Project estimates and outcomes in electricity generation research
-
0022-2380 10.1111/joms.1970.7.issue-3
-
Allen, J. M., and, Norris, K. P. (1970). " Project estimates and outcomes in electricity generation research." J. Manage. Stud., 7 (3), 271-287. 0022-2380 10.1111/joms.1970.7.issue-3
-
(1970)
J. Manage. Stud.
, vol.7
, Issue.3
, pp. 271-287
-
-
Allen, J.M.1
Norris, K.P.2
-
2
-
-
79952643314
-
Assessing the performance of construction projects: Implementing earned value management at the general services administration
-
1472-5967 10.1108/14725960510808419
-
Alvarado, C. M., Silverman, R. P., and, Wilson, D. S. (2004). " Assessing the performance of construction projects: Implementing earned value management at the general services administration." J. Facil. Manage., 3 (1), 92-105. 1472-5967 10.1108/14725960510808419
-
(2004)
J. Facil. Manage.
, vol.3
, Issue.1
, pp. 92-105
-
-
Alvarado, C.M.1
Silverman, R.P.2
Wilson, D.S.3
-
3
-
-
33645957411
-
Earned value project management method and extensions
-
1938-9507
-
Anbari, F. T. (2003). " Earned value project management method and extensions." Project Manage. J., 34 (4), 12-23. 1938-9507
-
(2003)
Project Manage. J.
, vol.34
, Issue.4
, pp. 12-23
-
-
Anbari, F.T.1
-
4
-
-
4644254478
-
Earned value project management method and extensions
-
IEMRAP 0360-8581 10.1109/EMR.2004.25113
-
Anbari, F. T. (2004). " Earned value project management method and extensions." IEEE Eng. Manage. Rev., 32 (3), 97-110. IEMRAP 0360-8581 10.1109/EMR.2004.25113
-
(2004)
IEEE Eng. Manage. Rev.
, vol.32
, Issue.3
, pp. 97-110
-
-
Anbari, F.T.1
-
5
-
-
0002006114
-
Error measures for generalizing about forecasting methods: Empirical comparisons
-
IJFOEK 0169-2070 10.1016/0169-2070(92)90008-W
-
Armstrong, J. S., and, Collopy, F. (1992). " Error measures for generalizing about forecasting methods: Empirical comparisons." Int. J. Forecast., 8 (1), 69-80. IJFOEK 0169-2070 10.1016/0169-2070(92)90008-W
-
(1992)
Int. J. Forecast.
, vol.8
, Issue.1
, pp. 69-80
-
-
Armstrong, J.S.1
Collopy, F.2
-
6
-
-
34250612698
-
Cost contingency management
-
10.1061/(ASCE)0742-597X(2007)23:3(140), JMENEA 0742-597X
-
Barraza, G. A., and, Bueno, R. A. (2007). " Cost contingency management." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2007)23:3(140), 140-146. JMENEA 0742-597X
-
(2007)
J. Manage. Eng.
, pp. 140-146
-
-
Barraza, G.A.1
Bueno, R.A.2
-
7
-
-
0002382548
-
Implementing earned value easily and effectively
-
1938-9507
-
Brandon, D. M. (1998). " Implementing earned value easily and effectively." Project Manage. J., 29 (2), 11-18. 1938-9507
-
(1998)
Project Manage. J.
, vol.29
, Issue.2
, pp. 11-18
-
-
Brandon, D.M.1
-
8
-
-
79951981814
-
Evaluation of projects using critical path analysis and earned value in combination
-
1938-9507
-
Brown, J. W. (1985). " Evaluation of projects using critical path analysis and earned value in combination." Project Manage. J., 16 (3), 59-63. 1938-9507
-
(1985)
Project Manage. J.
, vol.16
, Issue.3
, pp. 59-63
-
-
Brown, J.W.1
-
9
-
-
20744443199
-
Methods for managing different perspectives of project success
-
BJMAE4 1045-3172 10.1111/bjom.2005.16.issue-2
-
Bryde, D. J. (2005). " Methods for managing different perspectives of project success." Br. J. Manage., 16 (2), 119-131. BJMAE4 1045-3172 10.1111/bjom.2005.16.issue-2
-
(2005)
Br. J. Manage.
