-
1
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
1. Baker KR (1984) Sequencing rules and due-date assignments in a job shop. Mgmt Sci. 30, 1093-1104.
-
(1984)
Mgmt Sci.
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
2
-
-
0002009274
-
A dynamic priority rule for scheduling against due-dates
-
2. Baker KR and Bertrand JWM (1982) A dynamic priority rule for scheduling against due-dates. J. Opl Mgmt 3, 37-42.
-
(1982)
J. Opl Mgmt
, vol.3
, pp. 37-42
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
3
-
-
0002563758
-
Job shop scheduling with modified due dates
-
3. Baker KR and Kanet JJ. (1983) Job shop scheduling with modified due dates. J. Opl Mgmt 4, 11-22.
-
(1983)
J. Opl Mgmt
, vol.4
, pp. 11-22
-
-
Baker, K.R.1
Kanet, J.J.2
-
4
-
-
0022807123
-
A SLAM II simulation study of a simplified flow shop
-
4. Barrett RT and Barman S (1986) A SLAM II simulation study of a simplified flow shop. Simulation 47, 181-189.
-
(1986)
Simulation
, vol.47
, pp. 181-189
-
-
Barrett, R.T.1
Barman, S.2
-
5
-
-
0011449824
-
Job-shop operations reform: Strategies for achieving queueless work flow
-
5. Bassett G (1991 ) Job-shop operations reform: strategies for achieving queueless work flow. Int. J. Opns Prod. Mgmt 11, 55-71.
-
(1991)
Int. J. Opns Prod. Mgmt
, vol.11
, pp. 55-71
-
-
Bassett, G.1
-
6
-
-
0027813686
-
Effect of buffer capacity and sequencing rules on single-card kanban system performance
-
6. Berkley BJ (1993) Effect of buffer capacity and sequencing rules on single-card kanban system performance. Int. J. Prod. Res. 31, 2875-2893.
-
(1993)
Int. J. Prod. Res.
, vol.31
, pp. 2875-2893
-
-
Berkley, B.J.1
-
7
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
7. Cheng TCE and Gupta MC (1989) Survey of scheduling research involving due date determination decisions. Eur. J. Opl Res. 38, 156-166.
-
(1989)
Eur. J. Opl Res.
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
8
-
-
0028403388
-
A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
-
8. Cook DP (1994) A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod. Invent. Mgmt J. 1st Quarter, 73-78.
-
(1994)
Prod. Invent. Mgmt J. 1st Quarter
, pp. 73-78
-
-
Cook, D.P.1
-
9
-
-
0026714198
-
Stochastic modelling of a two-stage transfer line production system with end buffer and random demand
-
9. Gopalan MN and Anatharaman N (1992) Stochastic modelling of a two-stage transfer line production system with end buffer and random demand. Microlectron. Reliab. 32, 11-15.
-
(1992)
Microlectron. Reliab.
, vol.32
, pp. 11-15
-
-
Gopalan, M.N.1
Anatharaman, N.2
-
11
-
-
0014523454
-
The effect of internal storage on the production rate of series of stages having exponential service times
-
11. Hatcher JM (1969) The effect of internal storage on the production rate of series of stages having exponential service times. AIIE Trans. 1, 150-156.
-
(1969)
AIIE Trans.
, vol.1
, pp. 150-156
-
-
Hatcher, J.M.1
-
13
-
-
0002505896
-
Performance of priority rules in a due date flow shop
-
13. Hunsucker JL and Shah JR (1992) Performance of priority rules in a due date flow shop. Omega 20, 73-89.
-
(1992)
Omega
, vol.20
, pp. 73-89
-
-
Hunsucker, J.L.1
Shah, J.R.2
-
14
-
-
0028766172
-
Comparative performance analysis of priority rules in a constrained flow shop with multiple processors
-
14. Hunsucker JL and Shah JR (1994) Comparative performance analysis of priority rules in a constrained flow shop with multiple processors. Eur. J. Opl. Res. 72, 102-114.
-
(1994)
Eur. J. Opl. Res.
, vol.72
, pp. 102-114
-
-
Hunsucker, J.L.1
Shah, J.R.2
-
15
-
-
0027544951
-
Control mechanism for stable lead times
-
15. Johns SL and Hon B (1993) Control mechanism for stable lead times. Int. J. Prod. Res. 31, 429-441.
-
(1993)
Int. J. Prod. Res.
, vol.31
, pp. 429-441
-
-
Johns, S.L.1
Hon, B.2
-
16
-
-
0028530952
-
Allocating work to a two-stage production system with interstage buffer
-
16. Lau H (1994) Allocating work to a two-stage production system with interstage buffer. Int. J. Prod. Econ. 36, 281-289.
-
(1994)
Int. J. Prod. Econ.
, vol.36
, pp. 281-289
-
-
Lau, H.1
-
17
-
-
0001479396
-
Performance evaluation of unbalanced serial production lines
-
17. Lui CM and Lin CL (1994) Performance evaluation of unbalanced serial production lines. Int. J. Prod. Res. 32, 2897-2914.
-
(1994)
Int. J. Prod. Res.
, vol.32
, pp. 2897-2914
-
-
Lui, C.M.1
Lin, C.L.2
-
18
-
-
0002765014
-
Dynamic group scheduling heuristic in a flow-through cell environment
-
18. Mahmoodi F et al. (1992) Dynamic group scheduling heuristic in a flow-through cell environment. Decis. Sci. 23, 61-84.
