-
1
-
-
84867954072
-
A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
-
Ahmed S., King A.J., Parija G. A multi-stage stochastic integer programming approach for capacity expansion under uncertainty. Journal of Global Optimization 2003, 26:3-24.
-
(2003)
Journal of Global Optimization
, vol.26
, pp. 3-24
-
-
Ahmed, S.1
King, A.J.2
Parija, G.3
-
2
-
-
64949093409
-
A strong conic quadratic reformulation for machine-job assignment with controllable processing times
-
Aktürk M.S., Atamtürk A., Gürel S. A strong conic quadratic reformulation for machine-job assignment with controllable processing times. Operations Research Letters 2009, 37(3):187-191.
-
(2009)
Operations Research Letters
, vol.37
, Issue.3
, pp. 187-191
-
-
Aktürk, M.S.1
Atamtürk, A.2
Gürel, S.3
-
3
-
-
0035435909
-
Capacity acquisition, subcontracting, and lot sizing
-
Atamtürk A., Hochbaum D.S. Capacity acquisition, subcontracting, and lot sizing. Management Science 2001, 47(8):1081-1100.
-
(2001)
Management Science
, vol.47
, Issue.8
, pp. 1081-1100
-
-
Atamtürk, A.1
Hochbaum, D.S.2
-
4
-
-
0003878614
-
Lectures on modern convex optimization: analysis, algorithms, and engineering applications.
-
Society for Industrial and Applied Mathematics, Philadelphia, PA;
-
Ben-Tal A, Nemirovski A. Lectures on modern convex optimization: analysis, algorithms, and engineering applications. Society for Industrial and Applied Mathematics, Philadelphia, PA; 2001.
-
(2001)
-
-
Ben-Tal, A.1
Nemirovski, A.2
-
5
-
-
0001049772
-
Strategies for probabilistic lot-sizing problem with service-level constraints
-
Bookbinder J.H., Tan J.-Y. Strategies for probabilistic lot-sizing problem with service-level constraints. Management Science 1988, 34(9):1096-1108.
-
(1988)
Management Science
, vol.34
, Issue.9
, pp. 1096-1108
-
-
Bookbinder, J.H.1
Tan, J.-Y.2
-
6
-
-
0035480433
-
Inventory models with minimal service level constraints
-
Chen F.Y., Krass D. Inventory models with minimal service level constraints. European Journal of Operational Research 2001, 134(1):120-140.
-
(2001)
European Journal of Operational Research
, vol.134
, Issue.1
, pp. 120-140
-
-
Chen, F.Y.1
Krass, D.2
-
7
-
-
0142095169
-
A comparison of mixed-integer programming models for nonconvex piecewise linear cost minimization problems
-
L Croxton K., Gendron B., Magnanti T.L. A comparison of mixed-integer programming models for nonconvex piecewise linear cost minimization problems. Management Science 2003, 49(9):1268-1273.
-
(2003)
Management Science
, vol.49
, Issue.9
, pp. 1268-1273
-
-
Croxton, K.L.1
Gendron, B.2
Magnanti, T.L.3
-
8
-
-
0019032810
-
Deterministic production planning. algorithms and complexity
-
Florian M., Lenstra J.K., Rinnooy Kan A.H.G. Deterministic production planning. algorithms and complexity. Management Science 1980, 26(7):669-679.
-
(1980)
Management Science
, vol.26
, Issue.7
, pp. 669-679
-
-
Florian, M.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
9
-
-
71749091907
-
An anticipative scheduling approach with controllable processing times
-
Gürel S., Körpeoğlu E., Aktürk M.S. An anticipative scheduling approach with controllable processing times. Computers & Operations Research 2010, 37(6):1002-1013.
-
(2010)
Computers & Operations Research
, vol.37
, Issue.6
, pp. 1002-1013
-
-
Gürel, S.1
Körpeoğlu, E.2
Aktürk, M.S.3
-
10
-
-
84871974180
-
Dynamic capacitated lot sizing with random demand and dynamic safety stocks
-
Helber S., Sahling F., Schimmelpfeng K. Dynamic capacitated lot sizing with random demand and dynamic safety stocks. OR Spectrum 2013, 35:75-105.
-
(2013)
OR Spectrum
, vol.35
, pp. 75-105
-
-
Helber, S.1
Sahling, F.2
Schimmelpfeng, K.3
-
11
-
-
1842762122
-
Approximation schemes for parallel machine scheduling problems with controllable processing times
-
Jansen K., Mastrolilli M. Approximation schemes for parallel machine scheduling problems with controllable processing times. Computers & Operations Research 2004, 31(10):1565-1581.
