메뉴 건너뛰기




Volumn 44, Issue 9-10, 2009, Pages 928-939

Integrating production and transportation scheduling in a two-stage supply chain considering order assignment

Author keywords

Genetic algorithm; Makespan; Scheduling; Supply chain management; Transportation

Indexed keywords

CPU TIME; DIFFERENT SPEED; DYNAMIC GENETIC ALGORITHMS; GEOGRAPHIC ZONES; MAKESPAN; MANUFACTURING COMPANIES; MIXED INTEGER PROGRAMMING; OPTIMUM SOLUTION; ORDER ASSIGNMENT; RANDOM SEARCH APPROACH; TRANSPORTATION CAPACITY; TWO STAGE; VEHICLE SIZE;

EID: 70349280458     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-008-1910-x     Document Type: Article
Times cited : (21)

References (33)
  • 1
    • 2642510666 scopus 로고    scopus 로고
    • Machine scheduling with job delivery coordination
    • Y Chang C Lee 2004 Machine scheduling with job delivery coordination Eur J Oper Res 158 470 487
    • (2004) Eur J Oper Res , vol.158 , pp. 470-487
    • Chang, Y.1    Lee, C.2
  • 2
    • 33646094727 scopus 로고    scopus 로고
    • Batch scheduling in a two-level supply chain-a focus on the supplier
    • E Selvarajah G Steiner 2006 Batch scheduling in a two-level supply chain-a focus on the supplier Eur J Oper Res 173 226 240
    • (2006) Eur J Oper Res , vol.173 , pp. 226-240
    • Selvarajah, E.1    Steiner, G.2
  • 3
    • 0041760308 scopus 로고    scopus 로고
    • Coordinated supply chain management
    • DJ Thomas PM Griffin 1996 Coordinated supply chain management Eur J Oper Res 94 1 15
    • (1996) Eur J Oper Res , vol.94 , pp. 1-15
    • Thomas, D.J.1    Griffin, P.M.2
  • 4
    • 0031124354 scopus 로고    scopus 로고
    • A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
    • G Ulusoy F Sivrikaya-Serifoglu U Bilge 1997 A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles Comput Oper Res 24 335 351
    • (1997) Comput Oper Res , vol.24 , pp. 335-351
    • Ulusoy, G.1    Sivrikaya-Serifoglu, F.2    Bilge, U.3
  • 6
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • YH Lee CJ Jeong C Moon 2002 Advanced planning and scheduling with outsourcing in manufacturing supply chain Comput Ind Eng 43 351 374
    • (2002) Comput Ind Eng , vol.43 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.J.2    Moon, C.3
  • 7
    • 0036642688 scopus 로고    scopus 로고
    • Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
    • C Moon J Kim S Hur 2002 Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain Comput Ind Eng 43 331 349
    • (2002) Comput Ind Eng , vol.43 , pp. 331-349
    • Moon, C.1    Kim, J.2    Hur, S.3
  • 8
    • 0038112232 scopus 로고    scopus 로고
    • Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry
    • MG Gnoni R Iavagnilio G Mossa 2003 Production planning of a multi-site manufacturing system by hybrid modelling: a case study from the automotive industry Int J Prod Econ 85 251 262
    • (2003) Int J Prod Econ , vol.85 , pp. 251-262
    • Gnoni, M.G.1    Iavagnilio, R.2    Mossa, G.3
  • 9
    • 1842843006 scopus 로고    scopus 로고
    • Coordinated scheduling of production and delivery from multiple plants
    • JM Garcia S Lozano D Canca 2004 Coordinated scheduling of production and delivery from multiple plants Robot Comput-Integr Manuf 20 191 198
    • (2004) Robot Comput-Integr Manuf , vol.20 , pp. 191-198
    • Garcia, J.M.1    Lozano, S.2    Canca, D.3
  • 10
    • 1942468138 scopus 로고    scopus 로고
    • A bilevel programming framework for enterprise-wide process networks under uncertainty
    • J Ryu V Dua EN Pistikopoulos 2004 A bilevel programming framework for enterprise-wide process networks under uncertainty Comput Chem Eng 28 1121 1129
    • (2004) Comput Chem Eng , vol.28 , pp. 1121-1129
    • Ryu, J.1    Dua, V.2    Pistikopoulos, E.N.3
  • 11
    • 1242276150 scopus 로고    scopus 로고
