메뉴 건너뛰기




Volumn 45, Issue 2, 2015, Pages 315-325

A hyperheuristic approach for intercell scheduling with single processing machines and batch processing machines

Author keywords

Management decision making; manufacturing scheduling; optimization methods; production management

Indexed keywords

ANT COLONY OPTIMIZATION; BATCH DATA PROCESSING; CELLULAR MANUFACTURING; COMPUTATIONAL EFFICIENCY; DECISION MAKING; GENETIC ALGORITHMS;

EID: 84921418135     PISSN: 21682216     EISSN: 21682232     Source Type: Journal    
DOI: 10.1109/TSMC.2014.2332443     Document Type: Article
Times cited : (38)

References (30)
  • 1
    • 0002855196 scopus 로고
    • Countering the negative impact of intercell flow in cellular manufacturing
    • Jan
    • O. Garza and T. L. Smunt, "Countering the negative impact of intercell flow in cellular manufacturing," J. Oper. Manag., vol. 10, no. 1, pp. 92-118, Jan. 1991.
    • (1991) J. Oper. Manag , vol.10 , Issue.1 , pp. 92-118
    • Garza, O.1    Smunt, T.L.2
  • 2
    • 0030271143 scopus 로고    scopus 로고
    • Group scheduling on two cells with intercell movement
    • Oct
    • W. H. Yang and C. J. Liao, "Group scheduling on two cells with intercell movement," Comput. Oper. Res., vol. 23, no. 10, pp. 997-1006, Oct. 1996.
    • (1996) Comput. Oper. Res , vol.23 , Issue.10 , pp. 997-1006
    • Yang, W.H.1    Liao, C.J.2
  • 3
    • 29944431867 scopus 로고    scopus 로고
    • A heuristic to minimize makespan of cell scheduling problem
    • Apr
    • M. Solimanpur, P. Vrat, and R. Shankar, "A heuristic to minimize makespan of cell scheduling problem," Int. J. Prod. Econ., vol. 88, no. 3, pp. 231-241, Apr. 2004.
    • (2004) Int. J. Prod. Econ , vol.88 , Issue.3 , pp. 231-241
    • Solimanpur, M.1    Vrat, P.2    Shankar, R.3
  • 4
    • 70449526276 scopus 로고    scopus 로고
    • Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system
    • Mar
    • R. Tavakkoli-Moghaddam, N. Javadian, A. Khorrami, and Y. Gholipour-Kanani, "Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system," Expert Syst. Appl., vol. 37, no. 3, pp. 2661-2669, Mar. 2010.
    • (2010) Expert Syst. Appl , vol.37 , Issue.3 , pp. 2661-2669
    • Tavakkoli-Moghaddam, R.1    Javadian, N.2    Khorrami, A.3    Gholipour-Kanani, Y.4
  • 5
    • 77956112367 scopus 로고    scopus 로고
    • Applying an integer electromagnetism-like algorithm to solve the cellular manufacturing scheduling problem with an integrated approach
    • Troyes, France
    • A. Golmohammadi and R. Ghodsi, "Applying an integer electromagnetism-like algorithm to solve the cellular manufacturing scheduling problem with an integrated approach," in Proc. Comput. Ind. Eng. (CIE), Troyes, France, 2009, pp. 34-39.
    • (2009) Proc. Comput. Ind. Eng. (CIE , pp. 34-39
    • Golmohammadi, A.1    Ghodsi, R.2
  • 6
    • 77955655189 scopus 로고    scopus 로고
    • Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach
    • Aug
    • J. F. Tang, X. Q. Wang, I. Kaku, and K. L. Yung, "Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach," J. Intell. Manuf., vol. 21, no. 4, pp. 525-537, Aug. 2010.
    • (2010) J. Intell. Manuf , vol.21 , Issue.4 , pp. 525-537
    • Tang, J.F.1    Wang, X.Q.2    Kaku, I.3    Yung, K.L.4
  • 7
    • 79955908237 scopus 로고    scopus 로고
