-
1
-
-
0031238178
-
A parametric procedure for multcriterion sequence scheduling for just-in-time mixed-model assembly lines
-
H. Aigbedo, and Y. Monden A parametric procedure for multcriterion sequence scheduling for just-in-time mixed-model assembly lines International Journal of Production Research 35 1997 2543 2564
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2543-2564
-
-
Aigbedo, H.1
Monden, Y.2
-
2
-
-
0000363908
-
Sequencing mixed-model assembly lines to level parts usage and minimize line length
-
J.F. Bard, A. Shtub, and S.B. Joshi Sequencing mixed-model assembly lines to level parts usage and minimize line length International Journal of Production Research 32 1994 2431 2454
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2431-2454
-
-
Bard, J.F.1
Shtub, A.2
Joshi, S.B.3
-
4
-
-
33751255097
-
Ant algorithms for a time and space constrained assembly line balancing problem
-
J. Bautista, and J. Pereira Ant algorithms for a time and space constrained assembly line balancing problem European Journal of Operational Research 177 3 2007 2016 2032
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2016-2032
-
-
Bautista, J.1
Pereira, J.2
-
6
-
-
79151476061
-
Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules
-
J. Bautista, and A. Cano Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules European Journal of Operational Research 210 3 2011 495 513
-
(2011)
European Journal of Operational Research
, vol.210
, Issue.3
, pp. 495-513
-
-
Bautista, J.1
Cano, A.2
-
7
-
-
84866409736
-
Performance of bounded dynamic programming applied to a variant of the MMSP-W problem
-
S.P. Sethi, M. Bogataj, L. Ros-McDonnell, Springer 978-1-4471-2320-0
-
J. Bautista, A. Cano, and R. Alfaro Performance of bounded dynamic programming applied to a variant of the MMSP-W problem S.P. Sethi, M. Bogataj, L. Ros-McDonnell, Industrial Engineering: Innovative Networks (Proceedings of the 5th International Conference on Industrial Engineering and Industrial Management "CIO 2011", Cartagena, Spain, September 2011) 2012 Springer 978-1-4471-2320-0 339 348
-
(2012)
Industrial Engineering: Innovative Networks (Proceedings of the 5th International Conference on Industrial Engineering and Industrial Management "cIO 2011", Cartagena, Spain, September 2011)
, pp. 339-348
-
-
Bautista, J.1
Cano, A.2
Alfaro, R.3
-
8
-
-
84861187828
-
Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints: An application in Nissan's Barcelona plant
-
J. Bautista, A. Cano, and R. Alfaro Modeling and solving a variant of the mixed-model sequencing problem with work overload minimisation and regularity constraints: an application in Nissan's Barcelona plant Expert Systems with Applications 39 12 2012 11001 11010
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.12
, pp. 11001-11010
-
-
Bautista, J.1
Cano, A.2
Alfaro, R.3
-
9
-
-
38349129725
-
A beam search approach for the optimization version of the car sequencing problem
-
J. Bautista, J. Pereira, and B. Adenso-Díaz A beam search approach for the optimization version of the car sequencing problem Annals of Operations Research 159 1 2008 233 244
-
(2008)
Annals of Operations Research
, vol.159
, Issue.1
, pp. 233-244
-
-
Bautista, J.1
Pereira, J.2
Adenso-Díaz, B.3
-
11
-
-
0026933958
-
Scheduling algorithms to minimize utility work at a single station on paced assembly line
-
A. Bolat, and C.A. Yano Scheduling algorithms to minimize utility work at a single station on paced assembly line Production Planning and Control 3/4 1992 393 405
-
(1992)
Production Planning and Control
, vol.3-4
, pp. 393-405
-
-
Bolat, A.1
Yano, C.A.2
-
12
-
-
0031213490
-
Efficient methods for sequencing minimum job sets on mixed model assembly lines
-
A. Bolat Efficient methods for sequencing minimum job sets on mixed model assembly lines Naval Research Logistics 44 5 1997 419 437
-
(1997)
Naval Research Logistics
, vol.44
, Issue.5
, pp. 419-437
-
-
Bolat, A.1
-
13
-
-
0242333126
-
A mathematical model for sequencing mixed models with due dates
-
A. Bolat A mathematical model for sequencing mixed models with due dates International Journal of Production Research 41 5 2003 897 918
-
(2003)
International Journal of Production Research
, vol.41
, Issue.5
, pp. 897-918
-
-
Bolat, A.1
-
14
-
-
51249121803
-
Sequencing mixed-model assembly lines: Survey, classification and model critique
-
N. Boysen, M. Fliedner, and A. Scholl Sequencing mixed-model assembly lines: survey, classification and model critique European Journal of Operational Research 192 2 2009 349 373
-
(2009)
European Journal of Operational Research
, vol.192
, Issue.2
, pp. 349-373
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
15
-
-
79960553504
-
Sequencing mixed-model assembly lines to minimise the number of work overload situations
-
