2
-
-
11644288742
-
Shielding production: Essential step in production control
-
JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1998)124:1(11)
-
Ballard, G., and Howell, G. (1998). " Shielding production: Essential step in production control.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (1), 11-17. 10.1061/(ASCE)0733-9364(1998)124:1(11)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
3
-
-
77956842343
-
-
Research Re RT-234, Construction Industry Institute, Austin, TX
-
Ballard, G., Kim, Y., Jang, J., and Liu, M. (2007). " Implementing lean at the project level RR-234.." Research Rep. RT-234, Construction Industry Institute, Austin, TX.
-
(2007)
Implementing Lean at the Project Level RR-234
-
-
Ballard, G.1
Kim, Y.2
Jang, J.3
Liu, M.4
-
6
-
-
77956829457
-
Applying the last planner control system to a construction project: A case study in Quito, Equador
-
IGLC, Gramado, Brazil
-
Fiallo, C., and Revelo, V. (2002). " Applying the last planner control system to a construction project: A case study in Quito, Equador.." Proc., 10th Annual Conf. of the International Group for Lean Construction, IGLC, Gramado, Brazil.
-
(2002)
Proc., 10th Annual Conf. of the International Group for Lean Construction
-
-
Fiallo, C.1
Revelo, V.2
-
8
-
-
0001247217
-
What is lean construction?
-
I. D. Tommelein, ed., IGLC, Berkeley, CA
-
Howell, G. (1999). " What is lean construction?." Proc., 7th Annual Conf. of the Int. Group for Lean Construction, I. D. Tommelein, ed., IGLC, Berkeley, CA, 1-10.
-
(1999)
Proc., 7th Annual Conf. of the Int. Group for Lean Construction
, pp. 1-10
-
-
Howell, G.1
-
9
-
-
77956820331
-
Can project controls do its job?
-
IGLC, Birmingham, U.K
-
Howell, G., and Ballard, G. (1996). " Can project controls do its job?." Proc., 4th Annual Conf. of the International Group for Lean Construction, IGLC, Birmingham, U.K.
-
(1996)
Proc., 4th Annual Conf. of the International Group for Lean Construction
-
-
Howell, G.1
Ballard, G.2
-
10
-
-
77956803468
-
Use of percent of constraint removal to measure the make-ready process
-
IGLC, East Lansing, MI
-
Jang, J., and Kim, Y. (2007). " Use of percent of constraint removal to measure the make-ready process.." Proc., 15th Annual Conf. of the International Group for Lean Construction, IGLC, East Lansing, MI, 529-538.
-
(2007)
Proc., 15th Annual Conf. of the International Group for Lean Construction
, pp. 529-538
-
-
Jang, J.1
Kim, Y.2
-
11
-
-
77956829019
-
An experience of introducing last planner into a UK construction project
-
Johansen and Porter.. ".", IGLC, Blacksburg, VA
-
Johansen and Porter. (2003). " An experience of introducing last planner into a UK construction project.." Proc., 11th Annual Conf. of the International Group for Lean Construction, IGLC, Blacksburg, VA.
-
(2003)
Proc., 11th Annual Conf. of the International Group for Lean Construction
-
-
-
15
-
-
77956801364
-
Is earned value method an enemy of work flow?
-
IGLC, Brighton, U.K
-
Kim, Y., and Ballard, G. (2000). " Is earned value method an enemy of work flow?." Proc., 8th Annual Conf. of the International Group for Lean Construction, IGLC, Brighton, U.K.
-
(2000)
Proc., 8th Annual Conf. of the International Group for Lean Construction
-
-
Kim, Y.1
Ballard, G.2
-
16
-
-
29044447976
-
Customer-earned-value method
-
ZZZZZZ 1609-9451, 10.1142/S1609945102000096
-
Kim, Y., and Ballard, G. (2002). " Customer-earned-value method.." J. Constr. Res. ZZZZZZ 1609-9451, 3 (1), 55-66. 10.1142/S1609945102000096
-
(2002)
J. Constr. Res.
, vol.3
, Issue.1
, pp. 55-66
-
-
Kim, Y.1
Ballard, G.2
-
17
-
-
78651586239
-
Case study: An application of last planner to heavy civil construction in Korea
-
IGLC, Sydney, Australia
-
Kim, Y., and Jang, J. (2005). " Case study: An application of last planner to heavy civil construction in Korea.." Proc., 13th Annual Conf. of the International Group for Lean Construction, IGLC, Sydney, Australia.
