-
1
-
-
0003438602
-
-
Prentice Hall, Second Edition
-
Pinedo, M., 'Scheduling Theory, Algorithms, and Systems,' Prentice Hall, Second Edition, (2002).
-
(2002)
Scheduling Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
2
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
-
Sakawa, M. and Kubota, R., 'Fuzzy Programming for Multiobjective Job Shop Scheduling with Fuzzy Processing Time and Fuzzy Duedate through Genetic Algorithms', European Journal of Operational Research 120 2 (2000) 393-407.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
3
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
Foretemps, P., 'Jobshop Scheduling with Imprecise Durations: A Fuzzy Approach', IEEE Transactions on Fuzzy Systems 5 4 (1997) 557-569.
-
(1997)
IEEE Transactions on Fuzzy Systems
, vol.5
, Issue.4
, pp. 557-569
-
-
Foretemps, P.1
-
4
-
-
0003430214
-
-
Slowinski, R. and Hapke (Eds), M., Physica-Verlag, New York
-
Slowinski, R. and Hapke (Eds), M., Scheduling Under Fuzziness, Physica-Verlag, New York (2000).
-
(2000)
Scheduling under Fuzziness
-
-
-
6
-
-
0035369592
-
Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
-
Ghanas, S. and Kasperski, A., 'Minimizing Maximum Lateness in a Single Machine Scheduling Problem with Fuzzy Processing times and Fuzzy Due Dates,' Engineering Applications of Artificial Intelligence 14 3 (2001) 377-386.
-
(2001)
Engineering Applications of Artificial Intelligence
, vol.14
, Issue.3
, pp. 377-386
-
-
Ghanas, S.1
Kasperski, A.2
-
7
-
-
0037410246
-
On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
-
Ghanas, S. and Kasperski, 'On Two Single Machine Scheduling Problems with Fuzzy Processing Times and Fuzzy Due Dates, European Journal of Operational Research, 147 2 (2003) 281-296.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.2
, pp. 281-296
-
-
Ghanas, S.1
Kasperski2
-
9
-
-
0029254827
-
Multiple and bi-criteria scheduling: A literature survey
-
Nagar, A., Haddock, J. and Heragu, S., 'Multiple and Bi-criteria Scheduling: A Literature Survey', European Journal of Operational Research, 81 (1995) 88-104.
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 88-104
-
-
Nagar, A.1
Haddock, J.2
Heragu, S.3
-
10
-
-
0030241820
-
Multi-objective genetic algorithm and its applications to flowshop scheduling
-
Murata, T., Ishibuchi, H. and Tanaka, H., 'Multi-Objective Genetic Algorithm and its Applications to Flowshop Scheduling,' Computers Industrial Engineering, 30 4 (1996) 957-968.
-
(1996)
Computers Industrial Engineering
, vol.30
, Issue.4
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
13
-
-
0003521692
-
-
Prentice Hall, New Jersey
-
Klir, G. and Folger, T., Fuzzy Sets, Uncertainty and Information, Prentice Hall, New Jersey, (1988).
-
(1988)
Fuzzy Sets, Uncertainty and Information
-
-
Klir, G.1
Folger, T.2
-
14
-
-
0002839560
-
-
Reeves, C., Genetic Algorithms, in V.J. Rayward-Smith (Eds), McGraw-Hill International, UK, ISBN 0-07-709239-2
-
Reeves, C., Genetic Algorithms, in V.J. Rayward-Smith (Eds), Modern Heuristic Techniques for Combinatorial Problems, McGraw-Hill International, UK, ISBN 0-07-709239-2 (1995) 151-196.
-
(1995)
Modern Heuristic Techniques for Combinatorial Problems
, pp. 151-196
-
-
|