-
1
-
-
0035510283
-
-
" J. Constr. Eng. Manage., (6).
-
AbouRizk, S. M., Knowles, P., and Hermann, U. R. (2001). " Estimating labor production rates for industrial construction activities.." J. Constr. Eng. Manage., 127 (6), 502-511.
-
(2001)
Estimating Labor Production Rates for Industrial Construction Activities
, vol.127
, pp. 502-511
-
-
Abourizk, S.M.1
Knowles, P.2
Hermann, U.R.3
-
2
-
-
1642481713
-
-
AceCAD.., AceCAD software Ltd., Derby, U.K.
-
AceCAD. (2003). StruCAD user manual, AceCAD software Ltd., Derby, U.K.
-
(2003)
StruCAD User Manual
-
-
-
4
-
-
51849163864
-
-
Development of a productivity information management system using data warehousing for construction organizations.", Freeport, Bahamas.
-
Azhar, S., and Ahmed, S. M. (2007). " Development of a productivity information management system using data warehousing for construction organizations.." Proc., 2007 Construction Research Congress, Freeport, Bahamas,.
-
(2007)
Proc., 2007 Construction Research Congress
-
-
Azhar, S.1
Ahmed, S.M.2
-
6
-
-
15844399634
-
-
Construction Industry Institute (CII).. "." Publication No. 156-1, Univ. of Texas at Austin, Austin, Tex.
-
Construction Industry Institute (CII). (2001). " Engineering productivity measurement.." Publication No. 156-1, Univ. of Texas at Austin, Austin, Tex.
-
(2001)
Engineering Productivity Measurement
-
-
-
7
-
-
0344668184
-
-
University of Colorado Press, Boulder, Colo.
-
Diekmann, J. E., and Thrush, K. B. (1986). Project control in design engineering, University of Colorado Press, Boulder, Colo.
-
(1986)
Project Control in Design Engineering
-
-
Diekmann, J.E.1
Thrush, K.B.2
-
8
-
-
0042305926
-
-
Institute for Research in Construction, National Research Council, Ottawa, ON, Canada.
-
Dozzi, S. P., and AbouRizk, S. M. (1993). Productivity in construction, Institute for Research in Construction, National Research Council, Ottawa, ON, Canada.
-
(1993)
Productivity in Construction
-
-
Dozzi, S.P.1
Abourizk, S.M.2
-
9
-
-
32944455521
-
-
J. Constr. Eng. Manage., (3).
-
Ellis, R. D., and Lee, S. (2006). " Measuring project level productivity on transportation projects.." J. Constr. Eng. Manage., 132 (3), 314-320.
-
(2006)
Measuring Project Level Productivity on Transportation Projects
, vol.132
, pp. 314-320
-
-
Ellis, R.D.1
Lee, S.2
-
10
-
-
25444440655
-
-
J. Constr. Eng. Manage., (8).
-
Fayek, A. R., and Oduba, A. (2005). " Predicting industrial construction labor productivity using fuzzy expert systems.." J. Constr. Eng. Manage., 131 (8), 938-941.
-
(2005)
Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems
, vol.131
, pp. 938-941
-
-
Fayek, A.R.1
Oduba, A.2
-
11
-
-
0041304359
-
-
J. Constr. Eng. Manage., (2).
-
Hajjar, D., and AbouRizk, S. M. (2002). " Unified modeling methodology for construction simulation.." J. Constr. Eng. Manage., 128 (2), 174-185.
-
(2002)
Unified Modeling Methodology for Construction Simulation
, vol.128
, pp. 174-185
-
-
Hajjar, D.1
Abourizk, S.M.2
-
12
-
-
2342435307
-
-
Improved project control through advanced data acquisition technologies.", CSCE, Regina, Sask, Canada.
-
Hajjar, D., AbouRizk, S. M., and Hunka, D. (1999). " Improved project control through advanced data acquisition technologies.." Proc., 1999 Construction Specialty Conf., CSCE, Regina, Sask, Canada, 87-96.
-
(1999)
Proc., 1999 Construction Specialty Conf.
