-
1
-
-
77949768133
-
Statistical analysis on the cost and duration of public building projects
-
Abu Hammad, A. A., Alhaj Ali, S. M., Sweis, G. J., and, Sweis, R. J. (2010). " Statistical analysis on the cost and duration of public building projects." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2010)26:2(105), 105-112. JMENEA 0742-597X
-
(2010)
J. Manage. Eng.
, pp. 105-112
-
-
Abu Hammad, A.A.1
Alhaj Ali, S.M.2
Sweis, G.J.3
Sweis, R.J.4
-
2
-
-
84874288661
-
Monitoring project duration and cost in a construction project by applying statistical quality control charts
-
Aliverdi, R., Naeni, L. M., and, Salehipour, A. (2013). " Monitoring project duration and cost in a construction project by applying statistical quality control charts." Int. J. Project Manage., 31 (3), 411-423. 10.1016/j.ijproman.2012.08.005 IPMAEL
-
(2013)
Int. J. Project Manage.
, vol.31
, Issue.3
, pp. 411-423
-
-
Aliverdi, R.1
Naeni, L.M.2
Salehipour, A.3
-
3
-
-
84863690195
-
Change point estimation methods for control chart postsignal diagnostics: A literature review
-
Amiri, A., and, Allahyari, S. (2012). " Change point estimation methods for control chart postsignal diagnostics: A literature review." Qual. Reliab. Eng. Int., 28 (7), 673-685. QREIE5 0748-8017
-
(2012)
Qual. Reliab. Eng. Int.
, vol.28
, Issue.7
, pp. 673-685
-
-
Amiri, A.1
Allahyari, S.2
-
4
-
-
33645957411
-
Earned value project management, method and extensions
-
Anbari, F. T. (2003). " Earned value project management, method and extensions." Project Manage. J., 34 (4), 12-23. 1938-9507
-
(2003)
Project Manage. J.
, vol.34
, Issue.4
, pp. 12-23
-
-
Anbari, F.T.1
-
5
-
-
77953612235
-
Designing a control mechanism using earned value analysis: An application to production environment
-
Bagherpour, M., Zareei, A., Noori, S., and, Heydari, M. (2010). " Designing a control mechanism using earned value analysis: An application to production environment." Int. J. Adv. Manuf. Technol., 49 (5-8), 419-429. 10.1007/s00170-009-2406-z IJATEA 1433-3051
-
(2010)
Int. J. Adv. Manuf. Technol.
, vol.49
, Issue.58
, pp. 419-429
-
-
Bagherpour, M.1
Zareei, A.2
Noori, S.3
Heydari, M.4
-
6
-
-
84894462583
-
Improving forecasting accuracy of project earned value metrics: Linear modeling approach
-
Chen, H. L. (2014). " Improving forecasting accuracy of project earned value metrics: Linear modeling approach." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000187, 135-145. JMENEA 0742-597X
-
(2014)
J. Manage. Eng.
, pp. 135-145
-
-
Chen, H.L.1
-
7
-
-
0004006791
-
-
Birkhäuser Boston, c/o Springer Science+Business Media LLC, New York.
-
Chen, J., and, Gupta, A. K. (2012). Parametric statistical change point analysis: With applications to genetics, medicine and finance, Birkhäuser Boston, c/o Springer Science+Business Media LLC, New York.
-
(2012)
Parametric Statistical Change Point Analysis: With Applications to Genetics, Medicine and Finance
-
-
Chen, J.1
Gupta, A.K.2
-
8
-
-
32644472456
-
Designing project management: A scientific notation and an improved formalism for earned value calculations
-
Cioffi, D. F. (2006). " Designing project management: A scientific notation and an improved formalism for earned value calculations." Int. J. Project Manage., 24 (2), 136-144. 10.1016/j.ijproman.2005.07.003 IPMAEL
-
(2006)
Int. J. Project Manage.
, vol.24
, Issue.2
, pp. 136-144
-
-
Cioffi, D.F.1
-
9
-
-
0038721043
-
A model for effective implementation of earned value management methodology
-
EunHong, K., Wells, W. G., and, Duffey, M. R. (2003). " A model for effective implementation of earned value management methodology." Int. J. Project Manage., 21 (5), 375-382. 10.1016/S0263-7863(02)00049-2 IPMAEL
-
(2003)
Int. J. Project Manage.
