메뉴 건너뛰기




Volumn 24, Issue 1, 2013, Pages 15-27

Sizing off-shore transhipment systems: A case study in maritime dry-bulk transportation

Author keywords

maritime transportation; performance measurement; simulation

Indexed keywords

COST ANALYSIS; EXPECTED EFFECTS; MARITIME TRANSPORTATION; NEIGHBOURHOOD; OFF-SHORE; PERFORMANCE MEASUREMENTS; SERVICE LEVELS; SIMULATION; TRANSHIPMENT; WEATHER CONDITIONS;

EID: 84871348190     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537287.2011.598266     Document Type: Review
Times cited : (5)

References (21)
  • 2
    • 65649099788 scopus 로고    scopus 로고
    • Selecting performance measurement systems: Matching a supply chain's requirements
    • Brun, A., Salama, K.F., and Gerosa, M., 2009. Selecting performance measurement systems: matching a supply chain's requirements. European Journal of Industrial Engineering, 3 (3), 336-362.
    • (2009) European Journal of Industrial Engineering , vol.3 , Issue.3 , pp. 336-362
    • Brun, A.1    Salama, K.F.2    Gerosa, M.3
  • 4
    • 1642304524 scopus 로고    scopus 로고
    • Ship routing and scheduling: Status and perspectives
    • Christiansen, M., Fagerholt, K., and Ronen, D., 2004. Ship routing and scheduling: status and perspectives. Transportation Science, 38 (1), 1-18.
    • (2004) Transportation Science , vol.38 , Issue.1 , pp. 1-18
    • Christiansen, M.1    Fagerholt, K.2    Ronen, D.3
  • 5
    • 45849144407 scopus 로고    scopus 로고
    • Managing facilities under the multi-service result-oriented approach: Some insights coming from the field in Italy
    • Cigolini, R., Fedele, L., and Villa, A.N., 2008. Managing facilities under the multi-service result-oriented approach: some insights coming from the field in Italy. Production Planning and Control, 19 (4), 312-326.
    • (2008) Production Planning and Control , vol.19 , Issue.4 , pp. 312-326
    • Cigolini, R.1    Fedele, L.2    Villa, A.N.3
  • 6
    • 77954054457 scopus 로고    scopus 로고
    • Sizing off-shore transshipment systems in dry-bulk transportation
    • Cigolini, R. and Rossi, T., 2010. Sizing off-shore transshipment systems in dry-bulk transportation. Production Planning and Control, 21 (5), 508-522.
    • (2010) Production Planning and Control , vol.21 , Issue.5 , pp. 508-522
    • Cigolini, R.1    Rossi, T.2
  • 7
    • 0028378348 scopus 로고
    • Petri nets for modeling of dynamical systems: A survey
    • David, R. and Alla, H., 1994. Petri nets for modeling of dynamical systems: a survey. Automatica, 30, 175-202.
    • (1994) Automatica , vol.30 , pp. 175-202
    • David, R.1    Alla, H.2
  • 10
    • 77955276220 scopus 로고    scopus 로고
    • Industrial aspects and literature survey: Fleet composition and routing
    • Hoff, A., et al., 2010. Industrial aspects and literature survey: fleet composition and routing. Computers and Operations Research, 37 (12), 2041-2061.
    • (2010) Computers and Operations Research , vol.37 , Issue.12 , pp. 2041-2061
    • Hoff, A.1
  • 11
    • 0004000208 scopus 로고    scopus 로고
    • Bremen, Germany: Institute of Shipping Economics and Logistics
    • ISL, 2001. Shipping statistics and market review. Bremen, Germany: Institute of Shipping Economics and Logistics.
    • (2001) Shipping Statistics and Market Review
  • 12
    • 34250010370 scopus 로고    scopus 로고
    • Development of performance-based service strategies for the oil and gas industry: A case study
    • Kumar, R. and Markeset, T., 2007. Development of performance-based service strategies for the oil and gas industry: a case study. Journal of Business and Industrial Marketing, 22 (4), 272-280.
    • (2007) Journal of Business and Industrial Marketing , vol.22 , Issue.4 , pp. 272-280
    • Kumar, R.1    Markeset, T.2
  • 13
    • 0034239593 scopus 로고    scopus 로고
    • A coal shipping and blending problem for an electric utility company
    • Liu, C.-M. and Sherali, H.D., 2000. A coal shipping and blending problem for an electric utility company. Omega, 28 (4), 433-444.
    • (2000) Omega , vol.28 , Issue.4 , pp. 433-444
    • Liu, C.-M.1    Sherali, H.D.2
  • 15
    • 77954066278 scopus 로고    scopus 로고
    • International maritime freight movements
    • R.D. Knowels, J. Shaw, and I. Docherty, eds.. London, UK: Blackwell
    • Rodrigue, J.P. and Browne, M., 2008. International maritime freight movements. In: R.D. Knowels, J. Shaw, and I. Docherty, eds. Transport geographies: Mobilities, flows and spaces. London, UK: Blackwell, 156-178.
    • (2008) Transport Geographies: Mobilities, Flows and Spaces , pp. 156-178
    • Rodrigue, J.P.1    Browne, M.2
  • 16
    • 0031238150 scopus 로고    scopus 로고
    • Planning of fuel coal imports using a mixed integer programming method
    • Shih, L.-H., 1997. Planning of fuel coal imports using a mixed integer programming method. International Journal of Production Economics, 51 (3), 243-249.
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 243-249
    • Shih, L.-H.1
  • 17
    • 0032156540 scopus 로고    scopus 로고
    • An analysis of the impact of plant and management variables in a multi-stage, mixed-model production system
    • Sianesi, A., 1998. An analysis of the impact of plant and management variables in a multi-stage, mixed-model production system. International Journal of Production Economics, 56-57 (20), 575-585.
    • (1998) International Journal of Production Economics , vol.56-57 , Issue.20 , pp. 575-585
    • Sianesi, A.1
  • 19
    • 57249101993 scopus 로고    scopus 로고
    • Measuring volatility in the Nordic spot electricity market using recurrence quantification analysis
    • Strozzi, F., et al., 2008. Measuring volatility in the Nordic spot electricity market using recurrence quantification analysis. European Physical Journal - Special topics, 164 (1), 105-115.
    • (2008) European Physical Journal - Special Topics , vol.164 , Issue.1 , pp. 105-115
    • Strozzi, F.1
  • 20
    • 13944255847 scopus 로고    scopus 로고
    • RMCSIM: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truck-mixers
    • Tang, S.L., et al., 2005. RMCSIM: a simulation model of a ready-mixed concrete plant serving multiple sites using multiple truck-mixers. Construction Management and Economics, 23 (1), 15-32.
    • (2005) Construction Management and Economics , vol.23 , Issue.1 , pp. 15-32
    • Tang, S.L.1
  • 21
    • 45849107250 scopus 로고    scopus 로고
    • An integrated facilitydesign model for the generator-manufacturing industry
    • Wang, K.J. and Chen, K.H., 2008. An integrated facilitydesign model for the generator-manufacturing industry. Production Planning and Control, 19 (5), 475-485.
    • (2008) Production Planning and Control , vol.19 , Issue.5 , pp. 475-485
    • Wang, K.J.1    Chen, K.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.