, pp. 87-96
-
-
Hajjar, D.1
Abourizk, S.M.2
Hunka, D.3
-
13
-
-
0023363930
-
-
" J. Constr. Eng. Manage., (2).
-
Hendrickson, D., Matinelli, D., and Rehak, D. (1987). " Hierarchical rule-based activity duration estimation.." J. Constr. Eng. Manage., 113 (2), 288-301.
-
(1987)
Hierarchical Rule-based Activity Duration Estimation
, vol.113
, pp. 288-301
-
-
Hendrickson, D.1
Matinelli, D.2
Rehak, D.3
-
14
-
-
0006932701
-
-
Application of neural networks in earthmoving equipment production estimating.", ASCE, New York.
-
Karshenas, S., and Feng, X. (1992). " Application of neural networks in earthmoving equipment production estimating.." Proc., 8th Conf. Computing in Civil Engineering, ASCE, New York, 841-847.
-
(1992)
Proc., 8th Conf. Computing in Civil Engineering
, pp. 841-847
-
-
Karshenas, S.1
Feng, X.2
-
15
-
-
0004312378
-
-
3rd Ed., McGraw-Hill, New York.
-
Law, A. M., and Kelton, W. D. (2000). Simulation modeling and analysis, 3rd Ed., McGraw-Hill, New York.
-
(2000)
Simulation Modeling and Analysis
-
-
Law, A.M.1
Kelton, W.D.2
-
16
-
-
1542263146
-
-
Ph.D. dissertation, Univ. of Alberta, Edmonton, Alta., Canada.
-
Lu, M. (2001). " Productivity studies using advanced ANN models.." Ph.D. dissertation, Univ. of Alberta, Edmonton, Alta., Canada.
-
(2001)
Productivity Studies Using Advanced ANN Models
-
-
Lu, M.1
-
17
-
-
0026381932
-
-
" J. Constr. Eng. Manage., (4).
-
Moselhi, O., Hegazy, T., and Fazio, P. (1991). " Neural networks as tools in construction.." J. Constr. Eng. Manage., 117 (4), 606-625.
-
(1991)
Neural Networks As Tools in Construction
, vol.117
, pp. 606-625
-
-
Moselhi, O.1
Hegazy, T.2
Fazio, P.3
-
18
-
-
4344610295
-
-
" Int. J. Prod. Perform. Manage., (8).
-
Motwani, J., Kumar, A., and Novakoski, M. (1995). " Measuring construction productivity: A practical approach.." Int. J. Prod. Perform. Manage., 44 (8), 18-20.
-
(1995)
Measuring Construction Productivity: A Practical Approach
, vol.44
, pp. 18-20
-
-
Motwani, J.1
Kumar, A.2
Novakoski, M.3
-
19
-
-
33645713141
-
-
NeuroShell 2.., Ward System GrouInc., Frederick, Md.
-
NeuroShell 2. (2000). NeuroShell 2 user's manual, Ward System Group Inc., Frederick, Md.
-
(2000)
NeuroShell 2 User's Manual
-
-
-
20
-
-
23044480215
-
-
" J. Constr. Eng. Manage., (7).
-
Park, H., Thomas, S. R., and Tucker, R. L. (2005). " Benchmarking of construction productivity.." J. Constr. Eng. Manage., 131 (7), 772-778.
-
(2005)
Benchmarking of Construction Productivity
, vol.131
, pp. 772-778
-
-
Park, H.1
Thomas, S.R.2
Tucker, R.L.3
-
21
-
-
0001362287
-
-
J. Constr. Eng. Manage., (4).
-
Portas, J., and AbouRizk, S. M. (1997) " Neural network model for estimating construction productivity.." J. Constr. Eng. Manage., 123 (4), 399-410.
-
(1997)
Neural Network Model for Estimating Construction Productivity
, vol.123
, pp. 399-410
-
-
Portas, J.1
Abourizk, S.M.2
-
22
-
-
51849099648
-
-
RS Means.. "." 〈〉 (Aug. 12, 2007).
