메뉴 건너뛰기




Volumn , Issue , 2009, Pages 1139-1144

Appropriate evolutionary algorithm for scheduling in FMS

Author keywords

Flexible manufacturing system; Genetic algorithm; Scheduling constraint; Simulated annealing

Indexed keywords

BATCH MODES; COMPETITIVE COSTS; GLOBAL COMPETITION; HIGH QUALITY; INFORMATION FLOWS; MANUFACTURING INDUSTRIES; MANUFACTURING ORGANIZATIONS; PRODUCT LIFE CYCLES; PRODUCT QUALITY; SCHEDULING CONSTRAINT; SCHEDULING CONSTRAINTS; STRATEGIC ADVANTAGES;

EID: 77949602147     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/NABIC.2009.5393817     Document Type: Conference Paper
Times cited : (7)

References (8)
  • 1
    • 2642567726 scopus 로고    scopus 로고
    • Tool allocation in flexible manufacturing systems with tool alternatives
    • N. Buyurgan, C. Saygin, and S.E. Kilic, Tool allocation in flexible manufacturing systems with tool alternatives', Robotics and Computer Integrated Manufacturing, Vol. 20, No. 4, pp.341-349, (2004)
    • (2004) Robotics and Computer Integrated Manufacturing , vol.20 , Issue.4 , pp. 341-349
    • Buyurgan, N.1    Saygin, C.2    Kilic, S.E.3
  • 2
    • 3142777327 scopus 로고    scopus 로고
    • Advanced planning and scheduling based on precedence and resource constraints for E-plant chains
    • C. Moon, , J.S. Kim, and M. Gen, Advanced planning and scheduling based on precedence and resource constraints for E-plant chains, International Journal of Production Research,Vol. 42, No. 15, pp.2941-2954, (2004).
    • (2004) International Journal of Production Research , vol.42 , Issue.15 , pp. 2941-2954
    • Moon, C.1    Kim, J.S.2    Gen, M.3
  • 3
    • 0038243040 scopus 로고    scopus 로고
    • Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation
    • C.S. Lee, , S.S. Kim, and J.S. Choi, Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation', Computers in Industry, Vol. 45, No. 1, pp.61-73, (2003).
    • (2003) Computers in Industry , vol.45 , Issue.1 , pp. 61-73
    • Lee, C.S.1    Kim, S.S.2    Choi, J.S.3
  • 4
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • G.E. Vieira, , J.W. Herrmann, and E. Lin, Rescheduling manufacturing systems: a framework of strategies, policies, and methods, Journal of Scheduling, Vol. 6, No. 1, pp.39-62, (2003).
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 5
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Y.H. Lee, C.S. Jeong, and C. Moon, Advanced planning and scheduling with outsourcing in manufacturing supply chain, Computers and Industrial Engineering, Vol. 43, Nos. 1-2, pp.351-374, (2002).
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 6
    • 0344898438 scopus 로고    scopus 로고
    • Scheduling decisions in FMS using a heuristic approach
    • Int J Adv Manuf Technol
    • H.A. Noorul , T. Karthikeyan , and M. Dinesh,, Scheduling decisions in FMS using a heuristic approach, pp.374-379,Int J Adv Manuf Technol (2003).
    • (2003) , pp. 374-379
    • Noorul, H.A.1    Karthikeyan, T.2    Dinesh, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.