-
(2004)
Computers & Operations Research
, vol.31
, Issue.10
, pp. 1565-1581
-
-
Jansen, K.1
Mastrolilli, M.2
-
12
-
-
84858750431
-
Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown
-
Jeang A. Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown. Omega 2012, 40:774-781.
-
(2012)
Omega
, vol.40
, pp. 774-781
-
-
Jeang, A.1
-
13
-
-
0041511823
-
The capacitated lot sizing problem. a review of models and algorithms
-
Karimi B., Fatemi Ghomi S.M.T., Wilson J.M. The capacitated lot sizing problem. a review of models and algorithms. Omega 2003, 31(5):365-378.
-
(2003)
Omega
, vol.31
, Issue.5
, pp. 365-378
-
-
Karimi, B.1
Fatemi Ghomi, S.M.T.2
Wilson, J.M.3
-
14
-
-
13544276185
-
A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
-
Kayan R.K., Aktürk M.S. A new bounding mechanism for the CNC machine scheduling problems with controllable processing times. European Journal of Operational Research 2005, 167(3):624-643.
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 624-643
-
-
Kayan, R.K.1
Aktürk, M.S.2
-
16
-
-
0022059935
-
The stochastic discrete dynamic lot size problem. an open-loop solution
-
Laserre J.B., Bes C., Roubellat F. The stochastic discrete dynamic lot size problem. an open-loop solution. Operations Research 1985, 33(3):684-689.
-
(1985)
Operations Research
, vol.33
, Issue.3
, pp. 684-689
-
-
Laserre, J.B.1
Bes, C.2
Roubellat, F.3
-
17
-
-
0020183161
-
Operations research and capacity expansion problems. a survey
-
Luss H. Operations research and capacity expansion problems. a survey. Operations Research 1982, 30(5):907-947.
-
(1982)
Operations Research
, vol.30
, Issue.5
, pp. 907-947
-
-
Luss, H.1
-
18
-
-
34247524736
-
Integrated capacity, and production planning with subcontracting and overtime options
-
Merzifonluoğlu Y., Geunes J., Romeijn H. Integrated capacity, and production planning with subcontracting and overtime options. Naval Research Logistics 2007, 54(4):433-447.
-
(2007)
Naval Research Logistics
, vol.54
, Issue.4
, pp. 433-447
-
-
Merzifonluoğlu, Y.1
Geunes, J.2
Romeijn, H.3
-
20
-
-
80052715642
-
Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem
-
Özen U., Doğru M.K., Tarim S.A. Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem. Omega 2012, 40:348-357.
-
(2012)
Omega
, vol.40
, pp. 348-357
-
-
Özen, U.1
Doğru, M.K.2
Tarim, S.A.3
-
22
-
-
0035521147
-
A coordinated production planning model with capacity expansion and inventory management
-
Rajagopalan S., Swaminathan J.M. A coordinated production planning model with capacity expansion and inventory management. Management Science 2001, 47(11):1562-1580.
-
(2001)
Management Science
, vol.47
, Issue.11
, pp. 1562-1580
-
-
Rajagopalan, S.1
Swaminathan, J.M.2
-
23
-
-
44949142877
-
Coordinated deterministic dynamic demand lot-sizing problem. a review of models and algorithms
-
Robinson P., Narayanan A., Şahin F. Coordinated deterministic dynamic demand lot-sizing problem. a review of models and algorithms. Omega 2009, 37(1):3-15.
-
(2009)
Omega
, vol.37
, Issue.1
, pp. 3-15
-
-
Robinson, P.1
Narayanan, A.2
Şahin, F.3
-
24
-
-
84908192145
-
Piecewise linear approximations for the static-dynamic uncertainty strategy in stochastic lot-sizing
-
Rossi R., Kiliç O.A., Tarim S.A. Piecewise linear approximations for the static-dynamic uncertainty strategy in stochastic lot-sizing. Omega 2015, 50:126-140.
-
(2015)
Omega
, vol.50
, pp. 126-140
-
-
Rossi, R.1
Kiliç, O.A.2
Tarim, S.A.3
-
25
-
-
2942731249
-
Minimizing the total weighted flow time in a single machine with controllable processing times
-
Shabtay D., Kaspi M. Minimizing the total weighted flow time in a single machine with controllable processing times. Computers & Operations Research 2004, 31(13):2279-2289.
