Project completion time and cost prediction using change point analysis

Author keywords

At completion cost; Change point analysis; Cost and schedule behavior; Earned value management; Schedule prediction

Indexed keywords

BUDGET CONTROL; FORECASTING; VALUE ENGINEERING;

EID: 84939522643     PISSN: 0742597X     EISSN: 19435479     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000329     Document Type: Article
Times cited : (23)

References (36)
  • 1
    • 77949768133 scopus 로고    scopus 로고
    • Statistical analysis on the cost and duration of public building projects
    • Abu Hammad, A. A., Alhaj Ali, S. M., Sweis, G. J., and, Sweis, R. J. (2010). " Statistical analysis on the cost and duration of public building projects." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2010)26:2(105), 105-112. JMENEA 0742-597X
    • (2010) J. Manage. Eng. , pp. 105-112
    • Abu Hammad, A.A.1    Alhaj Ali, S.M.2    Sweis, G.J.3    Sweis, R.J.4
  • 2
    • 84874288661 scopus 로고    scopus 로고
    • Monitoring project duration and cost in a construction project by applying statistical quality control charts
    • Aliverdi, R., Naeni, L. M., and, Salehipour, A. (2013). " Monitoring project duration and cost in a construction project by applying statistical quality control charts." Int. J. Project Manage., 31 (3), 411-423. 10.1016/j.ijproman.2012.08.005 IPMAEL
    • (2013) Int. J. Project Manage. , vol.31 , Issue.3 , pp. 411-423
    • Aliverdi, R.1    Naeni, L.M.2    Salehipour, A.3
  • 3
    • 84863690195 scopus 로고    scopus 로고
    • Change point estimation methods for control chart postsignal diagnostics: A literature review
    • Amiri, A., and, Allahyari, S. (2012). " Change point estimation methods for control chart postsignal diagnostics: A literature review." Qual. Reliab. Eng. Int., 28 (7), 673-685. QREIE5 0748-8017
    • (2012) Qual. Reliab. Eng. Int. , vol.28 , Issue.7 , pp. 673-685
    • Amiri, A.1    Allahyari, S.2
  • 4
    • 33645957411 scopus 로고    scopus 로고
    • Earned value project management, method and extensions
    • Anbari, F. T. (2003). " Earned value project management, method and extensions." Project Manage. J., 34 (4), 12-23. 1938-9507
    • (2003) Project Manage. J. , vol.34 , Issue.4 , pp. 12-23
    • Anbari, F.T.1
  • 5
    • 77953612235 scopus 로고    scopus 로고
    • Designing a control mechanism using earned value analysis: An application to production environment
    • Bagherpour, M., Zareei, A., Noori, S., and, Heydari, M. (2010). " Designing a control mechanism using earned value analysis: An application to production environment." Int. J. Adv. Manuf. Technol., 49 (5-8), 419-429. 10.1007/s00170-009-2406-z IJATEA 1433-3051
    • (2010) Int. J. Adv. Manuf. Technol. , vol.49 , Issue.58 , pp. 419-429
    • Bagherpour, M.1    Zareei, A.2    Noori, S.3    Heydari, M.4
  • 6
    • 84894462583 scopus 로고    scopus 로고
    • Improving forecasting accuracy of project earned value metrics: Linear modeling approach
    • Chen, H. L. (2014). " Improving forecasting accuracy of project earned value metrics: Linear modeling approach." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000187, 135-145. JMENEA 0742-597X
    • (2014) J. Manage. Eng. , pp. 135-145
    • Chen, H.L.1
  • 8
    • 32644472456 scopus 로고    scopus 로고
    • Designing project management: A scientific notation and an improved formalism for earned value calculations
    • Cioffi, D. F. (2006). " Designing project management: A scientific notation and an improved formalism for earned value calculations." Int. J. Project Manage., 24 (2), 136-144. 10.1016/j.ijproman.2005.07.003 IPMAEL
    • (2006) Int. J. Project Manage. , vol.24 , Issue.2 , pp. 136-144
    • Cioffi, D.F.1
  • 9
    • 0038721043 scopus 로고    scopus 로고
    • A model for effective implementation of earned value management methodology
    • EunHong, K., Wells, W. G., and, Duffey, M. R. (2003). " A model for effective implementation of earned value management methodology." Int. J. Project Manage., 21 (5), 375-382. 10.1016/S0263-7863(02)00049-2 IPMAEL