, vol.21
, Issue.5
, pp. 375-382
-
-
EunHong, K.1
Wells, W.G.2
Duffey, M.R.3
-
10
-
-
0037521910
-
-
Project Management Institute, Newtown Square, PA.
-
Fleming, Q. W., and, Koppelman, J. M. (2010). Earned value project management, Project Management Institute, Newtown Square, PA.
-
(2010)
Earned Value Project Management
-
-
Fleming, Q.W.1
Koppelman, J.M.2
-
13
-
-
84873390024
-
Proposed system for measuring project performance using process-based key performance indicators
-
Haponava, T., and, Al-Jibouri, S. (2011). " Proposed system for measuring project performance using process-based key performance indicators." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000078, 140-149. JMENEA 0742-597X
-
(2011)
J. Manage. Eng.
, pp. 140-149
-
-
Haponava, T.1
Al-Jibouri, S.2
-
14
-
-
33646010711
-
Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data
-
Henderson, K. (2003). " Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data." Meas. News, 3 (2), 13-23.
-
(2003)
Meas. News
, vol.3
, Issue.2
, pp. 13-23
-
-
Henderson, K.1
-
15
-
-
22744440305
-
Further developments in earned schedule
-
Henderson, K. (2004). " Further developments in earned schedule." Meas. News, 1 (1), 15-22.
-
(2004)
Meas. News
, vol.1
, Issue.1
, pp. 15-22
-
-
Henderson, K.1
-
16
-
-
84873354811
-
Critical analysis of partnering research trend in construction journals
-
Hong, Y., Chan, D. W., Chan, A. P., and, Yeung, J. F. (2011). " Critical analysis of partnering research trend in construction journals." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000084, 82-95. JMENEA 0742-597X
-
(2011)
J. Manage. Eng.
, pp. 82-95
-
-
Hong, Y.1
Chan, D.W.2
Chan, A.P.3
Yeung, J.F.4
-
17
-
-
65249138825
-
Forecasting project schedule completion with earned value metrics
-
Jacob, D. (2003). " Forecasting project schedule completion with earned value metrics." Meas. News, 1 (1), 7-9.
-
(2003)
Meas. News
, vol.1
, Issue.1
, pp. 7-9
-
-
Jacob, D.1
-
18
-
-
77956859682
-
Management thinking in the earned value method system and the last planner system
-
Kim, Y.-W., and, Ballard, G. (2010). " Management thinking in the earned value method system and the last planner system." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000026, 223-228. JMENEA 0742-597X
-
(2010)
J. Manage. Eng.
, pp. 223-228
-
-
Kim, Y.-W.1
Ballard, G.2
-
19
-
-
33745202924
-
A study of the normality of earned value management indicators
-
Lipke, W. (2002). " A study of the normality of earned value management indicators." Meas. News, 1-16.
-
(2002)
Meas. News
, pp. 1-16
-
-
Lipke, W.1
-
20
-
-
22744437020
-
Schedule is different
-
Lipke, W. (2003). " Schedule is different." Meas. News, 31 (4), 31-34.
-
(2003)
Meas. News
, vol.31
, Issue.4
, pp. 31-34
-
-
Lipke, W.1
-
21
-
-
84999252923
-
Further study of the normality of CPI and SPI(t)
-
Lipke, W. (2011). " Further study of the normality of CPI and SPI(t)." PM World Today, 13 (10), 1-8.
-
(2011)
PM World Today
, vol.13
, Issue.10
, pp. 1-8
-
-
Lipke, W.1
-
22
-
-
84939494837
-
Further study of the normality of CPI and SPI(t)
-
Lipke, W. (2012). " Further study of the normality of CPI and SPI(t)." Meas. News, 2, 16-18.
-
(2012)
Meas. News
, vol.2
, pp. 16-18
-
-
Lipke, W.1
-
24
-
-
64449085007
-
Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes
-
Lipke, W. H., Zwikael, O., Henderson, K., and, Anbari, F. (2009). " Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes." Int. J. Project Manage., 27 (4), 400-407. 10.1016/j.ijproman.2008.02.009 IPMAEL
-
(2009)
Int. J. Project Manage.