-
(1992)
Decis. Sci.
, vol.23
, pp. 61-84
-
-
Mahmoodi, F.1
-
19
-
-
0016929337
-
An investigation of a two-stage production line with normally distributed interarrival and service time distributions
-
19. McGee G and Webster D (1976) An investigation of a two-stage production line with normally distributed interarrival and service time distributions. Int. J. Prod. Res. 14, 251-261.
-
(1976)
Int. J. Prod. Res.
, vol.14
, pp. 251-261
-
-
McGee, G.1
Webster, D.2
-
20
-
-
0026261414
-
Simulation analysis of a JIT production line
-
20. Meral S and Erkip N (1991) Simulation analysis of a JIT production line. Int. J. Prod. Econ. 24, 147-156.
-
(1991)
Int. J. Prod. Econ.
, vol.24
, pp. 147-156
-
-
Meral, S.1
Erkip, N.2
-
21
-
-
84985846638
-
A comparison of sequencing rules for a two-stage hybrid flow shop
-
21. Narasimhan SL and Mangiameli PM (1987) A comparison of sequencing rules for a two-stage hybrid flow shop. Decis. Sci. 18, 250-265.
-
(1987)
Decis. Sci.
, vol.18
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
22
-
-
0021466086
-
Scheduling in a two-stage manufacturing process
-
22. Narasimhan SL and Panwalker SC (1984) Scheduling in a two-stage manufacturing process. Int. J. Prod. Res. 22, 555-564.
-
(1984)
Int. J. Prod. Res.
, vol.22
, pp. 555-564
-
-
Narasimhan, S.L.1
Panwalker, S.C.2
-
23
-
-
0023855852
-
An evaluation of static flowshop scheduling heuristics in dynamic flowshop models via a computer simulation
-
23. Park YB (1988) An evaluation of static flowshop scheduling heuristics in dynamic flowshop models via a computer simulation. Computers industr. Engng 14, 103-112.
-
(1988)
Computers Industr. Engng
, vol.14
, pp. 103-112
-
-
Park, Y.B.1
-
24
-
-
0026239352
-
A model for determining job throughout times for manufacturing flow line workcells with finite buffers
-
24. Park T and Steudel HJ (1991) A model for determining job throughout times for manufacturing flow line workcells with finite buffers. Int. J. Prod. Res. 28, 2025-2041.
-
(1991)
Int. J. Prod. Res.
, vol.28
, pp. 2025-2041
-
-
Park, T.1
Steudel, H.J.2
-
25
-
-
30244558576
-
-
Systems Modelling Corporation, Sewickley, Pa
-
25. Pegden CD (1986) SIMAN User's Manual. Systems Modelling Corporation, Sewickley, Pa.
-
(1986)
SIMAN User's Manual
-
-
Pegden, C.D.1
-
26
-
-
0028392676
-
The bowl phenomenon in unpaced lines
-
26. Pike R and Martin GE (1994) The bowl phenomenon in unpaced lines. Int. J. Prod. Res. 32, 483-499.
-
(1994)
Int. J. Prod. Res.
, vol.32
, pp. 483-499
-
-
Pike, R.1
Martin, G.E.2
-
27
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation results
-
27. Ramasesh R (1990) Dynamic job shop scheduling: a survey of simulation results. Omega 18, 43-57.
-
(1990)
Omega
, vol.18
, pp. 43-57
-
-
Ramasesh, R.1
-
28
-
-
0016885524
-
A statistical comparison of the performance of simple dispatching rules for a particular set of job shops
-
28. Rochette R and Sadowski RP (1976) A statistical comparison of the performance of simple dispatching rules for a particular set of job shops. Int. J. Prod. Res. 14, 63-75.
-
(1976)
Int. J. Prod. Res.
, vol.14
, pp. 63-75
-
-
Rochette, R.1
Sadowski, R.P.2
-
29
-
-
0000389987
-
Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem
-
29. Sarper H (1994) Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem. Prod. Plann. Control 5, 185-192.
-
(1994)
Prod. Plann. Control
, vol.5
, pp. 185-192
-
-
Sarper, H.1
-
30
-
-
0025682903
-
The impact of buffering strategies on the performance of production line systems
-
30. So KC (1990) The impact of buffering strategies on the performance of production line systems. Int. J. Prod. Res. 28, 2293-2307.
-
(1990)
Int. J. Prod. Res.
, vol.28
, pp. 2293-2307
-
-
So, K.C.1
-
31
-
-
0027640745
-
Dynamic scheduling. A survey of research
-
31. Suresh V and Chaudhuri D (1993) Dynamic scheduling. A survey of research. Int. J. Prod. Econ. 32, 53-63.
-
(1993)
Int. J. Prod. Econ.
, vol.32
, pp. 53-63
-
-
Suresh, V.1
Chaudhuri, D.2
-
32
-
-
0028725846
-
A simulation study of due-date assignment rules in a dynamic job shop
-
32. Udo GJ (1994) A simulation study of due-date assignment rules in a dynamic job shop. Int. J. Prod. Res. 45, 1425-1435.
-
(1994)
Int. J. Prod. Res.
, vol.45
, pp. 1425-1435
-
-
Udo, G.J.1
|