    • (2003) Int. J. Project Manage. , vol.21 , Issue.5 , pp. 375-382
    • EunHong, K.1    Wells, W.G.2    Duffey, M.R.3
  • 13
    • 84873390024 scopus 로고    scopus 로고
    • Proposed system for measuring project performance using process-based key performance indicators
    • Haponava, T., and, Al-Jibouri, S. (2011). " Proposed system for measuring project performance using process-based key performance indicators." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000078, 140-149. JMENEA 0742-597X
    • (2011) J. Manage. Eng. , pp. 140-149
    • Haponava, T.1    Al-Jibouri, S.2
  • 14
    • 33646010711 scopus 로고    scopus 로고
    • Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data
    • Henderson, K. (2003). " Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data." Meas. News, 3 (2), 13-23.
    • (2003) Meas. News , vol.3 , Issue.2 , pp. 13-23
    • Henderson, K.1
  • 15
    • 22744440305 scopus 로고    scopus 로고
    • Further developments in earned schedule
    • Henderson, K. (2004). " Further developments in earned schedule." Meas. News, 1 (1), 15-22.
    • (2004) Meas. News , vol.1 , Issue.1 , pp. 15-22
    • Henderson, K.1
  • 16
    • 84873354811 scopus 로고    scopus 로고
    • Critical analysis of partnering research trend in construction journals
    • Hong, Y., Chan, D. W., Chan, A. P., and, Yeung, J. F. (2011). " Critical analysis of partnering research trend in construction journals." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000084, 82-95. JMENEA 0742-597X
    • (2011) J. Manage. Eng. , pp. 82-95
    • Hong, Y.1    Chan, D.W.2    Chan, A.P.3    Yeung, J.F.4
  • 17
    • 65249138825 scopus 로고    scopus 로고
    • Forecasting project schedule completion with earned value metrics
    • Jacob, D. (2003). " Forecasting project schedule completion with earned value metrics." Meas. News, 1 (1), 7-9.
    • (2003) Meas. News , vol.1 , Issue.1 , pp. 7-9
    • Jacob, D.1
  • 18
    • 77956859682 scopus 로고    scopus 로고
    • Management thinking in the earned value method system and the last planner system
    • Kim, Y.-W., and, Ballard, G. (2010). " Management thinking in the earned value method system and the last planner system." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000026, 223-228. JMENEA 0742-597X
    • (2010) J. Manage. Eng. , pp. 223-228
    • Kim, Y.-W.1    Ballard, G.2
  • 19
    • 33745202924 scopus 로고    scopus 로고
    • A study of the normality of earned value management indicators
    • Lipke, W. (2002). " A study of the normality of earned value management indicators." Meas. News, 1-16.
    • (2002) Meas. News , pp. 1-16
    • Lipke, W.1
  • 20
    • 22744437020 scopus 로고    scopus 로고
    • Schedule is different
    • Lipke, W. (2003). " Schedule is different." Meas. News, 31 (4), 31-34.
    • (2003) Meas. News , vol.31 , Issue.4 , pp. 31-34
    • Lipke, W.1
  • 21
    • 84999252923 scopus 로고    scopus 로고
    • Further study of the normality of CPI and SPI(t)
    • Lipke, W. (2011). " Further study of the normality of CPI and SPI(t)." PM World Today, 13 (10), 1-8.
    • (2011) PM World Today , vol.13 , Issue.10 , pp. 1-8
    • Lipke, W.1
  • 22
    • 84939494837 scopus 로고    scopus 로고
    • Further study of the normality of CPI and SPI(t)
    • Lipke, W. (2012). " Further study of the normality of CPI and SPI(t)." Meas. News, 2, 16-18.
    • (2012) Meas. News , vol.2 , pp. 16-18
    • Lipke, W.1
  • 24
    • 64449085007 scopus 로고    scopus 로고
    • Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes
    • Lipke, W. H., Zwikael, O., Henderson, K., and, Anbari, F. (2009). " Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes." Int. J. Project Manage., 27 (4), 400-407. 10.1016/j.ijproman.2008.02.009 IPMAEL
    • (2009) Int. J. Project Manage. , vol.27 , Issue.4 , pp. 400-407
    • Lipke, W.H.1    Zwikael, O.2    Henderson, K.3    Anbari, F.4
  • 25
    • 84873585671 scopus 로고    scopus 로고
