2
-
-
33749007664
-
Ship transport of co2 technical solutions and analysis of costs, energy utilization, energy efficiency and co2 emissions
-
Aspelund, A., M. J. Mølnvik, and G. De Koeijer. 2006. Ship Transport Of CO2 Technical Solutions and Analysis of Costs, Energy Utilization, Energy Efficiency and CO2 Emissions. Chemical Engineering Research and Design 84 (A9): 847-855
-
(2006)
Chemical Engineering Research and Design
, vol.84
, Issue.A9
, pp. 847-855
-
-
Aspelund, A.1
Mølnvik, M.J.2
De Koeijer, G.3
-
3
-
-
0004011301
-
-
Birmingham: Internal Publication of the School of Civil Engineering, The University of Birmingham
-
Ballard, G. 2000. The Last Planner System of Production Control. Birmingham: Internal Publication of the School of Civil Engineering, The University of Birmingham
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.1
-
4
-
-
27844542118
-
An empirically derived agenda of critical research issues for managing supply-chain disruptions
-
Blackhurst, J. et al. 2005. An Empirically Derived Agenda of Critical Research Issues for Managing Supply-chain Disruptions. International Journal of Production Research 43 (19): 4067-4081
-
(2005)
International Journal of Production Research
, vol.43
, Issue.19
, pp. 4067-4081
-
-
Blackhurst, J.1
-
5
-
-
4344657226
-
An oil pipeline design problem
-
Brimberg, J., P. Hansen, K.-W. Lih, N. Mladenovic, and M. Breton. 2003. An Oil Pipeline Design Problem. Operations Research 51 (2): 228-239
-
(2003)
Operations Research
, vol.51
, Issue.2
, pp. 228-239
-
-
Brimberg, J.1
Hansen, P.2
Lih, K.-W.3
Mladenovic, N.4
Breton, M.5
-
6
-
-
35648998986
-
Competition of large-scale projects: The game model of gas pipeline construction
-
Brykalov, S. A., M. A. Melentsova, and O. I. Nikonov. 2007. Competition of Large-scale Projects: The Game Model of Gas Pipeline Construction. Automation and Remote Control 68 (10): 1745-1755
-
(2007)
Automation and Remote Control
, vol.68
, Issue.10
, pp. 1745-1755
-
-
Brykalov, S.A.1
Melentsova, M.A.2
Nikonov, O.I.3
-
8
-
-
1942500454
-
Logistics for world-wide crude oil transportation using discrete event simulation and optimal control
-
Cheng, L., and M. A. Duran. 2004. Logistics for World-wide Crude Oil Transportation Using Discrete Event Simulation and Optimal Control. Computers and Chemical Engineering 28: 897-911
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 897-911
-
-
Cheng, L.1
Duran, M.A.2
-
9
-
-
4444251010
-
Improving productivity of automated tissue converting lines: An empirical model and a case study
-
Cigolini, R., and T. Rossi. 2004. Improving Productivity of Automated Tissue Converting Lines: an Empirical Model and a Case Study. Production Planning & Control 15 (5): 550-563
-
(2004)
Production Planning & Control
, vol.15
, Issue.5
, pp. 550-563
-
-
Cigolini, R.1
Rossi, T.2
-
10
-
-
77954071457
-
Managing operational risks along the oil supply chain
-
Cigolini, R., and T. Rossi. 2010a. Managing Operational Risks along the Oil Supply Chain. Production Planning & Control 21 (5): 452-467
-
(2010)
Production Planning & Control
, vol.21
, Issue.5
, pp. 452-467
-
-
Cigolini, R.1
Rossi, T.2
-
11
-
-
77954054457
-
Sizing off-shore transshipment systems in dry-bulk transportation
-
Cigolini, R., and T. Rossi. 2010b. Sizing Off-shore Transshipment Systems in Dry-bulk Transportation. Production Planning & Control 21 (5): 508-522
-
(2010)
Production Planning & Control
, vol.21
, Issue.5
, pp. 508-522
-
-
Cigolini, R.1
Rossi, T.2
-
12
-
-
80051755623
-
