메뉴 건너뛰기




Volumn 161, Issue , 2015, Pages 83-95

Modeling and solving the mixed-model sequencing problem to improve productivity

Author keywords

Linear programming; Manufacturing; Mixed model system; MMSP W with work pace factor; Sequencing; Work overload

Indexed keywords

FUNCTIONS; LINEAR PROGRAMMING; MANUFACTURE;

EID: 84921788671     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2014.11.018     Document Type: Article
Times cited : (23)

References (30)
  • 1
    • 84921795958 scopus 로고    scopus 로고
    • Measurement of work
    • fifth ed. McGraw-Hill, New York
    • Aft, L.S., 2001. Measurement of work. In: Maynard's Industrial Engineering Handbook, fifth ed. McGraw-Hill, New York, pp. 5.3-5.22.
    • (2001) Maynard's Industrial Engineering Handbook , pp. 53-522
    • Aft, L.S.1
  • 2
    • 0031238178 scopus 로고    scopus 로고
    • A parametric procedure for multcriterion sequence scheduling for just-in-time mixed-model assembly lines
    • H. Aigbedo, and Y. Monden A parametric procedure for multcriterion sequence scheduling for just-in-time mixed-model assembly lines Int. J. Prod. Res. 35/9 1997 2543 2564
    • (1997) Int. J. Prod. Res. , vol.359 , pp. 2543-2564
    • Aigbedo, H.1    Monden, Y.2
  • 3
    • 38749123964 scopus 로고    scopus 로고
    • Minimizing work overload in mixed-model assembly lines
    • J. Bautista, and J. Cano Minimizing work overload in mixed-model assembly lines Int. J. Prod. Econ. 112/1 2008 177 191
    • (2008) Int. J. Prod. Econ. , vol.1121 , pp. 177-191
    • Bautista, J.1    Cano, J.2
  • 4
    • 38349129725 scopus 로고    scopus 로고
    • A beam search approach for the optimization version of the car sequencing problem
    • J. Bautista, J. Pereira, and B. Adenso-Díaz A beam search approach for the optimization version of the car sequencing problem Ann. Oper. Res. 159/1 2008 233 244
    • (2008) Ann. Oper. Res. , vol.1591 , pp. 233-244
    • Bautista, J.1    Pereira, J.2    Adenso-Díaz, B.3
  • 5
    • 38349134571 scopus 로고    scopus 로고
    • A GRASP approach for the extended car sequencing problem
    • J. Bautista, J. Pereira, and B. Adenso-Díaz A GRASP approach for the extended car sequencing problem J. Scheduling 11/1 2008 3 16
    • (2008) J. Scheduling , vol.111 , pp. 3-16
    • Bautista, J.1    Pereira, J.2    Adenso-Díaz, B.3
  • 6
    • 79151476061 scopus 로고    scopus 로고
    • Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules
    • J. Bautista, and A. Cano Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules Eur. J. Oper. Res. 210/3 2011 495 513
    • (2011) Eur. J. Oper. Res. , vol.2103 , pp. 495-513
    • Bautista, J.1    Cano, A.2
  • 7
    • 84861187828 scopus 로고    scopus 로고
    • Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant
    • J. Bautista, A. Cano, and R. Alfaro Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints. An application in Nissan's Barcelona Plant Expert Syst. Appl. 39/12 2012 11001 11010
    • (2012) Expert Syst. Appl. , vol.3912 , pp. 11001-11010
    • Bautista, J.1    Cano, A.2    Alfaro, R.3
  • 9
    • 84864750347 scopus 로고    scopus 로고
    • Solving the Fm|block|Cmax problem using bounded dynamic programming
    • J. Bautista, A. Cano, R. Companys, and I. Ribas Solving the Fm|block|Cmax problem using bounded dynamic programming Eng. Appl. Artif. Intell. 25/6 2012 1235 1245
    • (2012) Eng. Appl. Artif. Intell. , vol.256 , pp. 1235-1245
    • Bautista, J.1    Cano, A.2    Companys, R.3    Ribas, I.4
  • 10
    • 84866403100 scopus 로고    scopus 로고
    • Models for MMSP-W considering workstation dependencies: A case study of Nissan's Barcelona plant
    • J. Bautista, A. Cano, and R. Alfaro Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant Eur. J. Oper. Res. 223/3 2012 669 679
    • (2012) Eur. J. Oper. Res. , vol.2233 , pp. 669-679
    • Bautista, J.1    Cano, A.2    Alfaro, R.3
  • 12
    • 0026933958 scopus 로고
    • Scheduling algorithms to minimize utility work at a single station on paced assembly line
    • A. Bolat, and C.A. Yano Scheduling algorithms to minimize utility work at a single station on paced assembly line Prod. Plann. Control Manage. Oper. 3/4 1992 393 405
    • (1992) Prod. Plann. Control Manage. Oper. , vol.34 , pp. 393-405
    • Bolat, A.1    Yano, C.A.2
  • 13
    • 0242333126 scopus 로고    scopus 로고
    • A mathematical model for sequencing mixed models with due dates
    • A. Bolat A mathematical model for sequencing mixed models with due dates Int. J. Prod. Res. 41 5 2003 897 918
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.5 , pp. 897-918
    • Bolat, A.1
  • 14
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • N. Boysen, M. Fliedner, and A. Scholl Sequencing mixed-model assembly lines: survey, classification and model critique Eur. J. Oper. Res. 192 2 2009 349 373
    • (2009) Eur. J. Oper. Res. , vol.192 , Issue.2 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 15
    • 33644861570 scopus 로고    scopus 로고
    • Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
    • F.-Y. Ding, J. Zhu, and H. Sun Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives Int. J. Prod. Econ. 102/1 2006 108 131
