메뉴 건너뛰기




Volumn 26, Issue 3, 2015, Pages 167-177

Using simulation to manage project supply chain in the offshore oil and gas industry

Author keywords

offshore; oil and gas; project supply chain; simulation

Indexed keywords

DECISION SUPPORT SYSTEMS; OFFSHORE OIL WELL PRODUCTION; OFFSHORE PIPELINES; PETROLEUM INDUSTRY; PUBLIC UTILITIES; SPREADSHEETS; STOCHASTIC MODELS; STOCHASTIC SYSTEMS; SUPPLY CHAINS;

EID: 84929129602     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537287.2013.870360     Document Type: Article
Times cited : (8)

References (31)
  • 2
    • 33749007664 scopus 로고    scopus 로고
    • Ship transport of co2 technical solutions and analysis of costs, energy utilization, energy efficiency and co2 emissions
    • Aspelund, A., M. J. Mølnvik, and G. De Koeijer. 2006. Ship Transport Of CO2 Technical Solutions and Analysis of Costs, Energy Utilization, Energy Efficiency and CO2 Emissions. Chemical Engineering Research and Design 84 (A9): 847-855
    • (2006) Chemical Engineering Research and Design , vol.84 , Issue.A9 , pp. 847-855
    • Aspelund, A.1    Mølnvik, M.J.2    De Koeijer, G.3
  • 3
    • 0004011301 scopus 로고    scopus 로고
    • Birmingham: Internal Publication of the School of Civil Engineering, The University of Birmingham
    • Ballard, G. 2000. The Last Planner System of Production Control. Birmingham: Internal Publication of the School of Civil Engineering, The University of Birmingham
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 4
    • 27844542118 scopus 로고    scopus 로고
    • An empirically derived agenda of critical research issues for managing supply-chain disruptions
    • Blackhurst, J. et al. 2005. An Empirically Derived Agenda of Critical Research Issues for Managing Supply-chain Disruptions. International Journal of Production Research 43 (19): 4067-4081
    • (2005) International Journal of Production Research , vol.43 , Issue.19 , pp. 4067-4081
    • Blackhurst, J.1
  • 6
    • 35648998986 scopus 로고    scopus 로고
    • Competition of large-scale projects: The game model of gas pipeline construction
    • Brykalov, S. A., M. A. Melentsova, and O. I. Nikonov. 2007. Competition of Large-scale Projects: The Game Model of Gas Pipeline Construction. Automation and Remote Control 68 (10): 1745-1755
    • (2007) Automation and Remote Control , vol.68 , Issue.10 , pp. 1745-1755
    • Brykalov, S.A.1    Melentsova, M.A.2    Nikonov, O.I.3
  • 8
    • 1942500454 scopus 로고    scopus 로고
    • Logistics for world-wide crude oil transportation using discrete event simulation and optimal control
    • Cheng, L., and M. A. Duran. 2004. Logistics for World-wide Crude Oil Transportation Using Discrete Event Simulation and Optimal Control. Computers and Chemical Engineering 28: 897-911
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 897-911
    • Cheng, L.1    Duran, M.A.2
  • 9
    • 4444251010 scopus 로고    scopus 로고
    • Improving productivity of automated tissue converting lines: An empirical model and a case study
    • Cigolini, R., and T. Rossi. 2004. Improving Productivity of Automated Tissue Converting Lines: an Empirical Model and a Case Study. Production Planning & Control 15 (5): 550-563
    • (2004) Production Planning & Control , vol.15 , Issue.5 , pp. 550-563
    • Cigolini, R.1    Rossi, T.2
  • 10
    • 77954071457 scopus 로고    scopus 로고
    • Managing operational risks along the oil supply chain
    • Cigolini, R., and T. Rossi. 2010a. Managing Operational Risks along the Oil Supply Chain. Production Planning & Control 21 (5): 452-467
    • (2010) Production Planning & Control , vol.21 , Issue.5 , pp. 452-467
    • Cigolini, R.1    Rossi, T.2
  • 11
    • 77954054457 scopus 로고    scopus 로고
