-
1
-
-
1342308494
-
Analysis of parts requirements variance for a JIT supply chain
-
H. Aigbedo Analysis of parts requirements variance for a JIT supply chain International Journal of Production Research 42 2004 417 430
-
(2004)
International Journal of Production Research
, vol.42
, pp. 417-430
-
-
Aigbedo, H.1
-
2
-
-
68649103223
-
A note on parts inventory and mass customization for a two-stage JIT supply chain with zero-one type of bills of materials
-
H. Aigbedo A note on parts inventory and mass customization for a two-stage JIT supply chain with zero-one type of bills of materials Journal of the Operational Research Society 60/9 2009 1286 1291
-
(2009)
Journal of the Operational Research Society
, vol.609
, pp. 1286-1291
-
-
Aigbedo, H.1
-
3
-
-
69149101926
-
On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems
-
H. Aigbedo On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems International Journal of Systems Science 40/8 2009 787 798
-
(2009)
International Journal of Systems Science
, vol.408
, pp. 787-798
-
-
Aigbedo, H.1
-
7
-
-
33751255097
-
Ant algorithms for a time and space constrained assembly line balancing problem
-
J. Bautista, and J. Pereira Ant algorithms for a time and space constrained assembly line balancing problem European Journal of Operational Research 177/3 2007 2016 2032
-
(2007)
European Journal of Operational Research
, vol.1773
, pp. 2016-2032
-
-
Bautista, J.1
Pereira, J.2
-
9
-
-
55149094562
-
A dynamic programming based heuristic for the assembly line balancing problem
-
J. Bautista, and J. Pereira A dynamic programming based heuristic for the assembly line balancing problem European Journal of Operational Research 194/3 2009 787 794
-
(2009)
European Journal of Operational Research
, vol.1943
, pp. 787-794
-
-
Bautista, J.1
Pereira, J.2
-
11
-
-
0026933958
-
Scheduling algorithms to minimize utility work at a single station on a paced assembly line
-
A. Bolat, and C.A. Yano Scheduling algorithms to minimize utility work at a single station on a paced assembly line Production Planning and Control 3 1992 393 405
-
(1992)
Production Planning and Control
, vol.3
, pp. 393-405
-
-
Bolat, A.1
Yano, C.A.2
-
12
-
-
0026936861
-
A surrogate objective for utility work in paced assembly lines
-
A. Bolat, and C.A. Yano A surrogate objective for utility work in paced assembly lines Production Planning and Control 3 1992 406 412
-
(1992)
Production Planning and Control
, vol.3
, pp. 406-412
-
-
Bolat, A.1
Yano, C.A.2
-
13
-
-
34147104409
-
Comments on solving real car sequencing problems with ant colony optimization
-
N. Boysen, and M. Fliedner Comments on solving real car sequencing problems with ant colony optimization European Journal of Operational Research 182 2006 466 468
-
(2006)
European Journal of Operational Research
, vol.182
, pp. 466-468
-
-
Boysen, N.1
Fliedner, M.2
-
14
-
-
33751079058
-
Comment on Gravel, M., Gagné, T.C., Price W.L., 2005. Review and comparison of three methods for the solution of the car sequencing problem
-
N. Boysen, and M. Fliedner Comment on Gravel, M., Gagné, T.C., Price W.L., 2005. Review and comparison of three methods for the solution of the car sequencing problem Journal of the Operational Research Society 57 2006 1497 1498
-
(2006)
Journal of the Operational Research Society
, vol.57
, pp. 1497-1498
-
-
Boysen, N.1
Fliedner, M.2
-
15
-
-
51249121803
-
Sequencing mixed-model assembly lines: Survey, classification and model critique
-
N. Boysen, M. Fliedner, and A. Scholl Sequencing mixed-model assembly lines: Survey, classification and model critique European Journal of Operational Research 192/2 2009 349 373
-
(2009)
European Journal of Operational Research
, vol.1922
, pp. 349-373
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
16
-
-
0008610048
-
Solving the car-sequencing problem in constraint logic programming
-
London
-
Dincbas, M., Simonis, H., Hentenryck, P.V. 1988. Solving the car-sequencing problem in constraint logic programming. In: 8th European Conference on Artificial Intelligence, London, pp. 290-295.
-
(1988)
8th European Conference on Artificial Intelligence
, pp. 290-295
-
-
Dincbas, M.1
Simonis, H.2
Hentenryck, P.V.3
-
17
-
-
33644861570
-
Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
-
F.Y. Ding, J. Zhu, and H. Sun Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives International Journal of Production Economics 102 2006 108 131
-
(2006)
International Journal of Production Economics
, vol.102
, pp. 108-131
-
-
Ding, F.Y.1
Zhu, J.2
Sun, H.3
-
19
-
-
27144475350
-
Review and comparison of the three methods for the solution of the car sequencing problem
-
M. Gravel, C. Gagné, and W.L. Price Review and comparison of the three methods for the solution of the car sequencing problem Journal of the Operational Research Society 56 2005 1287 1295
-
(2005)
Journal of the Operational Research Society
, vol.56
, pp. 1287-1295
-
-
Gravel, M.1
Gagné, C.2
Price, W.L.3
-
21
-
-
0018469357
-
A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor
-
K. Okamura, and H. Yamashina A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor International Journal of Production Research 17 1979 233 247
-
(1979)
International Journal of Production Research
, vol.17
, pp. 233-247
-
-
Okamura, K.1
Yamashina, H.2
-
22
-
-
0022953553
-
Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem
-
B.D. Parello, W.B. Kabat, and L. Wos Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem Journal of Automated Reasoning 2 1986 1 42
-
(1986)
Journal of Automated Reasoning
, vol.2
, pp. 1-42
-
-
Parello, B.D.1
Kabat, W.B.2
Wos, L.3
-
23
-
-
0032305338
-
Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
-
A. Scholl, R. Klein, and W. Domschke Pattern based vocabulary building for effectively sequencing mixed-model assembly lines Journal of Heuristics 4 1998 359 381
-
(1998)
Journal of Heuristics
, vol.4
, pp. 359-381
-
-
Scholl, A.1
Klein, R.2
Domschke, W.3
-
24
-
-
0029276137
-
Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage
-
L.H. Tsai Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage Management Science 41 1995 485 495
-
(1995)
Management Science
, vol.41
, pp. 485-495
-
-
Tsai, L.H.1
-
25
-
-
0030818944
-
Algorithms for sequencing mixed models on an assembly line in a JIT production system
-
Z. Xiaobo, and K. Ohno Algorithms for sequencing mixed models on an assembly line in a JIT production system Computers and Industrial Engineering 32 1997 47 56
-
(1997)
Computers and Industrial Engineering
, vol.32
, pp. 47-56
-
-
Xiaobo, Z.1
Ohno, K.2
-
26
-
-
0033728251
-
Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
-
Z. Xiaobo, and K. Ohno Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages European Journal of Operational Research 124 2000 560 570
-
(2000)
European Journal of Operational Research
, vol.124
, pp. 560-570
-
-
Xiaobo, Z.1
Ohno, K.2
-
27
-
-
0000298775
-
Sequencing to minimize work overload in assembly lines with product options
-
C.A. Yano, and R. Rachamadugu Sequencing to minimize work overload in assembly lines with product options Management Science 37/5 1991 572 586
-
(1991)
Management Science
, vol.375
, pp. 572-586
-
-
Yano, C.A.1
Rachamadugu, R.2
|