    • A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts
    • Aug
    • A. Elmi, M. Solimanpur, S. Topaloglu, and A. Elmi, "A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts," Comput. Ind. Eng., vol. 61, no. 1, pp. 171-178, Aug. 2011.
    • (2011) Comput. Ind. Eng , vol.61 , Issue.1 , pp. 171-178
    • Elmi, A.1    Solimanpur, M.2    Topaloglu, S.3    Elmi, A.4
  • 8
    • 84872815215 scopus 로고    scopus 로고
    • Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes
    • May
    • D. N. Li, Y. Wang, G. X. Xiao, and J. F. Tang, "Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes," Comput. Oper. Res., vol. 1, no. 14, pp. 1207-1223, May 2013.
    • (2013) Comput. Oper. Res , vol.1 , Issue.14 , pp. 1207-1223
    • Li, D.N.1    Wang, Y.2    Xiao, G.X.3    Tang, J.F.4
  • 9
    • 84961178064 scopus 로고    scopus 로고
    • An aco-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine
    • online publication
    • D. N. Li, X. W. Meng, M. Li, and Y. Tian, "An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine," J. Intell. Manuf., online publication. DOI: 10.1007/s10845-013-0859-2
    • J. Intell. Manuf
    • Li, D.N.1    Meng, X.W.2    Li, M.3    Tian, Y.4
  • 10
    • 11144341958 scopus 로고    scopus 로고
    • Why does cell implementation stop factors influencing cell penetration in manufacturing plants
    • Sep
    • D. J. Johnson and U. Wemmerlov, "Why does cell implementation stop Factors influencing cell penetration in manufacturing plants," Prod. Oper. Manag., vol. 13, no. 3, pp. 272-289, Sep. 2004.
    • (2004) Prod. Oper. Manag , vol.13 , Issue.3 , pp. 272-289
    • Johnson, D.J.1    Wemmerlov, U.2
  • 11
    • 27144484897 scopus 로고    scopus 로고
    • The sustainable cell formation problem: Manufacturing cell creation with machine modification costs
    • Apr
    • L. R. Foulds, A. P. French, and J. M. Wilson, "The sustainable cell formation problem: Manufacturing cell creation with machine modification costs," Comput. Oper. Res., vol. 33, no. 4, pp. 1010-1032, Apr. 2006.
    • (2006) Comput. Oper. Res , vol.33 , Issue.4 , pp. 1010-1032
    • Foulds, L.R.1    French, A.P.2    Wilson, J.M.3
  • 12
    • 35348949618 scopus 로고    scopus 로고
    • Optimization and implementation of cellular manufacturing system in a pump industry using three cell formation algorithms
    • Nov
    • M. Murugan and V. Selladurai, "Optimization and implementation of cellular manufacturing system in a pump industry using three cell formation algorithms," Int. J. Adv. Manuf. Technol., vol. 35, nos. 1-2, pp. 135-149, Nov. 2007.
    • (2007) Int. J. Adv. Manuf. Technol , vol.35 , Issue.1-2 , pp. 135-149
    • Murugan, M.1    Selladurai, V.2
  • 13
    • 31444449761 scopus 로고    scopus 로고
    • Minimizing flow time in a flow-line manufacturing cell with family setup times
    • Feb
    • J. N. D. Gupta and J. E. Schaller, "Minimizing flow time in a flow-line manufacturing cell with family setup times," J. Oper. Res. Soc., vol. 57, no. 2, pp. 163-176, Feb. 2006.
    • (2006) J. Oper. Res. Soc , vol.57 , Issue.2 , pp. 163-176
    • Gupta, J.N.D.1    Schaller, J.E.2
  • 14
    • 0033689121 scopus 로고    scopus 로고
    • A due-date oriented scheduling heuristic for job shop cellular manufacturing system
    • Mar
