메뉴 건너뛰기




Volumn 85, Issue , 2015, Pages 177-185

Integrated operations scheduling with delivery deadlines

Author keywords

Capacitated supply and distribution operations; Delivery deadlines; Median threshold; Operations scheduling; Partial relaxation

Indexed keywords

CHAINS; COMBINATORIAL OPTIMIZATION; COMPUTATIONAL COMPLEXITY; HEURISTIC ALGORITHMS; OPTIMIZATION; SUPPLY CHAINS;

EID: 84926664704     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2015.03.015     Document Type: Article
Times cited : (14)

References (26)
  • 2
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Z.L. Chen, and G. Vairaktarakis Integrated scheduling of production and distribution operations Operations Research 51 4 2005 614 628
    • (2005) Operations Research , vol.51 , Issue.4 , pp. 614-628
    • Chen, Z.L.1    Vairaktarakis, G.2
  • 3
    • 0023984228 scopus 로고
    • Strategic analysis of integrated production-distribution systems: Models and methods
    • M.A. Cohen, and H.L. Lee Strategic analysis of integrated production-distribution systems: Models and methods Operations Research 36 2 1988 216 228
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 216-228
    • Cohen, M.A.1    Lee, H.L.2
  • 4
    • 33747892893 scopus 로고    scopus 로고
    • LP based heuristics for the multiple knapsack problem with assignment restrictions
    • G. Dahl, and N. Foldnes LP based heuristics for the multiple knapsack problem with assignment restrictions Annuals of Operations Research 146 1 2006 91 104
    • (2006) Annuals of Operations Research , vol.146 , Issue.1 , pp. 91-104
    • Dahl, G.1    Foldnes, N.2
  • 5
    • 0012790087 scopus 로고    scopus 로고
    • Approximation algorithms for the multiple knapsack problems with assignment restrictions
    • M. Dawande, P. Keskinocak, and R. Ravi Approximation algorithms for the multiple knapsack problems with assignment restrictions Journal of Combinatorial Optimization 4 2 2000 171 186
    • (2000) Journal of Combinatorial Optimization , vol.4 , Issue.2 , pp. 171-186
    • Dawande, M.1    Keskinocak, P.2    Ravi, R.3
  • 7
    • 0033339421 scopus 로고    scopus 로고
    • Synchronized development of production, inventory and distribution schedules
    • F. Fumero, and C. Vercellis Synchronized development of production, inventory and distribution schedules Transportation Science 33 3 1999 330 340
    • (1999) Transportation Science , vol.33 , Issue.3 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 8
    • 79251630709 scopus 로고    scopus 로고
    • Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry
    • J. Gaudreault, J.-M. Frayret, A. Rousseau, and S. D'Amours Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry Computer & Operations Research 38 9 2011 1238 1250
    • (2011) Computer & Operations Research , vol.38 , Issue.9 , pp. 1238-1250
    • Gaudreault, J.1    Frayret, J.-M.2    Rousseau, A.3    D'Amours, S.4
  • 10
    • 56749181191 scopus 로고    scopus 로고
    • Combined make-to-order/make-to-stock supply chains
    • P. Kaminsky, and O. Kaya Combined make-to-order/make-to-stock supply chains IIE Transactions 41 2009 103 119
    • (2009) IIE Transactions , vol.41 , pp. 103-119
    • Kaminsky, P.1    Kaya, O.2
  • 12
    • 5644303213 scopus 로고    scopus 로고
    • Planning and scheduling in supply chains: An overview of issues in practice
    • S. Kreipl, and M. Pinedo Planning and scheduling in supply chains: An overview of issues in practice Production and Operations Management 51 1 2004 77 92
    • (2004) Production and Operations Management , vol.51 , Issue.1 , pp. 77-92
    • Kreipl, S.1    Pinedo, M.2
  • 13
    • 33748291359 scopus 로고    scopus 로고
    • Scheduling logistic activities to improve hospital supply systems
    • S.D. Lapierrea, and A.B. Ruizb Scheduling logistic activities to improve hospital supply systems Computer & Operations Research 34 2 2007 624 641
    • (2007) Computer & Operations Research , vol.34 , Issue.2 , pp. 624-641
    • Lapierrea, S.D.1    Ruizb, A.B.2
  • 14
    • 33748518397 scopus 로고    scopus 로고
    • On the integrated production, inventory, and distribution routing problem
    • L. Lei, S. Liu, A. Ruszczynski, and S. Park On the integrated production, inventory, and distribution routing problem IIE Transactions 38 3 2006 955 970
    • (2006) IIE Transactions , vol.38 , Issue.3 , pp. 955-970
    • Lei, L.1    Liu, S.2    Ruszczynski, A.3    Park, S.4
  • 15
    • 84887923643 scopus 로고    scopus 로고
    • Novel multi-objective resource allocation and activity scheduling for fourth party logistics