    • Sizing off-shore transshipment systems in dry-bulk transportation
    • Cigolini, R., and T. Rossi. 2010b. Sizing Off-shore Transshipment Systems in Dry-bulk Transportation. Production Planning & Control 21 (5): 508-522
    • (2010) Production Planning & Control , vol.21 , Issue.5 , pp. 508-522
    • Cigolini, R.1    Rossi, T.2
  • 12
    • 80051755623 scopus 로고    scopus 로고
    • An object-oriented simulation meta-model to analyse supply chain performance
    • Cigolini, R., M. Pero, and T. Rossi. 2011. An Object-oriented Simulation Meta-model to Analyse Supply Chain Performance. International Journal of Production Research 49 (19): 5917-5941
    • (2011) International Journal of Production Research , vol.49 , Issue.19 , pp. 5917-5941
    • Cigolini, R.1    Pero, M.2    Rossi, T.3
  • 13
    • 84871348190 scopus 로고    scopus 로고
    • Sizing off-shore transshipment systems: A case study in maritime dry-bulk transportation
    • Cigolini, R., M. Pero, and T. Rossi. 2013. Sizing Off-shore Transshipment Systems: A Case Study in Maritime Dry-bulk Transportation. Production Planning and Control 24 (1): 15-27
    • (2013) Production Planning and Control , vol.24 , Issue.1 , pp. 15-27
    • Cigolini, R.1    Pero, M.2    Rossi, T.3
  • 14
    • 84862661786 scopus 로고    scopus 로고
    • An integrated model for designing and optimising an international logistics network
    • Creazza, A, F. Dallari, and T. Rossi. 2012. An Integrated Model for Designing and Optimising an International Logistics Network. International Journal of Production Research 50 (11): 2925-2939
    • (2012) International Journal of Production Research , vol.50 , Issue.11 , pp. 2925-2939
    • Creazza, A.1    Dallari, F.2    Rossi, T.3
  • 16
    • 84867463560 scopus 로고    scopus 로고
    • Project risk management using multiple criteria decision-making technique and decision tree analysis: A case study of indian oil refinery
    • Dey, P. K. 2012. Project Risk Management Using Multiple Criteria Decision-making Technique and Decision Tree Analysis: A Case Study of Indian Oil Refinery. Production Planning & Control 23 (12): 903-921
    • (2012) Production Planning & Control , vol.23 , Issue.12 , pp. 903-921
    • Dey, P.K.1
  • 17
    • 78649497318 scopus 로고    scopus 로고
    • The use of performance measurement as a basis for project control of offshore modification oil and gas projects
    • Fouchè, D. P., and A. Rolstadas. 2010. The Use of Performance Measurement as a Basis for Project Control of Offshore Modification Oil and Gas Projects. Production Planning & Control 21 (8): 760-773
    • (2010) Production Planning & Control , vol.21 , Issue.8 , pp. 760-773
    • Fouchè, D.P.1    Rolstadas, A.2
  • 18
    • 77950926171 scopus 로고    scopus 로고
    • Simulating the impact of supply chain management practice on the performance of medium-sized building projects
    • Hatmoko, J. U. D., and S. Scott. 2010. Simulating the Impact of Supply Chain Management Practice on the Performance of Medium-sized Building Projects. Construction Management and Economics 28 (1): 35-49
    • (2010) Construction Management and Economics , vol.28 , Issue.1 , pp. 35-49
    • Hatmoko, J.U.D.1    Scott, S.2
  • 20
    • 42649090849 scopus 로고    scopus 로고
    • Application of a mathematic programming model for integrated planning and scheduling of petroleum supply networks
    • Kuo, T. H., and C. T. Chang. 2008. Application of a Mathematic Programming Model for Integrated Planning and Scheduling of Petroleum Supply Networks. Industrial and Engineering Chemistry Research 47 (6): 1935-1954
    • (2008) Industrial and Engineering Chemistry Research , vol.47 , Issue.6 , pp. 1935-1954
    • Kuo, T.H.1    Chang, C.T.2