    • Supply chain optimization in the pulp mill industry-IP models' column generation and novel constraint branches
    • D Bredstrom JT Lundgren M Ronnqvist 2004 Supply chain optimization in the pulp mill industry-IP models' column generation and novel constraint branches Eur J Oper Res 156 2 22
    • (2004) Eur J Oper Res , vol.156 , pp. 2-22
    • Bredstrom, D.1    Lundgren, J.T.2    Ronnqvist, M.3
  • 12
    • 2342644130 scopus 로고    scopus 로고
    • Improving the logistics of multi-compartment chemical tankers
    • AS Jetlund IA Karimi 2004 Improving the logistics of multi-compartment chemical tankers Comput Chem Eng 28 1267 1283
    • (2004) Comput Chem Eng , vol.28 , pp. 1267-1283
    • Jetlund, A.S.1    Karimi, I.A.2
  • 13
    • 1942500455 scopus 로고    scopus 로고
    • Integrating collaborative planning and supply chain optimization for the chemical process industry (I)-methodology
    • G Berning M Brandenburg K Gürsoy 2004 Integrating collaborative planning and supply chain optimization for the chemical process industry (I)-methodology Comput Chem Eng 28 913 927
    • (2004) Comput Chem Eng , vol.28 , pp. 913-927
    • Berning, G.1    Brandenburg, M.2    Gürsoy, K.3
  • 14
    • 23144438123 scopus 로고    scopus 로고
    • Optimization-based scheduling: A discrete manufacturing case study
    • MC Georgiadis AA Levis P Tsiakis 2005 Optimization-based scheduling: a discrete manufacturing case study Comput Ind Eng 49 118 145
    • (2005) Comput Ind Eng , vol.49 , pp. 118-145
    • Georgiadis, M.C.1    Levis, A.A.2    Tsiakis, P.3
  • 15
    • 19944400423 scopus 로고    scopus 로고
    • Responding to schedule changes in build-to-order supply chains
    • L Krajewski JC Wei L Tang 2005 Responding to schedule changes in build-to-order supply chains J Oper Manag 23 452 469
    • (2005) J Oper Manag , vol.23 , pp. 452-469
    • Krajewski, L.1    Wei, J.C.2    Tang, L.3
  • 16
    • 22144475484 scopus 로고    scopus 로고
    • An adaptive genetic algorithm with dominated genes for distributed scheduling problems
    • FTS Chan SH Chung PLY Chan 2005 An adaptive genetic algorithm with dominated genes for distributed scheduling problems Expert Syst Appl 29 364 371
    • (2005) Expert Syst Appl , vol.29 , pp. 364-371
    • Chan, F.T.S.1    Chung, S.H.2    Chan, P.L.Y.3
  • 17
    • 33745864880 scopus 로고    scopus 로고
    • Generating Pareto schedules with outsource and internal parallel resources
    • AJ Ruiz-Torres JC Ho FJ Lopez 2006 Generating Pareto schedules with outsource and internal parallel resources Int J Prod Econ 103 810 825
    • (2006) Int J Prod Econ , vol.103 , pp. 810-825
    • Ruiz-Torres, A.J.1    Ho, J.C.2    Lopez, F.J.3
  • 18
    • 33748920331 scopus 로고    scopus 로고
    • Integrated production and material handling scheduling using mathematical programming and constraint programming
    • GE Khayat A Langevin D Riopel 2006 Integrated production and material handling scheduling using mathematical programming and constraint programming Eur J Oper Res 175 1818 1832
    • (2006) Eur J Oper Res , vol.175 , pp. 1818-1832
    • Khayat, G.E.1    Langevin, A.2    Riopel, D.3
  • 19
    • 33748430982 scopus 로고    scopus 로고
    • A variable neighborhood decomposition search method for supply chain management planning problems
    • MA Lejeune 2006 A variable neighborhood decomposition search method for supply chain management planning problems Eur J Oper Res 175 959 976
    • (2006) Eur J Oper Res , vol.175 , pp. 959-976
    • Lejeune, M.A.1
  • 21
    • 33847288279 scopus 로고    scopus 로고
    • On-line supply chain scheduling problems with preemption
    • I Averbakh Z Xue 2007 On-line supply chain scheduling problems with preemption Eur J Oper Res 181 500 504
    • (2007) Eur J Oper Res , vol.181 , pp. 500-504
    • Averbakh, I.1    Xue, Z.2
  • 22
    • 33645504623 scopus 로고    scopus 로고