N. Boysen, M. Kiel, and A. Scholl Sequencing mixed-model assembly lines to minimise the number of work overload situations International Journal of Production Research 49 16 2011 4735 4760
-
(2011)
International Journal of Production Research
, vol.49
, Issue.16
, pp. 4735-4760
-
-
Boysen, N.1
Kiel, M.2
Scholl, A.3
-
16
-
-
33644861570
-
Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives
-
F. Ding, J. Zhu, and H. Sun Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives International Journal of Production Economics 102 1 2006 108 131
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.1
, pp. 108-131
-
-
Ding, F.1
Zhu, J.2
Sun, H.3
-
18
-
-
9944236363
-
Sequencing problem for a mixed-model assembly line in the Toyota production system
-
S. Kotani, T. Ito, and K. Ohno Sequencing problem for a mixed-model assembly line in the Toyota production system International Journal of Production Research 42 23 2004 4955 4974
-
(2004)
International Journal of Production Research
, vol.42
, Issue.23
, pp. 4955-4974
-
-
Kotani, S.1
Ito, T.2
Ohno, K.3
-
19
-
-
0027623947
-
A theoretical framework for understanding why JIT reduces cost and cycle time and improves quality
-
J. Miltenburg A theoretical framework for understanding why JIT reduces cost and cycle time and improves quality International Journal of Production Economics 1993 195 204
-
(1993)
International Journal of Production Economics
, pp. 195-204
-
-
Miltenburg, J.1
-
20
-
-
0003449926
-
-
Industrial Engineering and Management Press, Institute of Industrial Engineers Atlanta, GA
-
Y. Monden Toyota Production System 1983 Industrial Engineering and Management Press, Institute of Industrial Engineers Atlanta, GA
-
(1983)
Toyota Production System
-
-
Monden, Y.1
-
21
-
-
0018469357
-
A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor
-
K. Okamura, and H. Yamashina A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor International Journal of Production Research 17 3 1979 233 247
-
(1979)
International Journal of Production Research
, vol.17
, Issue.3
, pp. 233-247
-
-
Okamura, K.1
Yamashina, H.2
-
22
-
-
35348847056
-
A hybrid multi-objective shuffled frog-leaping algorithms for a mixed-model assembly line sequencing problem
-
A. Rahimi-Vahed, and A.H. Mirzaei A hybrid multi-objective shuffled frog-leaping algorithms for a mixed-model assembly line sequencing problem Computers & Industrial Engineering 53 4 2007 642 666
-
(2007)
Computers & Industrial Engineering
, vol.53
, Issue.4
, pp. 642-666
-
-
Rahimi-Vahed, A.1
Mirzaei, A.H.2
-
23
-
-
0026868840
-
Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan
-
C. Rajendran, and D. Chaudhuri Scheduling in n-job, m-stage flowshop with parallel processors to minimize makespan International Journal of Production Economics 27 2 1992 137 143
-
(1992)
International Journal of Production Economics
, vol.27
, Issue.2
, pp. 137-143
-
-
Rajendran, C.1
Chaudhuri, D.2
-
24
-
-
0032305338
-
Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
-
4
-
A. Scholl, R. Klein, and W. Domschke Pattern based vocabulary building for effectively sequencing mixed-model assembly lines Journal of Heuristics 4/4 1998 359 381
-
(1998)
Journal of Heuristics
, vol.4
, pp. 359-381
-
-
Scholl, A.1
Klein, R.2
Domschke, W.3
-
25
-
-
0032664028
-
A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline
-
T. Tamura, H. Long, and K. Ohno A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline International Journal of Production Economics 1999 557 564
-
(1999)
International Journal of Production Economics
, pp. 557-564
-
-
Tamura, T.1
Long, H.2
Ohno, K.3
-
26
-
-
0029276137
-
Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage
-
L.H. Tsai Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage Management Science 41 3 1995 485 495
-
(1995)
Management Science
, vol.41
, Issue.3
, pp. 485-495
-
-
Tsai, L.H.1
-
27
-
-
0030818944
-
Algorithms for sequencing mixed models on assembly line in a JIT production system
-
Z. Xiaobo, and K. Ohno Algorithms for sequencing mixed models on assembly line in a JIT production system Computers & Industrial Engineering 31 1 1997 47 56
-
(1997)
Computers & Industrial Engineering
, vol.31
, Issue.1
, pp. 47-56
-
-
Xiaobo, Z.1
Ohno, K.2
-
28
-
-
0000544268
-
Survey, development, and application of algorithms for sequencing paced assembly lines
-
C.A. Yano, and A. Bolat Survey, development, and application of algorithms for sequencing paced assembly lines Journal of Manufacturing and Operations Management 2/3 1989 172 198
-
(1989)
Journal of Manufacturing and Operations Management
, vol.2-3
, pp. 172-198
-
-
Yano, C.A.1
Bolat, A.2
-
29
-
-
0000298775
-
Sequencing to minimize work overload in assembly lines with product options
-
C.A. Yano, and R. Rachamadugu Sequencing to minimize work overload in assembly lines with product options Management Science 37 5 1991 572 586
-
(1991)
Management Science
, vol.37
, Issue.5
, pp. 572-586
-
-
Yano, C.A.1
Rachamadugu, R.2
|