, vol.16
, Issue.2
, pp. 119-131
-
-
Bryde, D.J.1
-
10
-
-
84995315026
-
Project evaluations and firm decisions
-
0022-2380 10.1111/joms.1971.8.issue-3
-
Carter, E. (1971). " Project evaluations and firm decisions." J. Manage. Stud., 8 (3), 254-279. 0022-2380 10.1111/joms.1971.8.issue-3
-
(1971)
J. Manage. Stud.
, vol.8
, Issue.3
, pp. 254-279
-
-
Carter, E.1
-
11
-
-
0035279228
-
Defining cost-schedule performance indices and their ranges for design projects
-
10.1061/(ASCE)0742-597X(2001)17:2(122), JMENEA 0742-597X
-
Chang, A. S. T. (2001). " Defining cost-schedule performance indices and their ranges for design projects." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2001)17:2(122), 122-130. JMENEA 0742-597X
-
(2001)
J. Manage. Eng.
, pp. 122-130
-
-
Chang, A.S.T.1
-
12
-
-
77955718124
-
Visualized EVM system for assessing project performance
-
AUCOES 0926-5805 10.1016/j.autcon.2010.02.006
-
Chou, J. S., Chen, H. M., Hou, C. C., and, Lin, C. W. (2010). " Visualized EVM system for assessing project performance." Autom. Constr., 19 (5), 596-607. AUCOES 0926-5805 10.1016/j.autcon.2010.02.006
-
(2010)
Autom. Constr.
, vol.19
, Issue.5
, pp. 596-607
-
-
Chou, J.S.1
Chen, H.M.2
Hou, C.C.3
Lin, C.W.4
-
13
-
-
15844413358
-
A tool for managing projects an analytic parameterization of the S curve
-
IPMAEL 0263-7863 10.1016/j.ijproman.2004.08.001
-
Cioffi, D. G. (2005). " A tool for managing projects an analytic parameterization of the S curve." Int. J. Project Manage., 23 (3), 215-222. IPMAEL 0263-7863 10.1016/j.ijproman.2004.08.001
-
(2005)
Int. J. Project Manage.
, vol.23
, Issue.3
, pp. 215-222
-
-
Cioffi, D.G.1
-
14
-
-
33644634373
-
Completing projects according to plans an earned-value improvement index
-
JORSDZ 0160-5682 10.1057/palgrave.jors.2602007
-
Cioffi, D. G. (2006 a). " Completing projects according to plans an earned-value improvement index." J. Oper. Res. Soc., 57 (3), 290-295. JORSDZ 0160-5682 10.1057/palgrave.jors.2602007
-
(2006)
J. Oper. Res. Soc.
, vol.57
, Issue.3
, pp. 290-295
-
-
Cioffi, D.G.1
-
15
-
-
32644472456
-
Designing project management: A scientific notation and an improved formalism for earned value calculations
-
IPMAEL 0263-7863 10.1016/j.ijproman.2005.07.003
-
Cioffi, D. G. (2006 b). " Designing project management: A scientific notation and an improved formalism for earned value calculations." Int. J. Project Manage., 24 (2), 215-222. IPMAEL 0263-7863 10.1016/j.ijproman.2005.07. 003
-
(2006)
Int. J. Project Manage.
, vol.24
, Issue.2
, pp. 215-222
-
-
Cioffi, D.G.1
-
16
-
-
0001829246
-
Introduction of Grey system theory
-
JGSYE3 0957-3720
-
Deng, J. (1989). " Introduction of Grey system theory." J. Grey Syst., 1 (1), 1-24. JGSYE3 0957-3720
-
(1989)
J. Grey Syst.
, vol.1
, Issue.1
, pp. 1-24
-
-
Deng, J.1
-
17
-
-
33746627741
-
Evaluating the relative performance of engineering design projects: A case study using data envelopment analysis
-
IEEMA4 0018-9391 10.1109/TEM.2006.878100
-
Farris, J. A., Groesbeck, R. L., Van Aken, E. M., and, Letens, G. (2006). " Evaluating the relative performance of engineering design projects: A case study using data envelopment analysis." IEEE Trans. Eng. Manage., 53 (3), 471-482. IEEMA4 0018-9391 10.1109/TEM.2006.878100
-
(2006)
IEEE Trans. Eng. Manage.
