Statistical abstract
, pp. 14
-
-
-
8
-
-
34548574296
-
Improving Uganda's construction industry
-
UNABCEC. 2004. Improving Uganda's construction industry. Construction Review, 15 (10):18–19.
-
(2004)
Construction Review
, vol.15
, Issue.10
, pp. 18-19
-
-
-
10
-
-
0032045222
-
Severity diagnosis of productivity problems - a reliability analysis
-
KAMING, P F., HOLT, G. D., KOMETA, S. T., and OLOMOLAIYE, P., 1998. Severity diagnosis of productivity problems - a reliability analysis. International Journal of Project Management, 16 (2):107–113.
-
(1998)
International Journal of Project Management
, vol.16
, Issue.2
, pp. 107-113
-
-
Kaming, P.F.1
Holt, G.D.2
Kometa, S.T.3
Olomolaiye, P.4
-
11
-
-
4344610295
-
Measuring construction productivity: A practical approach
-
MOTWANI, J., KUMAR, A., and NOVAKOSKI, M., 1995. Measuring construction productivity:a practical approach. Work Study, 44 (8):18–20.
-
(1995)
Work Study
, vol.44
, Issue.8
, pp. 18-20
-
-
Motwani, J.1
Kumar, A.2
Novakoski, M.3
-
12
-
-
34548555267
-
International labour productivity
-
YATES, J. K., and GUHATHAKURTA, S., 1993. International labour productivity. Cost Engineering, 35 (1):15–26.
-
(1993)
Cost Engineering
, vol.35
, Issue.1
, pp. 15-26
-
-
Yates, J.K.1
Guhathakurta, S.2
-
13
-
-
0022729397
-
International labour productivity factors
-
KHEON, E., and BROWN, G., 1986. International labour productivity factors. Journal of Construction Engineering and Management, 112 (2):299–302.
-
(1986)
Journal of Construction Engineering and Management
, vol.112
, Issue.2
, pp. 299-302
-
-
Kheon, E.1
Brown, G.2
-
14
-
-
0017181091
-
Improving productivity in industrial construction
-
BORCHERDING, J. D., 1976. Improving productivity in industrial construction. Journal of the Construction Division, 102 (C04):599–614.
-
(1976)
Journal of the Construction Division
, vol.102
, Issue.C04
, pp. 599-614
-
-
Borcherding, J.D.1
-
15
-
-
25844521253
-
The JIT management system in developing countries
-
POLAT, G., and ARDITI, P., 2005. The JIT management system in developing countries. Construction Management and Economics, 23 (7):697–712.
-
(2005)
Construction Management and Economics
, vol.23
, Issue.7
, pp. 697-712
-
-
Polat, G.1
Arditi, P.2
-
16
-
-
0033690431
-
Project performance control in reconstruction projects
-
MCKIM, R., HEZAGY, T., and ATTALA, M., 2000. Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126 (2):137–141.
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.2
, pp. 137-141
-
-
McKim, R.1
Hezagy, T.2
Attala, M.3
-
17
-
-
0002617199
-
A stakeholder approach to strategic performance measurement
-
ATKINSON, A., WATERHOUSE, J., and WELLS, R., 1997. A stakeholder approach to strategic performance measurement. Sloan Management Review, 38 (3):25–37.
-
(1997)
Sloan Management Review
, vol.38
, Issue.3
, pp. 25-37
-
-
Atkinson, A.1
Waterhouse, J.2
Wells, R.3
-
18
-
-
16444363249
-
Prioritising barriers to successful business process re-engineering (BPR) efforts in Saudi Arabian construction industry
-
ABDUL-HADI, N., AL- SUD AIRI, A., and ALQAHTANI, S., 2005. Prioritising barriers to successful business process re-engineering (BPR) efforts in Saudi Arabian construction industry. Construction Management and Economics, 23 (3):305–315.
-
(2005)
Construction Management and Economics
, vol.23
, Issue.3
, pp. 305-315
-
-
Abdul-Hadi, N.1
Al Sudairi, A.2
Alqahtani, S.3
-
19
-
-
0035454709
-
Construction labour productivity trends, 1970 -1998
-
TEICHOLZ, P., GOODRUM, P. M., and HAAS, C. T. U.S., 2001. Construction labour productivity trends, 1970 -1998. Journal of Construction Engineering and Management, 127 (5):427–429.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.5
, pp. 427-429
-
-
Teicholz, P.1
Goodrum, P.M.2
Haas, C.T.U.3
-
20
-
-
0031516578
-
Sectoral contributions to Total Factor Productivity: Another perspective on the growth showdown
-
CASLER, S. D., and GALLATIN, M. S., 1997. Sectoral contributions to Total Factor Productivity:Another perspective on the growth showdown. Journal of Macroeconomics, 19 (2):381–393.
-
(1997)
Journal of Macroeconomics
, vol.19
, Issue.2
, pp. 381-393
-
-
Casler, S.D.1
Gallatin, M.S.2
-
21
-
-
34548569563
-
A review of improvement methods in manufacturing operations
-
GRUNBERG, T., 2003. A review of improvement methods in manufacturing operations. Work study, 52 (2):89–93.
-
(2003)
Work study
, vol.52
, Issue.2
, pp. 89-93
-
-
Grunberg, T.1
-
24
-
-
2342437438
-
A survey of constraints on Iranian construction operatives’ productivity
-
ZAKERI, M., OLOMOLAIYE, P., HOLT, G., and HARRIS, F., 1996. A survey of constraints on Iranian construction operatives’ productivity. Construction Management and Economics, 14 (5):417–426.
-
(1996)
Construction Management and Economics
, vol.14
, Issue.5
, pp. 417-426
-
-
Zakeri, M.1
Olomolaiye, P.2
Holt, G.3
Harris, F.4
-
26
-
-
85024144443
-
-
Lange J., Mills D., (eds), Lexington: Lexington Books
-
ROSEFIELDE, S., and QUINN MILLS, D., 1979. Is construction technologically stagnant? The construction industry:balance wheel of the economy, Edited by:Lange, J., and Mills, D., 90Lexington:Lexington Books.
-
(1979)
Is construction technologically stagnant? The construction industry: Balance wheel of the economy
, pp. 90
-
-
Rosefielde, S.1
Quinn Mills, D.2
-
30
-
-
0003761866
-
-
2nd ed, London: McGraw-Hill International Editions
-
SIEGEL, S., and CASTELLAN, N. J., 1998. Non-parametric statistics for behavioural sciences., 2nd ed, 59London:McGraw-Hill International Editions.
-
(1998)
Non-parametric statistics for behavioural sciences.
, pp. 59
-
-
Siegel, S.1
Castellan, N.J.2
|