    • C. H. Tsai and R. K. Li, "A due-date oriented scheduling heuristic for job shop cellular manufacturing system," Int. J. Ind. Eng. Theory., vol. 7, no. 1, pp. 76-88, Mar. 2000.
    • (2000) Int. J. Ind. Eng. Theory , vol.7 , Issue.1 , pp. 76-88
    • Tsai, C.H.1    Li, R.K.2
  • 15
    • 80052993037 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing process planning and scheduling: A state-of-The-Art survey
    • Jul
    • W. M. Shen, L. H.Wang, and Q. Hao, "Agent-based distributed manufacturing process planning and scheduling: A state-of-The-Art survey," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 36, no. 4, pp. 563-577, Jul. 2006.
    • (2006) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev , vol.36 , Issue.4 , pp. 563-577
    • Shen, W.M.1    Wang, L.H.2    Hao, Q.3
  • 16
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • Jun
    • A. Allahverdi, C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov, "A survey of scheduling problems with setup times or costs," Eur. J. Oper. Res., vol. 187, no. 3, pp. 985-1032, Jun. 2008.
    • (2008) Eur. J. Oper. Res , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1    Ng, C.T.2    Cheng, T.C.E.3    Kovalyov, M.Y.4
  • 17
    • 33847709085 scopus 로고    scopus 로고
    • A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
    • Oct
    • S. Malve and R. Uzsoy, "A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families," Comput. Oper. Res., vol. 34, no. 10, pp. 3016-3028, Oct. 2007.
    • (2007) Comput. Oper. Res , vol.34 , Issue.10 , pp. 3016-3028
    • Malve, S.1    Uzsoy, R.2
  • 18
    • 33745817107 scopus 로고    scopus 로고
    • Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms
    • Oct
    • P. Damodaran, P. K. Manjeshwar, and K. Srihari, "Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms," Int. J. Prod. Econ., vol. 103, no. 2, pp. 882-891, Oct. 2006.
    • (2006) Int. J. Prod. Econ , vol.103 , Issue.2 , pp. 882-891
    • Damodaran, P.1    Manjeshwar, P.K.2    Srihari, K.3
  • 19
    • 75849147656 scopus 로고    scopus 로고
    • The hybrid flow shop scheduling problem
    • Aug
    • R. Ruiz and J. A. Vazquez-Rodriguez, "The hybrid flow shop scheduling problem," Eur. J. Oper. Res., vol. 205, no. 1, pp. 1-18, Aug. 2010.
    • (2010) Eur. J. Oper. Res , vol.205 , Issue.1 , pp. 1-18
    • Ruiz, R.1    Vazquez-Rodriguez, J.A.2
  • 20
    • 0031198746 scopus 로고    scopus 로고
    • Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach
    • Aug
    • S. C. Park, N. Raman, and M. J. Shaw, "Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach," IEEE Trans. Robot. Autom., vol. 13, no. 4, pp. 486-502, Aug. 1997.
    • (1997) IEEE Trans. Robot. Autom , vol.13 , Issue.4 , pp. 486-502
    • Park, S.C.1    Raman, N.2    Shaw, M.J.3
  • 21
    • 0346935512 scopus 로고
    • Performance of simple priority rule combinations in a flow dominant shop
    • R. L. Laforge and S. Barman, "Performance of simple priority rule combinations in a flow dominant shop," Prod. Inventory Manag. J., vol. 30, no. 3, pp. 1-4, 1989.
    • (1989) Prod. Inventory Manag. J , vol.30 , Issue.3 , pp. 1-4
    • Laforge, R.L.1    Barman, S.2
  • 22
    • 0030072218 scopus 로고    scopus 로고
    • Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop
    • Feb