, vol.53
, Issue.3
, pp. 471-482
-
-
Farris, J.A.1
Groesbeck, R.L.2
Van Aken, E.M.3
Letens, G.4
-
18
-
-
0028733964
-
The essence of evolution of earned value
-
CSTEDM 0274-9696
-
Fleming, Q. W., and, Koppelman, J. M. (1994). " The essence of evolution of earned value." Cost Eng., 36 (11), 21-27. CSTEDM 0274-9696
-
(1994)
Cost Eng.
, vol.36
, Issue.11
, pp. 21-27
-
-
Fleming, Q.W.1
Koppelman, J.M.2
-
19
-
-
0031070756
-
The genesis of earned value: The factory floor
-
CSTEDM 0274-9696
-
Fleming, Q. W., and, Koppelman, J. M. (1997). " The genesis of earned value: The factory floor." Cost Eng., 39 (2), 13-15. CSTEDM 0274-9696
-
(1997)
Cost Eng.
, vol.39
, Issue.2
, pp. 13-15
-
-
Fleming, Q.W.1
Koppelman, J.M.2
-
20
-
-
84859617329
-
Using the earned value management system to improve electrical project control
-
10.1061/(ASCE)CO.1943-7862.0000426, JCEMD4 0733-9364
-
Hanna, A. S. (2012). " Using the earned value management system to improve electrical project control." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000426, 449-457. JCEMD4 0733-9364
-
(2012)
J. Constr. Eng. Manage.
, pp. 449-457
-
-
Hanna, A.S.1
-
21
-
-
33646010711
-
Earned schedule: A breakthrough extension to earned value theory? A retrospective analysis of real project data
-
Henderson, K. (2003). " Earned schedule: a breakthrough extension to earned value theory? A retrospective analysis of real project data." The Measurable News, 13-23.
-
(2003)
The Measurable News
, pp. 13-23
-
-
Henderson, K.1
-
22
-
-
19744367863
-
The effect of general and partner-specific alliance experience on joint R&D project performance
-
0001-4273 10.5465/AMJ.2005.16928417
-
Hoang, H. T., and, Rothaermel, F. T. (2005). " The effect of general and partner-specific alliance experience on joint R&D project performance." Acad. Manage. J., 48 (2), 332-345. 0001-4273 10.5465/AMJ.2005.16928417
-
(2005)
Acad. Manage. J.
, vol.48
, Issue.2
, pp. 332-345
-
-
Hoang, H.T.1
Rothaermel, F.T.2
-
23
-
-
0041434035
-
On the minimum cost project schedule
-
0305-0483 10.1016/0305-0483(95)00028-M
-
Kamburowski, J. (1995). " On the minimum cost project schedule." Omega, 23 (4), 463-465. 0305-0483 10.1016/0305-0483(95)00028-M
-
(1995)
Omega
, vol.23
, Issue.4
, pp. 463-465
-
-
Kamburowski, J.1
-
24
-
-
0242270696
-
Why software projects escalate: The importance of project management constructs
-
IEEMA4 0018-9391 10.1109/TEM.2003.817312
-
Keil, M., Rai, A., Cheney Mann, J. E., and, Zhang, G. P. (2003). " Why software projects escalate: the importance of project management constructs." IEEE Trans. Eng. Manage., 50 (3), 251-261. IEEMA4 0018-9391 10.1109/TEM.2003.817312
-
(2003)
IEEE Trans. Eng. Manage.
, vol.50
, Issue.3
, pp. 251-261
-
-
Keil, M.1
Rai, A.2
Cheney Mann, J.E.3
Zhang, G.P.4
-
26
-
-
0038721043
-
A model for effective implementation of earned value management methodology
-
IPMAEL 0263-7863 10.1016/S0263-7863(02)00049-2
-
Kim, E. H., Wells, W. G., and, Duffey, M. R. (2003). " A model for effective implementation of earned value management methodology." Int. J. Project Manage., 21 (5), 375-382. IPMAEL 0263-7863 10.1016/S0263-7863(02)00049-2
-
(2003)
Int. J. Project Manage.