-
RS Means. (2007). " About RS Means.." 〈 http://www.rsmeans.com/index.asp 〉 (Aug. 12, 2007).
-
(2007)
About RS Means
-
-
-
23
-
-
0027555168
-
-
J. Constr. Eng. Manage., (1).
-
Sander, S. R., and Thomas, H. R. (1993). " Masonry productivity forecasting model.." J. Constr. Eng. Manage., 119 (1), 163-179.
-
(1993)
Masonry Productivity Forecasting Model
, vol.119
, pp. 163-179
-
-
Sander, S.R.1
Thomas, H.R.2
-
25
-
-
33747342090
-
-
Ph.D. dissertation, Univ. of Alberta, Edmonton, Alta., Canada.
-
Song, L. (2004). " Productivity modeling of steel fabrication.." Ph.D. dissertation, Univ. of Alberta, Edmonton, Alta., Canada.
-
(2004)
Productivity Modeling of Steel Fabrication
-
-
Song, L.1
-
26
-
-
14544298864
-
-
J. Constr. Eng. Manage., (3).
-
Song, L., and AbouRizk, S. M. (2005). " Quantifying engineering project scope for productivity modeling.." J. Constr. Eng. Manage., 131 (3), 360-367.
-
(2005)
Quantifying Engineering Project Scope for Productivity Modeling
, vol.131
, pp. 360-367
-
-
Song, L.1
Abourizk, S.M.2
-
27
-
-
33747342143
-
-
J. Comput. Civ. Eng., (5).
-
Song, L., and AbouRizk, S. M. (2006). " Virtual shop model for experimental planning of steel fabrication projects.." J. Comput. Civ. Eng., 20 (5), 308-316.
-
(2006)
Virtual Shop Model for Experimental Planning of Steel Fabrication Projects
, vol.20
, pp. 308-316
-
-
Song, L.1
Abourizk, S.M.2
-
28
-
-
0032206731
-
-
J. Constr. Eng. Manage., (6).
-
Sonmez, R., and Rowings, J. E. (1998). " Construction labor productivity modeling with neural networks.." J. Constr. Eng. Manage., 124 (6), 498-504.
-
(1998)
Construction Labor Productivity Modeling with Neural Networks
, vol.124
, pp. 498-504
-
-
Sonmez, R.1
Rowings, J.E.2
-
29
-
-
0028396033
-
-
J. Constr. Eng. Manage., (1).
-
Thomas, H. R., and Sakarcan, A. S. (1994). " Forecasting labor productivity using factor model.." J. Constr. Eng. Manage., 120 (1), 228-239.
-
(1994)
Forecasting Labor Productivity Using Factor Model
, vol.120
, pp. 228-239
-
-
Thomas, H.R.1
Sakarcan, A.S.2
-
30
-
-
13944267542
-
-
J. Constr. Eng. Manage., (3).
-
Tisher, T. E., and Kuprenas, J. A. (2003). " Bridge falsework productivity-Measurement and influences.." J. Constr. Eng. Manage., 129 (3), 243-250.
-
(2003)
Bridge Falsework Productivity-Measurement and Influences
, vol.129
, pp. 243-250
-
-
Tisher, T.E.1
Kuprenas, J.A.2
-
31
-
-
0029755887
-
-
Simul. Modell. Pract. Theory, (1996).
-
Wales, R. J., and AbouRizk, S. M. (1996). " An integrated simulation model for construction.." Simul. Modell. Pract. Theory, 3 (1996), 401-420.
-
(1996)
An Integrated Simulation Model for Construction
, vol.3
, pp. 401-420
-
-
Wales, R.J.1
Abourizk, S.M.2
-
32
-
-
20444495592
-
-
J. Constr. Eng. Manage., (6).
-
Zayed, T. M., and Halpin, D. W. (2005). " Pile construction productivity assessment.." J. Constr. Eng. Manage., 131 (6), 705-714.
-
(2005)
Pile Construction Productivity Assessment
, vol.131
, pp. 705-714
-
-
Zayed, T.M.1
Halpin, D.W.2
|