메뉴 건너뛰기




Volumn 24, Issue 1, 1996, Pages 73-81

Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop

Author keywords

Limited buffer space; Simulation; Two machine flow shop

Indexed keywords

DISPATCHING RULES; DYNAMIC FLOWS; FLOW-SHOPS; LIMITED BUFFER SPACES; MACHINE DYNAMICS; PERFORMANCE MEASURE; POISSON PROCESS; SIMULATION; TWO MACHINE FLOW SHOP; TWO MACHINES; DISPATCHING RULE; FLOW SHOP; PERFORMANCE REQUIREMENT; PRODUCTION SYSTEM;

EID: 0030072218     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/0305-0483(95)00049-6     Document Type: Article
Times cited : (22)

References (32)
  • 1
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • 1. Baker KR (1984) Sequencing rules and due-date assignments in a job shop. Mgmt Sci. 30, 1093-1104.
    • (1984) Mgmt Sci. , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 2
    • 0002009274 scopus 로고
    • A dynamic priority rule for scheduling against due-dates
    • 2. Baker KR and Bertrand JWM (1982) A dynamic priority rule for scheduling against due-dates. J. Opl Mgmt 3, 37-42.
    • (1982) J. Opl Mgmt , vol.3 , pp. 37-42
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 3
    • 0002563758 scopus 로고
    • Job shop scheduling with modified due dates
    • 3. Baker KR and Kanet JJ. (1983) Job shop scheduling with modified due dates. J. Opl Mgmt 4, 11-22.
    • (1983) J. Opl Mgmt , vol.4 , pp. 11-22
    • Baker, K.R.1    Kanet, J.J.2
  • 4
    • 0022807123 scopus 로고
    • A SLAM II simulation study of a simplified flow shop
    • 4. Barrett RT and Barman S (1986) A SLAM II simulation study of a simplified flow shop. Simulation 47, 181-189.
    • (1986) Simulation , vol.47 , pp. 181-189
    • Barrett, R.T.1    Barman, S.2
  • 5
    • 0011449824 scopus 로고
    • Job-shop operations reform: Strategies for achieving queueless work flow
    • 5. Bassett G (1991 ) Job-shop operations reform: strategies for achieving queueless work flow. Int. J. Opns Prod. Mgmt 11, 55-71.
    • (1991) Int. J. Opns Prod. Mgmt , vol.11 , pp. 55-71
    • Bassett, G.1
  • 6
    • 0027813686 scopus 로고
    • Effect of buffer capacity and sequencing rules on single-card kanban system performance
    • 6. Berkley BJ (1993) Effect of buffer capacity and sequencing rules on single-card kanban system performance. Int. J. Prod. Res. 31, 2875-2893.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 2875-2893
    • Berkley, B.J.1
  • 7
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • 7. Cheng TCE and Gupta MC (1989) Survey of scheduling research involving due date determination decisions. Eur. J. Opl Res. 38, 156-166.
    • (1989) Eur. J. Opl Res. , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 8
    • 0028403388 scopus 로고
    • A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
    • 8. Cook DP (1994) A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Invent. Mgmt J. 1st Quarter, 73-78.
    • (1994) Prod. Invent. Mgmt J. 1st Quarter , pp. 73-78
    • Cook, D.P.1
  • 9
    • 0026714198 scopus 로고
    • Stochastic modelling of a two-stage transfer line production system with end buffer and random demand
    • 9. Gopalan MN and Anatharaman N (1992) Stochastic modelling of a two-stage transfer line production system with end buffer and random demand. Microlectron. Reliab. 32, 11-15.
    • (1992) Microlectron. Reliab. , vol.32 , pp. 11-15
    • Gopalan, M.N.1    Anatharaman, N.2
  • 11
    • 0014523454 scopus 로고
    • The effect of internal storage on the production rate of series of stages having exponential service times
    • 11. Hatcher JM (1969) The effect of internal storage on the production rate of series of stages having exponential service times. AIIE Trans. 1, 150-156.
    • (1969) AIIE Trans. , vol.1 , pp. 150-156
    • Hatcher, J.M.1
  • 13
    • 0002505896 scopus 로고
    • Performance of priority rules in a due date flow shop
    • 13. Hunsucker JL and Shah JR (1992) Performance of priority rules in a due date flow shop. Omega 20, 73-89.
    • (1992) Omega , vol.20 , pp. 73-89
    • Hunsucker, J.L.1    Shah, J.R.2
  • 14
    • 0028766172 scopus 로고
    • Comparative performance analysis of priority rules in a constrained flow shop with multiple processors
    • 14. Hunsucker JL and Shah JR (1994) Comparative performance analysis of priority rules in a constrained flow shop with multiple processors. Eur. J. Opl. Res. 72, 102-114.
    • (1994) Eur. J. Opl. Res. , vol.72 , pp. 102-114
    • Hunsucker, J.L.1    Shah, J.R.2
  • 15
    • 0027544951 scopus 로고
    • Control mechanism for stable lead times
    • 15. Johns SL and Hon B (1993) Control mechanism for stable lead times. Int. J. Prod. Res. 31, 429-441.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 429-441
    • Johns, S.L.1    Hon, B.2
  • 16
    • 0028530952 scopus 로고
    • Allocating work to a two-stage production system with interstage buffer
    • 16. Lau H (1994) Allocating work to a two-stage production system with interstage buffer. Int. J. Prod. Econ. 36, 281-289.
    • (1994) Int. J. Prod. Econ. , vol.36 , pp. 281-289
    • Lau, H.1
  • 17
    • 0001479396 scopus 로고
    • Performance evaluation of unbalanced serial production lines