    • (2006) Int. J. Prod. Econ. , vol.1021 , pp. 108-131
    • Ding, F.-Y.1    Zhu, J.2    Sun, H.3
  • 16
    • 33646399781 scopus 로고    scopus 로고
    • Algorithms for the car sequencing and the level scheduling problem
    • A. Drexl, A. Kimms, and L. Matthiessen Algorithms for the car sequencing and the level scheduling problem J. Scheduling 9 2006 153 176
    • (2006) J. Scheduling , vol.9 , pp. 153-176
    • Drexl, A.1    Kimms, A.2    Matthiessen, L.3
  • 17
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • S.E. Elmaghraby The economic lot scheduling problem (ELSP): review and extensions Manage. Sci. 24/6 1978 587 598
    • (1978) Manage. Sci. , vol.246 , pp. 587-598
    • Elmaghraby, S.E.1
  • 18
    • 35148893754 scopus 로고    scopus 로고
    • Mixed-model assembly line sequencing using beam search
    • E. Erel, Y. Gocgun, and I. Sabuncuoglu Mixed-model assembly line sequencing using beam search Int. J. Prod. Res. 45/22 2007 5265 5284
    • (2007) Int. J. Prod. Res. , vol.4522 , pp. 5265-5284
    • Erel, E.1    Gocgun, Y.2    Sabuncuoglu, I.3
  • 19
    • 33746841392 scopus 로고    scopus 로고
    • Solving real car sequencing problems with ant colony optimization
    • C. Gagné, M. Gravel, and W.L. Price Solving real car sequencing problems with ant colony optimization Eur. J. Oper. Res. 174 3 2006 1427 1448
    • (2006) Eur. J. Oper. Res. , vol.174 , Issue.3 , pp. 1427-1448
    • Gagné, C.1    Gravel, M.2    Price, W.L.3
  • 20
    • 9944236363 scopus 로고    scopus 로고
    • Sequencing problem for a mixed-model assembly line in the Toyota production system
    • S. Kotani, T. Ito, and K. Ohno Sequencing problem for a mixed-model assembly line in the Toyota production system Int. J. Prod. Res. 42/23 2004 4955 4974
    • (2004) Int. J. Prod. Res. , vol.4223 , pp. 4955-4974
    • Kotani, S.1    Ito, T.2    Ohno, K.3
  • 21
    • 84866972275 scopus 로고    scopus 로고
    • Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm
    • S.-W. Lin, and K.-C. Ying Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm Omega 41/ 2 2013 383 389
    • (2013) Omega , vol.412 , pp. 383-389
    • Lin, S.-W.1    Ying, K.-C.2
  • 22
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • J. Miltenburg Level schedules for mixed-model assembly lines in just-in-time production systems Manage. Sci. 35 2 1989 192 207
    • (1989) Manage. Sci. , vol.35 , Issue.2 , pp. 192-207
    • Miltenburg, J.1
  • 24
    • 0141907723 scopus 로고    scopus 로고
    • Has the inverted-U theory of stress and job performance had a fair test?
    • L.A. Muse, S.G. Harris, and H.S. Field Has the inverted-U theory of stress and job performance had a fair test? Hum. Perform. 16/4 2003 349 364
    • (2003) Hum. Perform. , vol.164 , pp. 349-364
    • Muse, L.A.1    Harris, S.G.2    Field, H.S.3
  • 25
    • 84866148007 scopus 로고    scopus 로고
    • A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime
    • Q.-K. Pan, and R. Ruiz A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime Comput. Oper. Res. 40/1 2013 117 128
    • (2013) Comput. Oper. Res. , vol.401 , pp. 117-128
    • Pan, Q.-K.1    Ruiz, R.2
  • 26
    • 0022953553 scopus 로고
    • Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem
    • B. Parrello, W. Kabat, and L. Wos Job-shop scheduling using automated reasoning: a case study of the car-sequencing problem J. Autom. Reasoning 2 1986 1 42
    • (1986) J. Autom. Reasoning , vol.2 , pp. 1-42
    • Parrello, B.1    Kabat, W.2    Wos, L.3
  • 27
    • 44649152898 scopus 로고    scopus 로고
    • A comparative study of heuristic algorithms on economic lot scheduling problem
    • A.S. Raza, and A. Akgunduz A comparative study of heuristic algorithms on economic lot scheduling problem Comput. Ind. Eng. 55 1 2008 94 109
    • (2008) Comput. Ind. Eng. , vol.55 , Issue.1 , pp. 94-109
    • Raza, A.S.1    Akgunduz, A.2
  • 28
    • 0032305338 scopus 로고    scopus 로고
    • Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
    • A. Scholl, R. Klein, and W. Domschke Pattern based vocabulary building for effectively sequencing mixed-model assembly lines J. Heuristics 4 4 1998 359 381
    • (1998) J. Heuristics , vol.4 , Issue.4 , pp. 359-381
    • Scholl, A.1    Klein, R.2    Domschke, W.3
  • 29
    • 0000544268 scopus 로고
    • Survey, development, and application of algorithms for sequencing paced assembly lines
    • C.A. Yano, and A. Bolat Survey, development, and application of algorithms for sequencing paced assembly lines J. Manuf. Oper. Manage. 2 3 1989 172 198
    • (1989) J. Manuf. Oper. Manage. , vol.2 , Issue.3 , pp. 172-198
    • Yano, C.A.1    Bolat, A.2
  • 30
    • 0000298775 scopus 로고
    • Sequencing to minimize work overload in assembly lines with product options
    • C.A. Yano, and R. Rachamadugu Sequencing to minimize work overload in assembly lines with product options Manage. Sci. 37 5 1991 572 586
    • (1991) Manage. Sci. , vol.37 , Issue.5 , pp. 572-586
    • Yano, C.A.1    Rachamadugu, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.