, vol.21
, Issue.5
, pp. 375-382
-
-
Kim, E.H.1
Wells, W.G.2
Duffey, M.R.3
-
27
-
-
77956859682
-
Management thinking in the earned value method system and the last planner system
-
10.1061/(ASCE)ME.1943-5479.0000026, JMENEA 0742-597X
-
Kim, Y. W., and, Ballard, G. (2010). " Management thinking in the earned value method system and the last planner system." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000026, 223-228. JMENEA 0742-597X
-
(2010)
J. Manage. Eng.
, pp. 223-228
-
-
Kim, Y.W.1
Ballard, G.2
-
28
-
-
0037596721
-
Factors influencing the usage and selection of project management software
-
IEEMA4 0018-9391 10.1109/TEM.2003.810821
-
Liberatore, M. J., and, Pollack-Johnson, B. (2003). " Factors influencing the usage and selection of project management software." IEEE Trans. Eng. Manage., 50 (2), 164-174. IEEMA4 0018-9391 10.1109/TEM.2003.810821
-
(2003)
IEEE Trans. Eng. Manage.
, vol.50
, Issue.2
, pp. 164-174
-
-
Liberatore, M.J.1
Pollack-Johnson, B.2
-
29
-
-
22744437020
-
Schedule is different
-
Lipke, W. (2003). " Schedule is different." The Measurable News, 31-34.
-
(2003)
The Measurable News
, pp. 31-34
-
-
Lipke, W.1
-
30
-
-
33845319564
-
Earned schedule: An emerging enhancement to earned value management
-
Lipke, W., and, Henderson, K. (2006). " Earned schedule: An emerging enhancement to earned value management." J. Defense Softw. Eng., 19 (11), 26-30.
-
(2006)
J. Defense Softw. Eng.
, vol.19
, Issue.11
, pp. 26-30
-
-
Lipke, W.1
Henderson, K.2
-
31
-
-
64449085007
-
Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes
-
IPMAEL 0263-7863 10.1016/j.ijproman.2008.02.009
-
Lipke, W., Zwikael, O., Henderson, K., and, Anbari, F. (2009). " Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes." Int. J. Project Manage., 27 (4), 400-407. IPMAEL 0263-7863 10.1016/j.ijproman.2008.02.009
-
(2009)
Int. J. Project Manage.
, vol.27
, Issue.4
, pp. 400-407
-
-
Lipke, W.1
Zwikael, O.2
Henderson, K.3
Anbari, F.4
-
32
-
-
0022043393
-
Earned value technique for performance measurements
-
10.1061/(ASCE)9742-597X(1985)1:2(79), JMENEA 0742-597X
-
McConnell, D. R. (1985). " Earned value technique for performance measurements." J. Manage. Eng., 10.1061/(ASCE)9742-597X(1985)1:2(79), 79-94. JMENEA 0742-597X
-
(1985)
J. Manage. Eng.
, pp. 79-94
-
-
McConnell, D.R.1
-
33
-
-
79952441224
-
Evaluating fuzzy earned value indices and estimates by applying alpha cuts
-
ESAPEH 0957-4174 10.1016/j.eswa.2010.12.165
-
Naeni, L. M., and, Salehipour, A. (2011). " Evaluating fuzzy earned value indices and estimates by applying alpha cuts." Expert Syst. Appl., 38 (7), 8193-8198. ESAPEH 0957-4174 10.1016/j.eswa.2010.12.165
-
(2011)
Expert Syst. Appl.
, vol.38
, Issue.7
, pp. 8193-8198
-
-
Naeni, L.M.1
Salehipour, A.2
-
34
-
-
2742535343
-
Trends in project cost control systems
-
0305-0483 10.1016/0305-0483(88)90025-4
-
Nandi, S. N., and, Dutta, B. K. (1988). " Trends in project cost control systems." Omega, 16 (6), 513-520. 0305-0483 10.1016/0305-0483(88) 90025-4
-
(1988)
Omega
, vol.16
, Issue.6
, pp. 513-520
-
-
Nandi, S.N.1
Dutta, B.K.2
-
35
-
-
0003973174
-
-
McGraw-Hill, Boston.
-
Neter, J., Kutner, M. H., Nachtsheim, C. J., and, Wasserman, W. (1996). Applied linear statistical models, McGraw-Hill, Boston.