    • H. Sarper and M. C. Henry, "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, vol. 24, no. 1, pp. 73-81, Feb. 1996.
    • (1996) Omega , vol.24 , Issue.1 , pp. 73-81
    • Sarper, H.1    Henry, M.C.2
  • 23
    • 0031256963 scopus 로고    scopus 로고
    • Simple priority rule combinations: An approach to improve both flow time and tardiness
    • Oct
    • S. Barman, "Simple priority rule combinations: An approach to improve both flow time and tardiness," Int. J. Prod. Res., vol. 35, no. 10, pp. 2857-2870, Oct. 1997.
    • (1997) Int. J. Prod. Res , vol.35 , Issue.10 , pp. 2857-2870
    • Barman, S.1
  • 24
    • 0029215084 scopus 로고
    • Evolution based learning in a job-shop scheduling environment
    • Jan
    • U. Dorndorf and E. Pesch, "Evolution based learning in a job-shop scheduling environment," Comput. Oper. Res., vol. 22, no. 1, pp. 25-40, Jan. 1995.
    • (1995) Comput. Oper. Res , vol.22 , Issue.1 , pp. 25-40
    • Dorndorf, U.1    Pesch, E.2
  • 25
    • 78049527141 scopus 로고    scopus 로고
    • A new dispatching rule based genetic algorithm for the multi-objective job shop problem
    • Dec
    • J. A. Vazquez-Rodriguez and S. Petrovic, "A new dispatching rule based genetic algorithm for the multi-objective job shop problem," J. Heuristics, vol. 16, no. 6, pp. 771-793, Dec. 2010.
    • (2010) J. Heuristics , vol.16 , Issue.6 , pp. 771-793
    • Vazquez-Rodriguez, J.A.1    Petrovic, S.2
  • 27
    • 0035781623 scopus 로고    scopus 로고
    • A multiobjective genetic algorithm for job shop scheduling
    • Dec
    • S. G. Ponnambalam, V. Ramkumar, and N. Jawahar, "A multiobjective genetic algorithm for job shop scheduling," Prod. Plan. Control, vol. 12, no. 8, pp. 764-774, Dec. 2001.
    • (2001) Prod. Plan. Control , vol.12 , Issue.8 , pp. 764-774
    • Ponnambalam, S.G.1    Ramkumar, V.2    Jawahar, N.3
  • 28
    • 0030707239 scopus 로고    scopus 로고
    • Max-min ant system and local search for the traveling salesman problem
    • Indianapolis, IN, USA
    • T. Stutzle and H. Hoos, "Max-min ant system and local search for the traveling salesman problem," in Proc. IEEE Int. Conf. Evol. Comput. (ICEC), Indianapolis, IN, USA, 1997, pp. 309-314.
    • (1997) Proc. IEEE Int. Conf. Evol. Comput. (ICEC , pp. 309-314
    • Stutzle, T.1    Hoos, H.2
  • 29
    • 34548613299 scopus 로고    scopus 로고
    • Ant colony optimization combined with taboo search for the job shop scheduling problem
    • Apr
    • K. L. Huang and C. J. Liao, "Ant colony optimization combined with taboo search for the job shop scheduling problem," Comput. Oper. Res., vol. 35, no. 4, pp. 1030-1046, Apr. 2008.
    • (2008) Comput. Oper. Res , vol.35 , Issue.4 , pp. 1030-1046
    • Huang, K.L.1    Liao, C.J.2
  • 30
    • 0005280636 scopus 로고
    • Comparison if a full factorial experiment to fractional and taguchi designs in a lathe dry turning operation
    • Sep
    • Y. A. Youssef, Y. Beauchamp, and M. Thomas, "Comparison if a full factorial experiment to fractional and taguchi designs in a lathe dry turning operation," Comput. Ind. Eng., vol. 27, nos. 1-4, pp. 59-62, Sep. 1994.
    • (1994) Comput. Ind. Eng , vol.27 , Issue.1-4 , pp. 59-62
    • Youssef, Y.A.1    Beauchamp, Y.2    Thomas, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.