메뉴 건너뛰기




Volumn 36, Issue , 2015, Pages 25-35

The Adapter module: A building block for Self-Learning Production Systems

Author keywords

Agile manufacturing; Context awareness; Data mining; Intelligent scheduling; SOA

Indexed keywords

DATA MINING; ENERGY CONSERVATION; FAULT DETECTION; INDUSTRIAL RESEARCH; INFORMATION MANAGEMENT; MAINTENANCE; MANUFACTURE; SCHEDULING; THROUGHPUT;

EID: 84936890916     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rcim.2014.12.007     Document Type: Article
Times cited : (12)

References (53)
  • 4
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • D. Ouelhadj, and S. Petrovic A survey of dynamic scheduling in manufacturing systems J. Sched. 12 4 2009 417 431
    • (2009) J. Sched. , vol.12 , Issue.4 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 8
    • 81255146355 scopus 로고    scopus 로고
    • Service-oriented infrastructure to support the deployment of evolvable production systems
    • G. Cândido, A. Colombo, J. Barata, and F. Jammes Service-oriented infrastructure to support the deployment of evolvable production systems IEEE Trans. Ind. Inf. 99 2011 1
    • (2011) IEEE Trans. Ind. Inf. , vol.99 , pp. 1
    • Cândido, G.1    Colombo, A.2    Barata, J.3    Jammes, F.4
  • 9
    • 84958964894 scopus 로고    scopus 로고
    • Modeling context information in pervasive computing systems
    • Springer; Berlin, Heidelberg
    • K. Henricksen, J. Indulska, A. Rakotonirainy, Modeling context information in pervasive computing systems, in: Pervasive Computing, Springer; Berlin, Heidelberg, 2002, pp. 167-180.
    • (2002) Pervasive Computing , pp. 167-180
    • Henricksen, K.1    Indulska, J.2    Rakotonirainy, A.3
  • 14
    • 56449107215 scopus 로고    scopus 로고
    • Application of context-aware computing in manufacturing execution system
    • ICAL 2008. IEEE
    • Z. Chen, S. Liu, X. Wang, Application of context-aware computing in manufacturing execution system, in: IEEE International Conference on Automation and Logistics, 2008. ICAL 2008. IEEE, 2008, pp. 1969-1973. http://dx.doi.org/10.1109/ICAL.2008.4636484.
    • (2008) IEEE International Conference on Automation and Logistics, 2008 , pp. 1969-1973
    • Chen, Z.1    Liu, S.2    Wang, X.3
  • 15
    • 77955665456 scopus 로고    scopus 로고
    • Ontology-based reconfiguration agent for intelligent mechatronic systems in flexible manufacturing
    • Y. Alsafi, and V. Vyatkin Ontology-based reconfiguration agent for intelligent mechatronic systems in flexible manufacturing Robot. Comput.-Integr. Manuf. 26 4 2010 381 391
    • (2010) Robot. Comput.-Integr. Manuf. , vol.26 , Issue.4 , pp. 381-391
    • Alsafi, Y.1    Vyatkin, V.2
  • 17
    • 84856555735 scopus 로고    scopus 로고
    • Sustainable manufacturing trends and research challenges
    • M. Garetti, and M. Taisch Sustainable manufacturing trends and research challenges Prod. Plan. Control 23 2-3 2012 83 104
    • (2012) Prod. Plan. Control , vol.23 , Issue.2-3 , pp. 83-104
    • Garetti, M.1    Taisch, M.2
  • 19
    • 0002283033 scopus 로고    scopus 로고
    • From data mining to knowledge discovery in databases
    • U. Fayyad, G. Piatetsky-Shapiro, and P. Smyth From data mining to knowledge discovery in databases AI Mag. 17 3 1996 37
    • (1996) AI Mag. , vol.17 , Issue.3 , pp. 37
    • Fayyad, U.1    Piatetsky-Shapiro, G.2    Smyth, P.3
  • 21
    • 84937654251 scopus 로고
    • Applying machine learning to semiconductor manufacturing
    • K. Irani, J. Cheng, U. Fayyad, and Z. Qian Applying machine learning to semiconductor manufacturing iEEE Expert 8 1 1993 41 47
    • (1993) iEEE Expert , vol.8 , Issue.1 , pp. 41-47
    • Irani, K.1    Cheng, J.2    Fayyad, U.3    Qian, Z.4
  • 25
    • 26644461462 scopus 로고    scopus 로고
    • Discovering dispatching rules using data mining
    • X. Li, and S. Olafsson Discovering dispatching rules using data mining J. Sched. 8 6 2005 515 527
    • (2005) J. Sched. , vol.8 , Issue.6 , pp. 515-527
    • Li, X.1    Olafsson, S.2
  • 26
    • 33744978995 scopus 로고    scopus 로고
    • Optimization and analysis aid via data-mining for simulated production systems
    • A. Huyet Optimization and analysis aid via data-mining for simulated production systems Eur. J. Oper. Res. 173 3 2006 827 838
    • (2006) Eur. J. Oper. Res. , vol.173 , Issue.3 , pp. 827-838
    • Huyet, A.1
  • 27
    • 78349281210 scopus 로고    scopus 로고
    • Mining manufacturing data for discovery of high productivity process characteristics
    • S. Charaniya, H. Le, H. Rangwala, K. Mills, K. Johnson, G. Karypis, and W. Hu Mining manufacturing data for discovery of high productivity process characteristics J. Biotechnol. 147 3 2010 186 197
    • (2010) J. Biotechnol. , vol.147 , Issue.3 , pp. 186-197
    • Charaniya, S.1    Le, H.2    Rangwala, H.3    Mills, K.4    Johnson, K.5    Karypis, G.6    Hu, W.7
  • 29