An object-oriented simulation meta-model to analyse supply chain performance
-
Cigolini, R., M. Pero, and T. Rossi. 2011. An Object-oriented Simulation Meta-model to Analyse Supply Chain Performance. International Journal of Production Research 49 (19): 5917-5941
-
(2011)
International Journal of Production Research
, vol.49
, Issue.19
, pp. 5917-5941
-
-
Cigolini, R.1
Pero, M.2
Rossi, T.3
-
13
-
-
84871348190
-
Sizing off-shore transshipment systems: A case study in maritime dry-bulk transportation
-
Cigolini, R., M. Pero, and T. Rossi. 2013. Sizing Off-shore Transshipment Systems: A Case Study in Maritime Dry-bulk Transportation. Production Planning and Control 24 (1): 15-27
-
(2013)
Production Planning and Control
, vol.24
, Issue.1
, pp. 15-27
-
-
Cigolini, R.1
Pero, M.2
Rossi, T.3
-
14
-
-
84862661786
-
An integrated model for designing and optimising an international logistics network
-
Creazza, A, F. Dallari, and T. Rossi. 2012. An Integrated Model for Designing and Optimising an International Logistics Network. International Journal of Production Research 50 (11): 2925-2939
-
(2012)
International Journal of Production Research
, vol.50
, Issue.11
, pp. 2925-2939
-
-
Creazza, A.1
Dallari, F.2
Rossi, T.3
-
15
-
-
0342903332
-
Planning logistics operations in the oil industry
-
Dempster, M. A. H., N. Hicks Pedron, E. A. Medova, J. E. Scott, and A. Sembos. 2000. Planning Logistics Operations in the Oil Industry. Journal of the Operational Research Society 51 (11): 1271-1288
-
(2000)
Journal of the Operational Research Society
, vol.51
, Issue.11
, pp. 1271-1288
-
-
Dempster, M.A.H.1
Hicks Pedron, N.2
Medova, E.A.3
Scott, J.E.4
Sembos, A.5
-
16
-
-
84867463560
-
Project risk management using multiple criteria decision-making technique and decision tree analysis: A case study of indian oil refinery
-
Dey, P. K. 2012. Project Risk Management Using Multiple Criteria Decision-making Technique and Decision Tree Analysis: A Case Study of Indian Oil Refinery. Production Planning & Control 23 (12): 903-921
-
(2012)
Production Planning & Control
, vol.23
, Issue.12
, pp. 903-921
-
-
Dey, P.K.1
-
17
-
-
78649497318
-
The use of performance measurement as a basis for project control of offshore modification oil and gas projects
-
Fouchè, D. P., and A. Rolstadas. 2010. The Use of Performance Measurement as a Basis for Project Control of Offshore Modification Oil and Gas Projects. Production Planning & Control 21 (8): 760-773
-
(2010)
Production Planning & Control
, vol.21
, Issue.8
, pp. 760-773
-
-
Fouchè, D.P.1
Rolstadas, A.2
-
18
-
-
77950926171
-
Simulating the impact of supply chain management practice on the performance of medium-sized building projects
-
Hatmoko, J. U. D., and S. Scott. 2010. Simulating the Impact of Supply Chain Management Practice on the Performance of Medium-sized Building Projects. Construction Management and Economics 28 (1): 35-49
-
(2010)
Construction Management and Economics
, vol.28
, Issue.1
, pp. 35-49
-
-
Hatmoko, J.U.D.1
Scott, S.2
-
19
-
-
79955433623
-
Options for transporting co2 from coal fired power plants case denmark
-
Haugen, H. A., N. Eldrupa, C. Bernstoneb, S. Liljemarkc, H. Petterssonc, M. Noerd, J. Hollande, P. A. Nilssone, G. Hegerlandf, and J. O. Pandef. 2009. Options for Transporting CO2 from Coal Fired Power Plants Case Denmark. Energy Procedia 1: 1665-1672
-
(2009)
Energy Procedia
, vol.1
, pp. 1665-1672
-
-
Haugen, H.A.1
Eldrupa, N.2
Bernstoneb, C.3
Liljemarkc, S.4
Petterssonc, H.5
Noerd, M.6
Hollande, J.7