    • Fuzzy earned value management using L-R fuzzy numbers
    • Mortaji, S., Bagherpour, M., and, Noori, S. (2013). " Fuzzy earned value management using L-R fuzzy numbers." J. Intell. Fuzzy Syst., 24 (2), 323-332. JIFSE2 1064-1246
    • (2013) J. Intell. Fuzzy Syst. , vol.24 , Issue.2 , pp. 323-332
    • Mortaji, S.1    Bagherpour, M.2    Noori, S.3
  • 26
    • 80054784230 scopus 로고    scopus 로고
    • Improving construction management of an educational center by applying earned value technique
    • Naderpour, A., and, Mofid, M. (2011). " Improving construction management of an educational center by applying earned value technique." Procedia Eng., 14, 1945-1952. 10.1016/j.proeng.2011.07.244 PERNBE 1877-7058
    • (2011) Procedia Eng. , vol.14 , pp. 1945-1952
    • Naderpour, A.1    Mofid, M.2
  • 27
    • 0026943503 scopus 로고
    • A comparison of control charts from the viewpoint of change-point estimation
    • Nishina, K. (1992). " A comparison of control charts from the viewpoint of change-point estimation." Qual. Reliab. Eng. Int., 8 (6), 537-541. 10.1002/(ISSN)1099-1638 QREIE5 0748-8017
    • (1992) Qual. Reliab. Eng. Int. , vol.8 , Issue.6 , pp. 537-541
    • Nishina, K.1
  • 28
    • 0002916530 scopus 로고
    • Continuous inspection scheme
    • Page, E. S. (1954). " Continuous inspection scheme." Biometrika, 41 (1-2), 100-115. 10.1093/biomet/41.1-2.100 BIOKAX 0006-3444
    • (1954) Biometrika , vol.41 , Issue.12 , pp. 100-115
    • Page, E.S.1
  • 29
    • 58049139009 scopus 로고    scopus 로고
    • PMI. 5th Ed. Project Management Institute, Newtown Square, PA.
    • PMI. (2013). A guide for project management body of knowledge, 5th Ed., Project Management Institute, Newtown Square, PA.
    • (2013) A Guide for Project Management Body of Knowledge
  • 30
    • 33645967441 scopus 로고    scopus 로고
    • A comparison of different project duration forecasting methods using earned value metrics
    • Vandevoorde, S., and, Vanhoucke, M. (2006). " A comparison of different project duration forecasting methods using earned value metrics." Int. J. Project Manage., 24 (4), 289-302. 10.1016/j.ijproman.2005.10.004 IPMAEL
    • (2006) Int. J. Project Manage. , vol.24 , Issue.4 , pp. 289-302
    • Vandevoorde, S.1    Vanhoucke, M.2
  • 31
    • 35448944883 scopus 로고    scopus 로고
    • A simulation and evaluation of earned value metrics to forecast the project duration
    • Vanhoucke, M. (2007). " A simulation and evaluation of earned value metrics to forecast the project duration." J. Oper. Res. Soc., 58 (10), 1361-1374. 10.1057/palgrave.jors.2602296 JORSDZ
    • (2007) J. Oper. Res. Soc. , vol.58 , Issue.10 , pp. 1361-1374
    • Vanhoucke, M.1
  • 33
    • 84655167747 scopus 로고    scopus 로고
    • Measuring the efficiency of project control using fictitious and empirical project data
    • Vanhoucke, M. (2012 a). " Measuring the efficiency of project control using fictitious and empirical project data." Int. J. Project Manage., 30 (2), 252-263. 10.1016/j.ijproman.2011.05.006 IPMAEL
    • (2012) Int. J. Project Manage. , vol.30 , Issue.2 , pp. 252-263
    • Vanhoucke, M.1
  • 35
    • 80053050415 scopus 로고    scopus 로고
    • A time-dependent earned value model for software projects
    • Warburton, R. D. (2011). " A time-dependent earned value model for software projects." Int. J. Project Manage., 29 (8), 1082-1090. 10.1016/j.ijproman.2011.02.008 IPMAEL
    • (2011) Int. J. Project Manage. , vol.29 , Issue.8 , pp. 1082-1090
    • Warburton, R.D.1
  • 36
    • 84872692063 scopus 로고    scopus 로고
    • Stochastic forecast of construction cost index using a co-integrated vector auto regression model
    • Xu, J.-w., and, Moon, S. (2011). " Stochastic forecast of construction cost index using a co-integrated vector auto regression model." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000112, 10-18. JMENEA 0742-597X
    • (2011) J. Manage. Eng. , pp. 10-18
    • Xu, J.-W.1    Moon, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.