-
(1996)
Applied Linear Statistical Models
-
-
Neter, J.1
Kutner, M.H.2
Nachtsheim, C.J.3
Wasserman, W.4
-
36
-
-
0019377850
-
Computer modelling for project evaluation
-
0305-0483 10.1016/0305-0483(81)90034-7
-
Newton, J. K. (1981). " Computer modelling for project evaluation." Omega, 9 (3), 281-286. 0305-0483 10.1016/0305-0483(81)90034-7
-
(1981)
Omega
, vol.9
, Issue.3
, pp. 281-286
-
-
Newton, J.K.1
-
37
-
-
0041743497
-
Project evaluation and control in decentralized firms: Is capital rationing always optimal?
-
MSCIAM 0025-1909 10.1287/mnsc.41.8.1404
-
Paik, T. Y., and, Sen, P. K. (1995). " Project evaluation and control in decentralized firms: Is capital rationing always optimal? " Manage. Sci., 41 (8), 1404-1414. MSCIAM 0025-1909 10.1287/mnsc.41.8.1404
-
(1995)
Manage. Sci.
, vol.41
, Issue.8
, pp. 1404-1414
-
-
Paik, T.Y.1
Sen, P.K.2
-
38
-
-
24744470252
-
Assessing and controlling the quality of a project end product: The earned quality method
-
IEEMA4 0018-9391 10.1109/17.820728
-
Paquin, J. P., Couillard, J., and, Ferrand, D. J. (2000). " Assessing and controlling the quality of a project end product: The earned quality method." IEEE Trans. Eng. Manage., 47 (1), 88-97. IEEMA4 0018-9391 10.1109/17.820728
-
(2000)
IEEE Trans. Eng. Manage.
, vol.47
, Issue.1
, pp. 88-97
-
-
Paquin, J.P.1
Couillard, J.2
Ferrand, D.J.3
-
39
-
-
26644469855
-
Cash flow forecasting model for general contractors using moving weights of cost categories
-
10.1061/(ASCE)0742-597X(2005)21:4(164), JMENEA 0742-597X
-
Park, H. K., Han, S. H., and, Russell, J. S. (2005). " Cash flow forecasting model for general contractors using moving weights of cost categories." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2005)21:4(164), 164-172. JMENEA 0742-597X
-
(2005)
J. Manage. Eng.
, pp. 164-172
-
-
Park, H.K.1
Han, S.H.2
Russell, J.S.3
-
40
-
-
84980300415
-
Planning and tactical factors in the project implementation process
-
0022-2380 10.1111/joms.1990.27.issue-3
-
Pinto, J., and, Prescott, J. (1990). " Planning and tactical factors in the project implementation process." J. Manage. Stud., 27 (3), 305-325. 0022-2380 10.1111/joms.1990.27.issue-3
-
(1990)
J. Manage. Stud.
, vol.27
, Issue.3
, pp. 305-325
-
-
Pinto, J.1
Prescott, J.2
-
41
-
-
44649153678
-
Team performance and information system implementation: Application of the progress curve to the earned value method in an information system project
-
1387-3326 10.1007/s10796-008-9080-9
-
Plaza, M. (2008). " Team performance and information system implementation: Application of the progress curve to the earned value method in an information system project." Inf. Syst. Frontiers, 10 (3), 374-395. 1387-3326 10.1007/s10796-008-9080-9
-
(2008)
Inf. Syst. Frontiers
, vol.10
, Issue.3
, pp. 374-395
-
-
Plaza, M.1
-
42
-
-
33745599608
-
Understanding the motivations, participation and performance of open source software developers: A longitudinal study of the apache projects
-
MSCIAM 0025-1909 10.1287/mnsc.1060.0554
-
Roberts, J. F., Hann, I. H., and, Slaughter, S. A. (2006). " Understanding the motivations, participation and performance of open source software developers: A longitudinal study of the apache projects." Manage. Sci., 52 (7), 984-999. MSCIAM 0025-1909 10.1287/mnsc.1060.0554
-
(2006)
Manage. Sci.
, vol.52
, Issue.7
, pp. 984-999
-
-
Roberts, J.F.1
Hann, I.H.2
Slaughter, S.A.3
-
43
-
-
67349156850
-
Project management recognizes R&D performance
-
0001-4273 10.2307/255229
-
Roman, D. D. (1964). " Project management recognizes R&D performance." Acad. Manage. J., 7 (1), 7-20. 0001-4273 10.2307/255229
-
(1964)
Acad. Manage. J.
