-
1
-
-
2642510666
-
Machine scheduling with job delivery coordination
-
Y Chang C Lee 2004 Machine scheduling with job delivery coordination Eur J Oper Res 158 470 487
-
(2004)
Eur J Oper Res
, vol.158
, pp. 470-487
-
-
Chang, Y.1
Lee, C.2
-
2
-
-
33646094727
-
Batch scheduling in a two-level supply chain-a focus on the supplier
-
E Selvarajah G Steiner 2006 Batch scheduling in a two-level supply chain-a focus on the supplier Eur J Oper Res 173 226 240
-
(2006)
Eur J Oper Res
, vol.173
, pp. 226-240
-
-
Selvarajah, E.1
Steiner, G.2
-
4
-
-
0031124354
-
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
-
G Ulusoy F Sivrikaya-Serifoglu U Bilge 1997 A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles Comput Oper Res 24 335 351
-
(1997)
Comput Oper Res
, vol.24
, pp. 335-351
-
-
Ulusoy, G.1
Sivrikaya-Serifoglu, F.2
Bilge, U.3
-
6
-
-
0036642595
-
Advanced planning and scheduling with outsourcing in manufacturing supply chain
-
YH Lee CJ Jeong C Moon 2002 Advanced planning and scheduling with outsourcing in manufacturing supply chain Comput Ind Eng 43 351 374
-
(2002)
Comput Ind Eng
, vol.43
, pp. 351-374
-
-
Lee, Y.H.1
Jeong, C.J.2
Moon, C.3
-
7
-
-
0036642688
-
Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
-
C Moon J Kim S Hur 2002 Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain Comput Ind Eng 43 331 349
-
(2002)
Comput Ind Eng
, vol.43
, pp. 331-349
-
-
Moon, C.1
Kim, J.2
Hur, S.3
-
8
-
-
0038112232
-
Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry
-
MG Gnoni R Iavagnilio G Mossa 2003 Production planning of a multi-site manufacturing system by hybrid modelling: a case study from the automotive industry Int J Prod Econ 85 251 262
-
(2003)
Int J Prod Econ
, vol.85
, pp. 251-262
-
-
Gnoni, M.G.1
Iavagnilio, R.2
Mossa, G.3
-
9
-
-
1842843006
-
Coordinated scheduling of production and delivery from multiple plants
-
JM Garcia S Lozano D Canca 2004 Coordinated scheduling of production and delivery from multiple plants Robot Comput-Integr Manuf 20 191 198
-
(2004)
Robot Comput-Integr Manuf
, vol.20
, pp. 191-198
-
-
Garcia, J.M.1
Lozano, S.2
Canca, D.3
-
10
-
-
1942468138
-
A bilevel programming framework for enterprise-wide process networks under uncertainty
-
J Ryu V Dua EN Pistikopoulos 2004 A bilevel programming framework for enterprise-wide process networks under uncertainty Comput Chem Eng 28 1121 1129
-
(2004)
Comput Chem Eng
, vol.28
, pp. 1121-1129
-
-
Ryu, J.1
Dua, V.2
Pistikopoulos, E.N.3
-
11
-
-
1242276150
-
Supply chain optimization in the pulp mill industry-IP models' column generation and novel constraint branches
-
D Bredstrom JT Lundgren M Ronnqvist 2004 Supply chain optimization in the pulp mill industry-IP models' column generation and novel constraint branches Eur J Oper Res 156 2 22
-
(2004)
Eur J Oper Res
, vol.156
, pp. 2-22
-
-
Bredstrom, D.1
Lundgren, J.T.2
Ronnqvist, M.3
-
12
-
-
2342644130
-
Improving the logistics of multi-compartment chemical tankers
-
AS Jetlund IA Karimi 2004 Improving the logistics of multi-compartment chemical tankers Comput Chem Eng 28 1267 1283
-
(2004)
Comput Chem Eng
, vol.28
, pp. 1267-1283
-
-
Jetlund, A.S.1
Karimi, I.A.2
-
13
-
-
1942500455
-
Integrating collaborative planning and supply chain optimization for the chemical process industry (I)-methodology
-
G Berning M Brandenburg K Gürsoy 2004 Integrating collaborative planning and supply chain optimization for the chemical process industry (I)-methodology Comput Chem Eng 28 913 927
-
(2004)
Comput Chem Eng
, vol.28
, pp. 913-927
-
-
Berning, G.1
Brandenburg, M.2
Gürsoy, K.3
-
14
-
-
23144438123
-
Optimization-based scheduling: A discrete manufacturing case study
-
MC Georgiadis AA Levis P Tsiakis 2005 Optimization-based scheduling: a discrete manufacturing case study Comput Ind Eng 49 118 145
-
(2005)
Comput Ind Eng
, vol.49
, pp. 118-145
-
-
Georgiadis, M.C.1
Levis, A.A.2
Tsiakis, P.3
-
15
-
-
19944400423
-
Responding to schedule changes in build-to-order supply chains
-
L Krajewski JC Wei L Tang 2005 Responding to schedule changes in build-to-order supply chains J Oper Manag 23 452 469
-
(2005)
J Oper Manag
, vol.23
, pp. 452-469
-
-
Krajewski, L.1
Wei, J.C.2
Tang, L.3
-
16
-
-
22144475484
-
An adaptive genetic algorithm with dominated genes for distributed scheduling problems
-
FTS Chan SH Chung PLY Chan 2005 An adaptive genetic algorithm with dominated genes for distributed scheduling problems Expert Syst Appl 29 364 371
-
(2005)
Expert Syst Appl
, vol.29
, pp. 364-371
-
-
Chan, F.T.S.1
Chung, S.H.2
Chan, P.L.Y.3
-
17
-
-
33745864880
-