    • 0034627942 scopus 로고    scopus 로고
    • Dynamic scheduling of fms using a real-time genetic algorithm
    • A. Rossi, and G. Dini Dynamic scheduling of fms using a real-time genetic algorithm Int. J. Prod. Res. 38 1 2000 1 20
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.1 , pp. 1-20
    • Rossi, A.1    Dini, G.2
  • 31
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • A. Jain, and H. Elmaraghy Production scheduling/rescheduling in flexible manufacturing Int. J. Prod. Res. 35 1 1997 281 309
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.1 , pp. 281-309
    • Jain, A.1    Elmaraghy, H.2
  • 32
    • 0036131852 scopus 로고    scopus 로고
    • Integrating petri nets and hybrid heuristic search for the scheduling of fms
    • A. Reyes, H. Yu, G. Kelleher, and S. Lloyd Integrating petri nets and hybrid heuristic search for the scheduling of fms Comput. Ind. 47 1 2002 123 138
    • (2002) Comput. Ind. , vol.47 , Issue.1 , pp. 123-138
    • Reyes, A.1    Yu, H.2    Kelleher, G.3    Lloyd, S.4
  • 33
    • 4344584596 scopus 로고    scopus 로고
    • Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system
    • B. Shnits, J. Rubinovitz, and D. Sinreich Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system Int. J. Prod. Res. 42 17 2004 3457 3472
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.17 , pp. 3457-3472
    • Shnits, B.1    Rubinovitz, J.2    Sinreich, D.3
  • 34
    • 33750028809 scopus 로고    scopus 로고
    • An integrated scheme for process planning and scheduling in fms
    • A. Jain, P. Jain, and I. Singh An integrated scheme for process planning and scheduling in fms Int. J. Adv. Manuf. Technol. 30 11-12 2006 1111 1118
    • (2006) Int. J. Adv. Manuf. Technol. , vol.30 , Issue.11-12 , pp. 1111-1118
    • Jain, A.1    Jain, P.2    Singh, I.3
  • 35
    • 27144552649 scopus 로고    scopus 로고
    • Flowshop scheduling research after five decades
    • J.N. Gupta, and E.F. Stafford Jr. Flowshop scheduling research after five decades Eur. J. Oper. Res. 169 3 2006 699 711
    • (2006) Eur. J. Oper. Res. , vol.169 , Issue.3 , pp. 699-711
    • Gupta, J.N.1    Stafford, E.F.2
  • 36
    • 79952630666 scopus 로고    scopus 로고
    • A scheduling policy for improving tardiness performance
    • N. Papakostas, and G. Chryssolouris A scheduling policy for improving tardiness performance Asian Int. J. Sci. Technol. 2 3 2009 79 89
    • (2009) Asian Int. J. Sci. Technol. , vol.2 , Issue.3 , pp. 79-89
    • Papakostas, N.1    Chryssolouris, G.2
  • 37
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties a review and some future directions
    • H. Aytug, M.A. Lawley, K. McKay, S. Mohan, and R. Uzsoy Executing production schedules in the face of uncertainties a review and some future directions Eur. J. Oper. Res. 161 1 2005 86 110
    • (2005) Eur. J. Oper. Res. , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 38
    • 27944495605 scopus 로고    scopus 로고
    • Implementing global factory schedules in the face of stochastic disruptions
    • A. Barua, N. Raghavan, A. Upasani, and R. Uzsoy Implementing global factory schedules in the face of stochastic disruptions Int. J. Prod. Res. 43 4 2005 793 818
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.4 , pp. 793-818
    • Barua, A.1    Raghavan, N.2    Upasani, A.3    Uzsoy, R.4
  • 39
    • 60749122333 scopus 로고    scopus 로고
    • Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research
    • I. Sabuncuoglu, and S. Goren Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research Int. J. Comput. Integr. Manuf. 22 2 2009 138 157
    • (2009) Int. J. Comput. Integr. Manuf. , vol.22 , Issue.2 , pp. 138-157
    • Sabuncuoglu, I.1    Goren, S.2
  • 48
    • 85164392958 scopus 로고
    • A study of cross-validation and bootstrap for accuracy estimation and model selection
    • Morgan Kaufmann Publishers Inc.; San Francisco, CA, USA
    • R. Kohavi, et al., A study of cross-validation and bootstrap for accuracy estimation and model selection, in: International Joint Conference on Artificial Intelligence, vol. 2, Morgan Kaufmann Publishers Inc.; San Francisco, CA, USA, 1995, pp. 1137-1143.
    • (1995) International Joint Conference on Artificial Intelligence , vol.2 , pp. 1137-1143
    • Kohavi, R.1
  • 53
    • 84951121227 scopus 로고    scopus 로고
    • Self-learning production systems: adapter reference architecture
    • Springer; Switzerland
    • G. Cândido, G. Di Orio, J. Barata, Self-learning production systems: adapter reference architecture, in: Advances in Sustainable and Competitive Manufacturing Systems, Springer; Switzerland, 2013, pp. 681-693. http://dx.doi.org/10.1007/978-3-319-00557-7-56.
    • (2013) Advances in Sustainable and Competitive Manufacturing Systems , pp. 681-693
    • Cândido, G.1    Di Orio, G.2    Barata, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.