, vol.7
, Issue.1
, pp. 7-20
-
-
Roman, D.D.1
-
44
-
-
23444455833
-
A note on the impact of environmental performance on financial performance
-
0954-349X 10.1016/j.strueco.2004.04.005
-
Salama, A. (2005). " A note on the impact of environmental performance on financial performance." Struct. Change Econ. Dyn., 16 (3), 413-421. 0954-349X 10.1016/j.strueco.2004.04.005
-
(2005)
Struct. Change Econ. Dyn.
, vol.16
, Issue.3
, pp. 413-421
-
-
Salama, A.1
-
45
-
-
59049093204
-
Learning in hybrid-project systems: The effects of project performance on repeated collaboration
-
0001-4273 10.5465/AMJ.2008.35732606
-
Schwab, A., and, Miner, A. (2008). " Learning in hybrid-project systems: The effects of project performance on repeated collaboration." Acad. Manage. J., 51 (6), 1117-1149. 0001-4273 10.5465/AMJ.2008.35732606
-
(2008)
Acad. Manage. J.
, vol.51
, Issue.6
, pp. 1117-1149
-
-
Schwab, A.1
Miner, A.2
-
46
-
-
0031999653
-
From theory to practice: Toward a typology of project-management styles
-
IEEMA4 0018-9391 10.1109/17.658659
-
Shenhar, A. J. (1998). " From theory to practice: Toward a typology of project-management styles." IEEE Trans. Eng. Manage., 45 (1), 33-48. IEEMA4 0018-9391 10.1109/17.658659
-
(1998)
IEEE Trans. Eng. Manage.
, vol.45
, Issue.1
, pp. 33-48
-
-
Shenhar, A.J.1
-
47
-
-
68049134593
-
Negative emotional reactions to project failure and the self-compassion to learn from the experience
-
0022-2380 10.1111/joms.2009.46.issue-6
-
Shepherd, D. A., and, Cardon, M. (2009). " Negative emotional reactions to project failure and the self-compassion to learn from the experience." J. Manage. Stud., 46 (6), 923-949. 0022-2380 10.1111/joms.2009.46.issue-6
-
(2009)
J. Manage. Stud.
, vol.46
, Issue.6
, pp. 923-949
-
-
Shepherd, D.A.1
Cardon, M.2
-
49
-
-
0025460174
-
CPM use in ENR top 400 contractors
-
10.1061/(ASCE)9742-597X(1990)6:3(282), JMENEA 0742-597X
-
Tavakoli, A., and, Riachi, R. (1990). " CPM use in ENR top 400 contractors." J. Manage. Eng., 10.1061/(ASCE)9742-597X(1990)6:3(282), 282-295. JMENEA 0742-597X
-
(1990)
J. Manage. Eng.
, pp. 282-295
-
-
Tavakoli, A.1
Riachi, R.2
-
50
-
-
0000502606
-
Influence styles of project managers: Some project performance correlates
-
0001-4273 10.2307/254975
-
Thamhain, H. J., and, Gemmill, G. (1974). " Influence styles of project managers: Some project performance correlates." Acad. Manage. J., 17 (2), 216-224. 0001-4273 10.2307/254975
-
(1974)
Acad. Manage. J.
, vol.17
, Issue.2
, pp. 216-224
-
-
Thamhain, H.J.1
Gemmill, G.2
-
51
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
IPMAEL 0263-7863 10.1016/j.ijproman.2005.10.004
-
Vandevoorde, S., and, Vanhoucke, M. (2006). " A comparison of different project duration forecasting methods using earned value metrics." Int. J. Project Manage., 24 (4), 289-302. IPMAEL 0263-7863 10.1016/j.ijproman. 2005.10.004
-
(2006)
Int. J. Project Manage.
, vol.24
, Issue.4
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
52
-
-
77953177108
-
Using activity sensitivity and network topology information to monitor project time performance
-
0305-0483 10.1016/j.omega.2009.10.001
-
Vanhoucke, M. (2010). " Using activity sensitivity and network topology information to monitor project time performance." Omega, 38 (5), 359-370. 0305-0483 10.1016/j.omega.2009.10.001
-
(2010)
Omega
, vol.38
, Issue.5
, pp. 359-370
-
-
Vanhoucke, M.1
-
53
-
-
0035435965
-
On maximizing the net present value of a project under renewable resource constraints
-
" MSCIAM 0025-1909 10.1287/mnsc.47.8.1113.10226
-
Vanhoucke, M., Demeulemeester, E., and, Herroelen, W. (2001). " On maximizing the net present value of a project under renewable resource constraints." Manage. Sci., 47 (8), 1113-1121. MSCIAM 0025-1909 10.1287/mnsc.47.8.1113.10226
-
(2001)
Manage. Sci.