Generating Pareto schedules with outsource and internal parallel resources
-
AJ Ruiz-Torres JC Ho FJ Lopez 2006 Generating Pareto schedules with outsource and internal parallel resources Int J Prod Econ 103 810 825
-
(2006)
Int J Prod Econ
, vol.103
, pp. 810-825
-
-
Ruiz-Torres, A.J.1
Ho, J.C.2
Lopez, F.J.3
-
18
-
-
33748920331
-
Integrated production and material handling scheduling using mathematical programming and constraint programming
-
GE Khayat A Langevin D Riopel 2006 Integrated production and material handling scheduling using mathematical programming and constraint programming Eur J Oper Res 175 1818 1832
-
(2006)
Eur J Oper Res
, vol.175
, pp. 1818-1832
-
-
Khayat, G.E.1
Langevin, A.2
Riopel, D.3
-
19
-
-
33748430982
-
A variable neighborhood decomposition search method for supply chain management planning problems
-
MA Lejeune 2006 A variable neighborhood decomposition search method for supply chain management planning problems Eur J Oper Res 175 959 976
-
(2006)
Eur J Oper Res
, vol.175
, pp. 959-976
-
-
Lejeune, M.A.1
-
21
-
-
33847288279
-
On-line supply chain scheduling problems with preemption
-
I Averbakh Z Xue 2007 On-line supply chain scheduling problems with preemption Eur J Oper Res 181 500 504
-
(2007)
Eur J Oper Res
, vol.181
, pp. 500-504
-
-
Averbakh, I.1
Xue, Z.2
-
22
-
-
33645504623
-
Hybrid approach to distribution planning reflecting a stochastic supply chain
-
SJ Lim SJ Jeong KS Kim 2006 Hybrid approach to distribution planning reflecting a stochastic supply chain Int J Adv Manuf Technol 28 618 625
-
(2006)
Int J Adv Manuf Technol
, vol.28
, pp. 618-625
-
-
Lim, S.J.1
Jeong, S.J.2
Kim, K.S.3
-
23
-
-
41449093762
-
Integrated process planning and scheduling in a supply chain
-
C Moon YH Lee CS Jeong 2007 Integrated process planning and scheduling in a supply chain Comput Ind Eng 54 1048 1061
-
(2007)
Comput Ind Eng
, vol.54
, pp. 1048-1061
-
-
Moon, C.1
Lee, Y.H.2
Jeong, C.S.3
-
24
-
-
34447503493
-
A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line
-
T Nishi M Konishi M Ago 2007 A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line Comput Chem Eng 31 1205 1221
-
(2007)
Comput Chem Eng
, vol.31
, pp. 1205-1221
-
-
Nishi, T.1
Konishi, M.2
Ago, M.3
-
25
-
-
34248155868
-
A probabilistic bi-level linear multi-objective programming problem to supply chain planning
-
E Roghanian SJ Sadjadi MB Aryanezhad 2007 A probabilistic bi-level linear multi-objective programming problem to supply chain planning Appl Math Comput 188 786 800
-
(2007)
Appl Math Comput
, vol.188
, pp. 786-800
-
-
Roghanian, E.1
Sadjadi, S.J.2
Aryanezhad, M.B.3
-
26
-
-
33750706574
-
Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete
-
D Naso M Surico B Turchiano 2007 Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete Eur J Oper Res 177 2069 2099
-
(2007)
Eur J Oper Res
, vol.177
, pp. 2069-2099
-
-
Naso, D.1
Surico, M.2
Turchiano, B.3
-
27
-
-
34247532297
-
Modeling and optimizing transportation decisions in a manufacturing supply chain
-
S Karabuk 2007 Modeling and optimizing transportation decisions in a manufacturing supply chain Transp Res Part E 43 321 337
-
(2007)
Transp Res Part e
, vol.43
, pp. 321-337
-
-
Karabuk, S.1
-
29
-
-
33748265082
-
Scheduling in an assembly-type production chain with batch transfer
-
BMT Lin TCE Cheng ASC Chou 2007 Scheduling in an assembly-type production chain with batch transfer Omega 35 143 151
-
(2007)
Omega
, vol.35
, pp. 143-151
-
-
Lin, B.M.T.1
Cheng, T.C.E.2
Chou, A.S.C.3
-
30
-
-
42449112907
-
Integrated supply chain design using multi-criteria optimization
-
HA ElMaraghy R Majety 2008 Integrated supply chain design using multi-criteria optimization Int J Adv Manuf Technol 37 371 399
-
(2008)
Int J Adv Manuf Technol
, vol.37
, pp. 371-399
-
-
Elmaraghy, H.A.1
Majety, R.2
-
31
-
-
45749103167
-
An extended state task network formulation for integrated production-distribution planning in supply chain
-
S Su D Zhan X Xu 2008 An extended state task network formulation for integrated production-distribution planning in supply chain Int J Adv Manuf Technol 37 1232 1249
-
(2008)
Int J Adv Manuf Technol
, vol.37
, pp. 1232-1249
-
-
Su, S.1
Zhan, D.2
Xu, X.3
-
32
-
-
25144444242
-
Flexible flow shop scheduling with uniform parallel machines
-
GJ Kyparisis C Koulamas 2006 Flexible flow shop scheduling with uniform parallel machines Eur J Oper Res 168 985 997
-
(2006)
Eur J Oper Res
, vol.168
, pp. 985-997
-
-
Kyparisis, G.J.1
Koulamas, C.2
-
33
-
-
70349265920
-
-
Wiley New York
-
Falkenauer E (1998) Genetic algorithms for grouping problems. Wiley, New York
-
(1998)
-
-
Falkenauer, E.1
|