  • 21
    • 74149084640 scopus 로고    scopus 로고
    • An exploratory study of the relation between supply chain topological features and supply chain performance
    • Pero, M., T. Rossi, C. Noè, and A. Sianesi. 2010. An Exploratory Study of the Relation between Supply Chain Topological Features and Supply Chain Performance. International Journal of Production Economics 123 (2): 266-278
    • (2010) International Journal of Production Economics , vol.123 , Issue.2 , pp. 266-278
    • Pero, M.1    Rossi, T.2    Noè, C.3    Sianesi, A.4
  • 22
    • 0037138854 scopus 로고    scopus 로고
    • Production-inventory system controller design and supply chain dynamics
    • Riddalls, C., and S. Bennett. 2002. Production-inventory System Controller Design and Supply Chain Dynamics. International Journal of Systems Science 33 (3): 181-195
    • (2002) International Journal of Systems Science , vol.33 , Issue.3 , pp. 181-195
    • Riddalls, C.1    Bennett, S.2
  • 23
    • 42649097322 scopus 로고    scopus 로고
    • Developments in russian gas production since 1998: Russia's evolving gas supply strategy
    • Sagers, M. J. 2007. Developments in Russian Gas Production Since 1998: Russia's Evolving Gas Supply Strategy. Eurasian Geography and Economics 48 (6): 651-698
    • (2007) Eurasian Geography and Economics , vol.48 , Issue.6 , pp. 651-698
    • Sagers, M.J.1
  • 24
    • 16244380766 scopus 로고    scopus 로고
    • Analysis of supply system models for planning construction project logistics
    • Sobotka, A., and A. Czarnigowska. 2005. Analysis of Supply System Models for Planning Construction Project Logistics. Journal of Civil Engineering and Management 11 (1): 73-82
    • (2005) Journal of Civil Engineering and Management , vol.11 , Issue.1 , pp. 73-82
    • Sobotka, A.1    Czarnigowska, A.2
  • 25
    • 34047153279 scopus 로고    scopus 로고
    • What is the limit of chinese coal supplies-A stella model of hubbert peak
    • Tao, Z., and M. Li. 2007. What is the Limit of Chinese Coal Supplies-A STELLA Model of Hubbert Peak. Energy Policy 35: 3145-3154
    • (2007) Energy Policy , vol.35 , pp. 3145-3154
    • Tao, Z.1    Li, M.2
  • 27
    • 33746804127 scopus 로고    scopus 로고
    • Supply risk and inventory outsourcing
    • Tapiero, C. S., and A. Grando. 2006. Supply Risk and Inventory Outsourcing. Production Planning & Control 17 (5): 534-539
    • (2006) Production Planning & Control , vol.17 , Issue.5 , pp. 534-539
    • Tapiero, C.S.1    Grando, A.2
  • 28
    • 84929139119 scopus 로고    scopus 로고
    • Disruptions in tightly coupled supply chain networks: The case of the us offshore oil industry
    • Forthcoming
    • Wagner, S. et al. Forthcoming. Disruptions in Tightly Coupled Supply Chain Networks: The Case of the US Offshore Oil Industry. Production Planning & Control
    • Production Planning & Control
    • Wagner, S.1
  • 29
    • 32144432328 scopus 로고    scopus 로고
    • Coping with project dynamics in an interfirm project context
    • Weck, M. 2005. Coping with Project Dynamics in an Interfirm Project Context. Production Planning & Control 16 (4): 396-404
    • (2005) Production Planning & Control , vol.16 , Issue.4 , pp. 396-404
    • Weck, M.1
  • 31
    • 0036568674 scopus 로고    scopus 로고
    • Integrating supply chain and critical chain concepts in engineer-procure-construct (epc) projects
    • Yeo, K. T., and J. H. Ning. 2002. Integrating Supply Chain and Critical Chain Concepts in Engineer-procure-construct (EPC) Projects. International Journal of Project Management 20 (4): 253-262
    • (2002) International Journal of Project Management , vol.20 , Issue.4 , pp. 253-262
    • Yeo, K.T.1    Ning, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.