Nilssone, P.A.8
Hegerlandf, G.9
Pandef, J.O.10
-
20
-
-
42649090849
-
Application of a mathematic programming model for integrated planning and scheduling of petroleum supply networks
-
Kuo, T. H., and C. T. Chang. 2008. Application of a Mathematic Programming Model for Integrated Planning and Scheduling of Petroleum Supply Networks. Industrial and Engineering Chemistry Research 47 (6): 1935-1954
-
(2008)
Industrial and Engineering Chemistry Research
, vol.47
, Issue.6
, pp. 1935-1954
-
-
Kuo, T.H.1
Chang, C.T.2
-
21
-
-
74149084640
-
An exploratory study of the relation between supply chain topological features and supply chain performance
-
Pero, M., T. Rossi, C. Noè, and A. Sianesi. 2010. An Exploratory Study of the Relation between Supply Chain Topological Features and Supply Chain Performance. International Journal of Production Economics 123 (2): 266-278
-
(2010)
International Journal of Production Economics
, vol.123
, Issue.2
, pp. 266-278
-
-
Pero, M.1
Rossi, T.2
Noè, C.3
Sianesi, A.4
-
22
-
-
0037138854
-
Production-inventory system controller design and supply chain dynamics
-
Riddalls, C., and S. Bennett. 2002. Production-inventory System Controller Design and Supply Chain Dynamics. International Journal of Systems Science 33 (3): 181-195
-
(2002)
International Journal of Systems Science
, vol.33
, Issue.3
, pp. 181-195
-
-
Riddalls, C.1
Bennett, S.2
-
23
-
-
42649097322
-
Developments in russian gas production since 1998: Russia's evolving gas supply strategy
-
Sagers, M. J. 2007. Developments in Russian Gas Production Since 1998: Russia's Evolving Gas Supply Strategy. Eurasian Geography and Economics 48 (6): 651-698
-
(2007)
Eurasian Geography and Economics
, vol.48
, Issue.6
, pp. 651-698
-
-
Sagers, M.J.1
-
24
-
-
16244380766
-
Analysis of supply system models for planning construction project logistics
-
Sobotka, A., and A. Czarnigowska. 2005. Analysis of Supply System Models for Planning Construction Project Logistics. Journal of Civil Engineering and Management 11 (1): 73-82
-
(2005)
Journal of Civil Engineering and Management
, vol.11
, Issue.1
, pp. 73-82
-
-
Sobotka, A.1
Czarnigowska, A.2
-
25
-
-
34047153279
-
What is the limit of chinese coal supplies-A stella model of hubbert peak
-
Tao, Z., and M. Li. 2007. What is the Limit of Chinese Coal Supplies-A STELLA Model of Hubbert Peak. Energy Policy 35: 3145-3154
-
(2007)
Energy Policy
, vol.35
, pp. 3145-3154
-
-
Tao, Z.1
Li, M.2
-
28
-
-
84929139119
-
Disruptions in tightly coupled supply chain networks: The case of the us offshore oil industry
-
Forthcoming
-
Wagner, S. et al. Forthcoming. Disruptions in Tightly Coupled Supply Chain Networks: The Case of the US Offshore Oil Industry. Production Planning & Control
-
Production Planning & Control
-
-
Wagner, S.1
-
29
-
-
32144432328
-
Coping with project dynamics in an interfirm project context
-
Weck, M. 2005. Coping with Project Dynamics in an Interfirm Project Context. Production Planning & Control 16 (4): 396-404
-
(2005)
Production Planning & Control
, vol.16
, Issue.4
, pp. 396-404
-
-
Weck, M.1
-
31
-
-
0036568674
-
Integrating supply chain and critical chain concepts in engineer-procure-construct (epc) projects
-
Yeo, K. T., and J. H. Ning. 2002. Integrating Supply Chain and Critical Chain Concepts in Engineer-procure-construct (EPC) Projects. International Journal of Project Management 20 (4): 253-262
-
(2002)
International Journal of Project Management
, vol.20
, Issue.4
, pp. 253-262
-
-
Yeo, K.T.1
Ning, J.H.2
|