, vol.27
, Issue.4
, pp. 400-407
-
-
Lipke, W.H.1
Zwikael, O.2
Henderson, K.3
Anbari, F.4
-
25
-
-
84873585671
-
Fuzzy earned value management using L-R fuzzy numbers
-
Mortaji, S., Bagherpour, M., and, Noori, S. (2013). " Fuzzy earned value management using L-R fuzzy numbers." J. Intell. Fuzzy Syst., 24 (2), 323-332. JIFSE2 1064-1246
-
(2013)
J. Intell. Fuzzy Syst.
, vol.24
, Issue.2
, pp. 323-332
-
-
Mortaji, S.1
Bagherpour, M.2
Noori, S.3
-
26
-
-
80054784230
-
Improving construction management of an educational center by applying earned value technique
-
Naderpour, A., and, Mofid, M. (2011). " Improving construction management of an educational center by applying earned value technique." Procedia Eng., 14, 1945-1952. 10.1016/j.proeng.2011.07.244 PERNBE 1877-7058
-
(2011)
Procedia Eng.
, vol.14
, pp. 1945-1952
-
-
Naderpour, A.1
Mofid, M.2
-
27
-
-
0026943503
-
A comparison of control charts from the viewpoint of change-point estimation
-
Nishina, K. (1992). " A comparison of control charts from the viewpoint of change-point estimation." Qual. Reliab. Eng. Int., 8 (6), 537-541. 10.1002/(ISSN)1099-1638 QREIE5 0748-8017
-
(1992)
Qual. Reliab. Eng. Int.
, vol.8
, Issue.6
, pp. 537-541
-
-
Nishina, K.1
-
28
-
-
0002916530
-
Continuous inspection scheme
-
Page, E. S. (1954). " Continuous inspection scheme." Biometrika, 41 (1-2), 100-115. 10.1093/biomet/41.1-2.100 BIOKAX 0006-3444
-
(1954)
Biometrika
, vol.41
, Issue.12
, pp. 100-115
-
-
Page, E.S.1
-
29
-
-
58049139009
-
-
PMI. 5th Ed. Project Management Institute, Newtown Square, PA.
-
PMI. (2013). A guide for project management body of knowledge, 5th Ed., Project Management Institute, Newtown Square, PA.
-
(2013)
A Guide for Project Management Body of Knowledge
-
-
-
30
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
Vandevoorde, S., and, Vanhoucke, M. (2006). " A comparison of different project duration forecasting methods using earned value metrics." Int. J. Project Manage., 24 (4), 289-302. 10.1016/j.ijproman.2005.10.004 IPMAEL
-
(2006)
Int. J. Project Manage.
, vol.24
, Issue.4
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
31
-
-
35448944883
-
A simulation and evaluation of earned value metrics to forecast the project duration
-
Vanhoucke, M. (2007). " A simulation and evaluation of earned value metrics to forecast the project duration." J. Oper. Res. Soc., 58 (10), 1361-1374. 10.1057/palgrave.jors.2602296 JORSDZ
-
(2007)
J. Oper. Res. Soc.
, vol.58
, Issue.10
, pp. 1361-1374
-
-
Vanhoucke, M.1
-
33
-
-
84655167747
-
Measuring the efficiency of project control using fictitious and empirical project data
-
Vanhoucke, M. (2012 a). " Measuring the efficiency of project control using fictitious and empirical project data." Int. J. Project Manage., 30 (2), 252-263. 10.1016/j.ijproman.2011.05.006 IPMAEL
-
(2012)
Int. J. Project Manage.
, vol.30
, Issue.2
, pp. 252-263
-
-
Vanhoucke, M.1
-
35
-
-
80053050415
-
A time-dependent earned value model for software projects
-
Warburton, R. D. (2011). " A time-dependent earned value model for software projects." Int. J. Project Manage., 29 (8), 1082-1090. 10.1016/j.ijproman.2011.02.008 IPMAEL
-
(2011)
Int. J. Project Manage.
, vol.29
, Issue.8
, pp. 1082-1090
-
-
Warburton, R.D.1
-
36
-
-
84872692063
-
Stochastic forecast of construction cost index using a co-integrated vector auto regression model
-
Xu, J.-w., and, Moon, S. (2011). " Stochastic forecast of construction cost index using a co-integrated vector auto regression model." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000112, 10-18. JMENEA 0742-597X
-
(2011)
J. Manage. Eng.
, pp. 10-18
-
-
Xu, J.-W.1
Moon, S.2
|