    • Hybrid approach to distribution planning reflecting a stochastic supply chain
    • SJ Lim SJ Jeong KS Kim 2006 Hybrid approach to distribution planning reflecting a stochastic supply chain Int J Adv Manuf Technol 28 618 625
    • (2006) Int J Adv Manuf Technol , vol.28 , pp. 618-625
    • Lim, S.J.1    Jeong, S.J.2    Kim, K.S.3
  • 23
    • 41449093762 scopus 로고    scopus 로고
    • Integrated process planning and scheduling in a supply chain
    • C Moon YH Lee CS Jeong 2007 Integrated process planning and scheduling in a supply chain Comput Ind Eng 54 1048 1061
    • (2007) Comput Ind Eng , vol.54 , pp. 1048-1061
    • Moon, C.1    Lee, Y.H.2    Jeong, C.S.3
  • 24
    • 34447503493 scopus 로고    scopus 로고
    • A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line
    • T Nishi M Konishi M Ago 2007 A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line Comput Chem Eng 31 1205 1221
    • (2007) Comput Chem Eng , vol.31 , pp. 1205-1221
    • Nishi, T.1    Konishi, M.2    Ago, M.3
  • 25
    • 34248155868 scopus 로고    scopus 로고
    • A probabilistic bi-level linear multi-objective programming problem to supply chain planning
    • E Roghanian SJ Sadjadi MB Aryanezhad 2007 A probabilistic bi-level linear multi-objective programming problem to supply chain planning Appl Math Comput 188 786 800
    • (2007) Appl Math Comput , vol.188 , pp. 786-800
    • Roghanian, E.1    Sadjadi, S.J.2    Aryanezhad, M.B.3
  • 26
    • 33750706574 scopus 로고    scopus 로고
    • Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete
    • D Naso M Surico B Turchiano 2007 Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete Eur J Oper Res 177 2069 2099
    • (2007) Eur J Oper Res , vol.177 , pp. 2069-2099
    • Naso, D.1    Surico, M.2    Turchiano, B.3
  • 27
    • 34247532297 scopus 로고    scopus 로고
    • Modeling and optimizing transportation decisions in a manufacturing supply chain
    • S Karabuk 2007 Modeling and optimizing transportation decisions in a manufacturing supply chain Transp Res Part E 43 321 337
    • (2007) Transp Res Part e , vol.43 , pp. 321-337
    • Karabuk, S.1
  • 29
    • 33748265082 scopus 로고    scopus 로고
    • Scheduling in an assembly-type production chain with batch transfer
    • BMT Lin TCE Cheng ASC Chou 2007 Scheduling in an assembly-type production chain with batch transfer Omega 35 143 151
    • (2007) Omega , vol.35 , pp. 143-151
    • Lin, B.M.T.1    Cheng, T.C.E.2    Chou, A.S.C.3
  • 30
    • 42449112907 scopus 로고    scopus 로고
    • Integrated supply chain design using multi-criteria optimization
    • HA ElMaraghy R Majety 2008 Integrated supply chain design using multi-criteria optimization Int J Adv Manuf Technol 37 371 399
    • (2008) Int J Adv Manuf Technol , vol.37 , pp. 371-399
    • Elmaraghy, H.A.1    Majety, R.2
  • 31
    • 45749103167 scopus 로고    scopus 로고
    • An extended state task network formulation for integrated production-distribution planning in supply chain
    • S Su D Zhan X Xu 2008 An extended state task network formulation for integrated production-distribution planning in supply chain Int J Adv Manuf Technol 37 1232 1249
    • (2008) Int J Adv Manuf Technol , vol.37 , pp. 1232-1249
    • Su, S.1    Zhan, D.2    Xu, X.3
  • 32
    • 25144444242 scopus 로고    scopus 로고
    • Flexible flow shop scheduling with uniform parallel machines
    • GJ Kyparisis C Koulamas 2006 Flexible flow shop scheduling with uniform parallel machines Eur J Oper Res 168 985 997
    • (2006) Eur J Oper Res , vol.168 , pp. 985-997
    • Kyparisis, G.J.1    Koulamas, C.2
  • 33
    • 70349265920 scopus 로고    scopus 로고
    • Wiley New York
    • Falkenauer E (1998) Genetic algorithms for grouping problems. Wiley, New York
    • (1998)
    • Falkenauer, E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.