-
(2005)
Proc., 13th Annual Conf. of the International Group for Lean Construction
-
-
Kim, Y.1
Jang, J.2
-
18
-
-
77956828599
-
Constraint analysis using organizational hierarchy
-
IGLC, Santiago, Chile
-
Kim, Y., and Jang, J. (2006). " Constraint analysis using organizational hierarchy.." Proc., 14th Annual Conf. of the International Group for Lean Construction, IGLC, Santiago, Chile.
-
(2006)
Proc., 14th Annual Conf. of the International Group for Lean Construction
-
-
Kim, Y.1
Jang, J.2
-
19
-
-
0000718046
-
Management of production in construction: Theoretical view
-
I. D. Tommelein, ed., IGLC, Berkeley, CA
-
Koskela, L. (1999). " Management of production in construction: Theoretical view.." Proc., 7th Annual Conf. of the International Group for Lean Construction, I. D. Tommelein, ed., IGLC, Berkeley, CA, 241-252.
-
(1999)
Proc., 7th Annual Conf. of the International Group for Lean Construction
, pp. 241-252
-
-
Koskela, L.1
-
21
-
-
12244286007
-
The theory of project management: Explanation to novel methods
-
IGLC, Gramado, Brazil
-
Koskela, L., and Howell, G. (2002). " The theory of project management: Explanation to novel methods.." Proc., 12th Annual Conf. of the International Group for Lean Construction, IGLC, Gramado, Brazil.
-
(2002)
Proc., 12th Annual Conf. of the International Group for Lean Construction
-
-
Koskela, L.1
Howell, G.2
-
22
-
-
12344306945
-
The prevalent theory of construction is a hindrance for innovation
-
IGLC, Brighton, U.K
-
Koskela, L., and Vrijhoef, R. (2000). " The prevalent theory of construction is a hindrance for innovation.." Proc., 8th Annual Conf. of the International Group for Lean Construction, IGLC, Brighton, U.K.
-
(2000)
Proc., 8th Annual Conf. of the International Group for Lean Construction
-
-
Koskela, L.1
Vrijhoef, R.2
-
24
-
-
69949083096
-
Linguistic action: Contributing to the theory of lean construction
-
IGLC, Blacksburg, VA
-
Macomber, H., and Howell, G. (2003). " Linguistic action: Contributing to the theory of lean construction.." Proc., 11th Annual Conf. of the International Group for Lean Construction, IGLC, Blacksburg, VA.
-
(2003)
Proc., 11th Annual Conf. of the International Group for Lean Construction
-
-
MacOmber, H.1
Howell, G.2
-
25
-
-
0022043393
-
Earned value technique for performance measurement
-
JMENEA 0742-597X, 10.1061/(ASCE)9742-597X(1985)1:2(79)
-
McConnell, D. (1985). " Earned value technique for performance measurement.." J. Manage. Eng. JMENEA 0742-597X, 1 (2), 79-94. 10.1061/(ASCE)9742-597X(1985)1:2(79)
-
(1985)
J. Manage. Eng.
, vol.1
, Issue.2
, pp. 79-94
-
-
McConnell, D.1
-
26
-
-
0032653583
-
The need for new paradigms for complex projects
-
IPMAEL 0263-7863, 10.1016/S0263-7863(98)00047-7
-
Williams, T. (1999). " The need for new paradigms for complex projects.." Int. J. Proj. Manage. IPMAEL 0263-7863, 17 (5), 269-273. 10.1016/S0263-7863(98)00047-7
-
(1999)
Int. J. Proj. Manage.
, vol.17
, Issue.5
, pp. 269-273
-
-
Williams, T.1
|