Volumn 26, Issue 4, 2010, Pages 223-228

Management thinking in the earned value method system and the last planner system

Author keywords

Construction industry; Last planner system (LPS); Management thinking; Performance measures; Planning; Project control; Project management

Indexed keywords

BEST-PRACTICES; EARNED VALUE; EMPIRICAL EVIDENCE; LAST PLANNER SYSTEM; MANAGEMENT THEORY; OPERATION LEVELS; OPERATIONAL LEVEL; PERFORMANCE MEASURE; PROJECT CONTROL; PROJECT CONTROL SYSTEMS;

EID: 77956859682     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000026     Document Type: Article
Times cited : (60)

References (26)
  • 2
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1998)124:1(11)
    • Ballard, G., and Howell, G. (1998). " Shielding production: Essential step in production control.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (1), 11-17. 10.1061/(ASCE)0733-9364(1998)124:1(11)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 6
    • 77956829457 scopus 로고    scopus 로고
    • Applying the last planner control system to a construction project: A case study in Quito, Equador
    • IGLC, Gramado, Brazil
    • Fiallo, C., and Revelo, V. (2002). " Applying the last planner control system to a construction project: A case study in Quito, Equador.." Proc., 10th Annual Conf. of the International Group for Lean Construction, IGLC, Gramado, Brazil.
    • (2002) Proc., 10th Annual Conf. of the International Group for Lean Construction
    • Fiallo, C.1    Revelo, V.2
  • 11
    • 77956829019 scopus 로고    scopus 로고
    • An experience of introducing last planner into a UK construction project
    • Johansen and Porter.. ".", IGLC, Blacksburg, VA
    • Johansen and Porter. (2003). " An experience of introducing last planner into a UK construction project.." Proc., 11th Annual Conf. of the International Group for Lean Construction, IGLC, Blacksburg, VA.
    • (2003) Proc., 11th Annual Conf. of the International Group for Lean Construction
  • 16
    • 29044447976 scopus 로고    scopus 로고
    • Customer-earned-value method
    • ZZZZZZ 1609-9451, 10.1142/S1609945102000096
    • Kim, Y., and Ballard, G. (2002). " Customer-earned-value method.." J. Constr. Res. ZZZZZZ 1609-9451, 3 (1), 55-66. 10.1142/S1609945102000096
    • (2002) J. Constr. Res. , vol.3 , Issue.1 , pp. 55-66
    • Kim, Y.1    Ballard, G.2
  • 19
    • 0000718046 scopus 로고    scopus 로고
    • Management of production in construction: Theoretical view
    • I. D. Tommelein, ed., IGLC, Berkeley, CA
    • Koskela, L. (1999). " Management of production in construction: Theoretical view.." Proc., 7th Annual Conf. of the International Group for Lean Construction, I. D. Tommelein, ed., IGLC, Berkeley, CA, 241-252.
    • (1999) Proc., 7th Annual Conf. of the International Group for Lean Construction , pp. 241-252
    • Koskela, L.1
  • 25
    • 0022043393 scopus 로고
    • Earned value technique for performance measurement
    • JMENEA 0742-597X, 10.1061/(ASCE)9742-597X(1985)1:2(79)
    • McConnell, D. (1985). " Earned value technique for performance measurement.." J. Manage. Eng. JMENEA 0742-597X, 1 (2), 79-94. 10.1061/(ASCE)9742-597X(1985)1:2(79)
    • (1985) J. Manage. Eng. , vol.1 , Issue.2 , pp. 79-94
    • McConnell, D.1
  • 26
    • 0032653583 scopus 로고    scopus 로고
    • The need for new paradigms for complex projects
    • IPMAEL 0263-7863, 10.1016/S0263-7863(98)00047-7
    • Williams, T. (1999). " The need for new paradigms for complex projects.." Int. J. Proj. Manage. IPMAEL 0263-7863, 17 (5), 269-273. 10.1016/S0263-7863(98)00047-7
    • (1999) Int. J. Proj. Manage. , vol.17 , Issue.5 , pp. 269-273
    • Williams, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.