    • Q. Liu, C.Y. Zhang, K.R. Zhu, and Y.Q. Rao Novel multi-objective resource allocation and activity scheduling for fourth party logistics Computer & Operations Research 44 4 2014 42 51
    • (2014) Computer & Operations Research , vol.44 , Issue.4 , pp. 42-51
    • Liu, Q.1    Zhang, C.Y.2    Zhu, K.R.3    Rao, Y.Q.4
  • 16
    • 33845300872 scopus 로고    scopus 로고
    • Coordinating production and distribution of jobs with bundling operations
    • C.L. Li, and G. Vairaktarakis Coordinating production and distribution of jobs with bundling operations IIE Transactions 39 2 2007 203 215
    • (2007) IIE Transactions , vol.39 , Issue.2 , pp. 203-215
    • Li, C.L.1    Vairaktarakis, G.2
  • 17
    • 80053361665 scopus 로고    scopus 로고
    • Coordination in a two-stage production system: Complexity, conflict and cooperation
    • U.V. Manoj, C. Sriskandarajah, and E. Wagneur Coordination in a two-stage production system: Complexity, conflict and cooperation Computer & Operations Research 39 6 2012 1245 1256
    • (2012) Computer & Operations Research , vol.39 , Issue.6 , pp. 1245-1256
    • Manoj, U.V.1    Sriskandarajah, C.2    Wagneur, E.3
  • 18
    • 84875194263 scopus 로고    scopus 로고
    • Scheduling with an outsourcing option on both manufacturer and subcontractors
    • H. Mokhtari, and I.N. Abadi Scheduling with an outsourcing option on both manufacturer and subcontractors Computer & Operations Research 40 5 2013 1234 1242
    • (2013) Computer & Operations Research , vol.40 , Issue.5 , pp. 1234-1242
    • Mokhtari, H.1    Abadi, I.N.2
  • 19
    • 84875439215 scopus 로고    scopus 로고
    • Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains
    • M. Rasti-Barzoki, and R.S. Hejazi Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries for multiple customers in supply chains European Journal of Operational Research 228 2 2013 345 357
    • (2013) European Journal of Operational Research , vol.228 , Issue.2 , pp. 345-357
    • Rasti-Barzoki, M.1    Hejazi, R.S.2
  • 20
    • 0000357936 scopus 로고    scopus 로고
    • A class of greedy Algorithms for the generalized assignment problem
    • H.E. Romeijin, and D.R. Morales A class of greedy Algorithms for the generalized assignment problem Discrete Applied Mathematics 103 2 2000 209 235
    • (2000) Discrete Applied Mathematics , vol.103 , Issue.2 , pp. 209-235
    • Romeijin, H.E.1    Morales, D.R.2
  • 21
    • 67651187320 scopus 로고    scopus 로고
    • Monolithic versus hierarchical approach to integrated scheduling in a supply chain
    • T. Sawik Monolithic versus hierarchical approach to integrated scheduling in a supply chain International Journal of Production Research 47 21 2009 5881 5910
    • (2009) International Journal of Production Research , vol.47 , Issue.21 , pp. 5881-5910
    • Sawik, T.1
  • 23
    • 0026835392 scopus 로고
    • A linear relaxation heuristic for the generalized assignment problem
    • M.A. Trick A linear relaxation heuristic for the generalized assignment problem Naval Research Logistics 39 2 1992 137 151
    • (1992) Naval Research Logistics , vol.39 , Issue.2 , pp. 137-151
    • Trick, M.A.1
  • 24
    • 84862792192 scopus 로고    scopus 로고
    • Polynomial-time solvable cases of the capacitated multi-echelon shipping network scheduling problem with delivery deadlines
    • G. Wang, and L. Lei Polynomial-time solvable cases of the capacitated multi-echelon shipping network scheduling problem with delivery deadlines International Journal of Production Economics 2 137 2012 263 271
    • (2012) International Journal of Production Economics , vol.2 , Issue.137 , pp. 263-271
    • Wang, G.1    Lei, L.2
  • 25
    • 70349280458 scopus 로고    scopus 로고
    • Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
    • S.H. Zegordi, and M.A. Nia Integrating production and transportation scheduling in a two-stage supply chain considering order assignment International Journal of Advanced Manufacturing Technology 44 9-10 2009 928 939
    • (2009) International Journal of Advanced Manufacturing Technology , vol.44 , Issue.910 , pp. 928-939
    • Zegordi, S.H.1    Nia, M.A.2
  • 26
    • 75949096409 scopus 로고    scopus 로고
    • Integrated production and distribution scheduling with committed delivery dates
    • W.Y. Zhong, Z.L. Chen, and M. Chen Integrated production and distribution scheduling with committed delivery dates Operations Research Letters 38 2 2010 133 138
    • (2010) Operations Research Letters , vol.38 , Issue.2 , pp. 133-138
    • Zhong, W.Y.1    Chen, Z.L.2    Chen, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.