    • 17. Lui CM and Lin CL (1994) Performance evaluation of unbalanced serial production lines. Int. J. Prod. Res. 32, 2897-2914.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 2897-2914
    • Lui, C.M.1    Lin, C.L.2
  • 18
    • 0002765014 scopus 로고
    • Dynamic group scheduling heuristic in a flow-through cell environment
    • 18. Mahmoodi F et al. (1992) Dynamic group scheduling heuristic in a flow-through cell environment. Decis. Sci. 23, 61-84.
    • (1992) Decis. Sci. , vol.23 , pp. 61-84
    • Mahmoodi, F.1
  • 19
    • 0016929337 scopus 로고
    • An investigation of a two-stage production line with normally distributed interarrival and service time distributions
    • 19. McGee G and Webster D (1976) An investigation of a two-stage production line with normally distributed interarrival and service time distributions. Int. J. Prod. Res. 14, 251-261.
    • (1976) Int. J. Prod. Res. , vol.14 , pp. 251-261
    • McGee, G.1    Webster, D.2
  • 20
    • 0026261414 scopus 로고
    • Simulation analysis of a JIT production line
    • 20. Meral S and Erkip N (1991) Simulation analysis of a JIT production line. Int. J. Prod. Econ. 24, 147-156.
    • (1991) Int. J. Prod. Econ. , vol.24 , pp. 147-156
    • Meral, S.1    Erkip, N.2
  • 21
    • 84985846638 scopus 로고
    • A comparison of sequencing rules for a two-stage hybrid flow shop
    • 21. Narasimhan SL and Mangiameli PM (1987) A comparison of sequencing rules for a two-stage hybrid flow shop. Decis. Sci. 18, 250-265.
    • (1987) Decis. Sci. , vol.18 , pp. 250-265
    • Narasimhan, S.L.1    Mangiameli, P.M.2
  • 22
    • 0021466086 scopus 로고
    • Scheduling in a two-stage manufacturing process
    • 22. Narasimhan SL and Panwalker SC (1984) Scheduling in a two-stage manufacturing process. Int. J. Prod. Res. 22, 555-564.
    • (1984) Int. J. Prod. Res. , vol.22 , pp. 555-564
    • Narasimhan, S.L.1    Panwalker, S.C.2
  • 23
    • 0023855852 scopus 로고
    • An evaluation of static flowshop scheduling heuristics in dynamic flowshop models via a computer simulation
    • 23. Park YB (1988) An evaluation of static flowshop scheduling heuristics in dynamic flowshop models via a computer simulation. Computers industr. Engng 14, 103-112.
    • (1988) Computers Industr. Engng , vol.14 , pp. 103-112
    • Park, Y.B.1
  • 24
    • 0026239352 scopus 로고
    • A model for determining job throughout times for manufacturing flow line workcells with finite buffers
    • 24. Park T and Steudel HJ (1991) A model for determining job throughout times for manufacturing flow line workcells with finite buffers. Int. J. Prod. Res. 28, 2025-2041.
    • (1991) Int. J. Prod. Res. , vol.28 , pp. 2025-2041
    • Park, T.1    Steudel, H.J.2
  • 25
    • 30244558576 scopus 로고
    • Systems Modelling Corporation, Sewickley, Pa
    • 25. Pegden CD (1986) SIMAN User's Manual. Systems Modelling Corporation, Sewickley, Pa.
    • (1986) SIMAN User's Manual
    • Pegden, C.D.1
  • 26
    • 0028392676 scopus 로고
    • The bowl phenomenon in unpaced lines
    • 26. Pike R and Martin GE (1994) The bowl phenomenon in unpaced lines. Int. J. Prod. Res. 32, 483-499.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 483-499
    • Pike, R.1    Martin, G.E.2
  • 27
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation results
    • 27. Ramasesh R (1990) Dynamic job shop scheduling: a survey of simulation results. Omega 18, 43-57.
    • (1990) Omega , vol.18 , pp. 43-57
    • Ramasesh, R.1
  • 28
    • 0016885524 scopus 로고
    • A statistical comparison of the performance of simple dispatching rules for a particular set of job shops
    • 28. Rochette R and Sadowski RP (1976) A statistical comparison of the performance of simple dispatching rules for a particular set of job shops. Int. J. Prod. Res. 14, 63-75.
    • (1976) Int. J. Prod. Res. , vol.14 , pp. 63-75
    • Rochette, R.1    Sadowski, R.P.2
  • 29
    • 0000389987 scopus 로고
    • Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem
    • 29. Sarper H (1994) Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem. Prod. Plann. Control 5, 185-192.
    • (1994) Prod. Plann. Control , vol.5 , pp. 185-192
    • Sarper, H.1
  • 30
    • 0025682903 scopus 로고
    • The impact of buffering strategies on the performance of production line systems
    • 30. So KC (1990) The impact of buffering strategies on the performance of production line systems. Int. J. Prod. Res. 28, 2293-2307.
    • (1990) Int. J. Prod. Res. , vol.28 , pp. 2293-2307
    • So, K.C.1
  • 31
    • 0027640745 scopus 로고
    • Dynamic scheduling. A survey of research
    • 31. Suresh V and Chaudhuri D (1993) Dynamic scheduling. A survey of research. Int. J. Prod. Econ. 32, 53-63.
    • (1993) Int. J. Prod. Econ. , vol.32 , pp. 53-63
    • Suresh, V.1    Chaudhuri, D.2
  • 32
    • 0028725846 scopus 로고
    • A simulation study of due-date assignment rules in a dynamic job shop
    • 32. Udo GJ (1994) A simulation study of due-date assignment rules in a dynamic job shop. Int. J. Prod. Res. 45, 1425-1435.
    • (1994) Int. J. Prod. Res. , vol.45 , pp. 1425-1435
    • Udo, G.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.