, vol.47
, Issue.8
, pp. 1113-1121
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
54
-
-
35448944883
-
A simulation and evaluation of earned value metrics to forecast the project duration
-
JORSDZ 0160-5682 10.1057/palgrave.jors.2602296
-
Vanhoucke, M., and, Vandevoorde, S. (2007). " A simulation and evaluation of earned value metrics to forecast the project duration." J. Oper. Res. Soc., 58 (10), 1361-1374. JORSDZ 0160-5682 10.1057/palgrave.jors. 2602296
-
(2007)
J. Oper. Res. Soc.
, vol.58
, Issue.10
, pp. 1361-1374
-
-
Vanhoucke, M.1
Vandevoorde, S.2
-
55
-
-
0000902445
-
Generalization of the Durbin-Watson statistic for higher order autoregressive process
-
0090-3272 10.1080/03610927308827060
-
Vinod, H. D. (1973). " Generalization of the Durbin-Watson statistic for higher order autoregressive process." Commun. Stat., 2 (2), 115-144. 0090-3272 10.1080/03610927308827060
-
(1973)
Commun. Stat.
, vol.2
, Issue.2
, pp. 115-144
-
-
Vinod, H.D.1
-
56
-
-
33745913926
-
Practical experiences of cost/schedule measure through earned value management and statistical process control
-
LNCSD9 0302-9743 10.1007/11732990
-
Wang, Q., Jiang, J., Goul, L., Che, N., and, Zhang, R. (2006). " Practical experiences of cost/schedule measure through earned value management and statistical process control." Lect. Notes Comput. Sci., 3966, 348-354. LNCSD9 0302-9743 10.1007/11732990
-
(2006)
Lect. Notes Comput. Sci.
, vol.3966
, pp. 348-354
-
-
Wang, Q.1
Jiang, J.2
Goul, L.3
Che, N.4
Zhang, R.5
-
58
-
-
63149124223
-
Robust regression methods: Achieving small standard errors when there is heteroskedasticity
-
1534-844X 10.1207/s15328031us0304-8
-
Wilcox, R. R., and, Keselman, H. J. (2004). " Robust regression methods: Achieving small standard errors when there is heteroskedasticity." Understand. Stat., 3 (4), 349-364. 1534-844X 10.1207/s15328031us0304-8
-
(2004)
Understand. Stat.
, vol.3
, Issue.4
, pp. 349-364
-
-
Wilcox, R.R.1
Keselman, H.J.2
-
59
-
-
84889140049
-
Managing design under lump-sum contract
-
10.1061/(ASCE)0742-597X(1995)11:2(21), JMENEA 0742-597X
-
Willoughby, T. J. (1995). " Managing design under lump-sum contract." J. Manage. Eng., 10.1061/(ASCE)0742-597X(1995)11:2(21), 21-25. JMENEA 0742-597X
-
(1995)
J. Manage. Eng.
, pp. 21-25
-
-
Willoughby, T.J.1
-
60
-
-
84980243522
-
Performance in planning a large project
-
0022-2380 10.1111/joms.1982.19.issue-2
-
Woodward, S. N. (1982). " Performance in planning a large project." J. Manage. Stud., 19 (2), 183-198. 0022-2380 10.1111/joms.1982. 19.issue-2
-
(1982)
J. Manage. Stud.
, vol.19
, Issue.2
, pp. 183-198
-
-
Woodward, S.N.1
-
61
-
-
84865382021
-
Generalized discrete GM (1, 1) model
-
2043-9377 10.1108/20439371211197622
-
Yao, T., Forrest, J., and, Gong, Z. W. (2012). " Generalized discrete GM (1, 1) model." Grey Syst. Theory Appl., 2 (1), 4-12. 2043-9377 10.1108/20439371211197622
-
(2012)
Grey Syst. Theory Appl.
, vol.2
, Issue.1
, pp. 4-12
-
-
Yao, T.1
Forrest, J.2
Gong, Z.W.3
|