-
(2004)
Computers & Operations Research
, vol.31
, Issue.13
, pp. 2279-2289
-
-
Shabtay, D.1
Kaspi, M.2
-
26
-
-
33646081533
-
Parallel machine scheduling with a convex resource consumption function
-
Shabtay D., Kaspi M. Parallel machine scheduling with a convex resource consumption function. European Journal of Operational Research 2006, 173(1):92-107.
-
(2006)
European Journal of Operational Research
, vol.173
, Issue.1
, pp. 92-107
-
-
Shabtay, D.1
Kaspi, M.2
-
27
-
-
34547404222
-
A survey of scheduling with controllable processing times
-
Shabtay D., Steiner G. A survey of scheduling with controllable processing times. Discrete Applied Mathematics 2007, 155(13):1643-1666.
-
(2007)
Discrete Applied Mathematics
, vol.155
, Issue.13
, pp. 1643-1666
-
-
Shabtay, D.1
Steiner, G.2
-
28
-
-
34848827877
-
Single machine batch scheduling to minimize total completion time and resource consumption costs
-
Shabtay D., Steiner G. Single machine batch scheduling to minimize total completion time and resource consumption costs. Journal of Scheduling 2007, 10(4-5):255-261.
-
(2007)
Journal of Scheduling
, vol.10
, Issue.4-5
, pp. 255-261
-
-
Shabtay, D.1
Steiner, G.2
-
29
-
-
0032094448
-
An algorithm for single-item capacitated economic lot sizing with piecewise linear production costs and general holding costs
-
Shaw D.X., Wagelmans A.P.M. An algorithm for single-item capacitated economic lot sizing with piecewise linear production costs and general holding costs. Management Science 1998, 44(6):831-838.
-
(1998)
Management Science
, vol.44
, Issue.6
, pp. 831-838
-
-
Shaw, D.X.1
Wagelmans, A.P.M.2
-
30
-
-
0018057838
-
Inventory control under a probabilistic time-varying, demand pattern
-
Silver E. Inventory control under a probabilistic time-varying, demand pattern. AIIE Transactions 1978, 10(4):371-379.
-
(1978)
AIIE Transactions
, vol.10
, Issue.4
, pp. 371-379
-
-
Silver, E.1
-
31
-
-
0005041648
-
Dynamic lot sizing problem with demand and non-stationary demand
-
Sox C. Dynamic lot sizing problem with demand and non-stationary demand. Operations Research Letters 1997, 20:155-164.
-
(1997)
Operations Research Letters
, vol.20
, pp. 155-164
-
-
Sox, C.1
-
32
-
-
0742266961
-
The stochastic dynamic production/inventory lot-sizing problem with service-level constraints
-
Tarim S.A., Kingsman B.G. The stochastic dynamic production/inventory lot-sizing problem with service-level constraints. International Journal of Production Economics 2004, 88:105-119.
-
(2004)
International Journal of Production Economics
, vol.88
, pp. 105-119
-
-
Tarim, S.A.1
Kingsman, B.G.2
-
33
-
-
79953127832
-
A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint
-
Tempelmeier H. A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint. Omega 2011, 39:627-633.
-
(2011)
Omega
, vol.39
, pp. 627-633
-
-
Tempelmeier, H.1
-
34
-
-
78649817572
-
The cost of using stationary inventory policies when demand is non-stationary
-
Tunç H., Kiliç O., Tarim S.A., Ekşioğlu B. The cost of using stationary inventory policies when demand is non-stationary. Omega 2011, 39(4):410-415.
-
(2011)
Omega
, vol.39
, Issue.4
, pp. 410-415
-
-
Tunç, H.1
Kiliç, O.2
Tarim, S.A.3
Ekşioğlu, B.4
-
35
-
-
84871722168
-
A simple approach for assessing the cost of system nervousness
-
Tunç H., Kiliç O.A., Tarim S.A., Ekşioğlu B. A simple approach for assessing the cost of system nervousness. International Journal of Production Economics 2013, 141(2):619-625.
-
(2013)
International Journal of Production Economics
, vol.141
, Issue.2
, pp. 619-625
-
-
Tunç, H.1
Kiliç, O.A.2
Tarim, S.A.3
Ekşioğlu, B.4
-
36
-
-
84894593040
-
A reformulation for the stochastic lot sizing problem with service-level constraints
-
Tunç H., Kiliç O.A., Tarim S.A., Ekşioğlu B. A reformulation for the stochastic lot sizing problem with service-level constraints. Operations Research Letters 2014, 42(2):161-165.
-
(2014)
Operations Research Letters
, vol.42
, Issue.2
, pp. 161-165
-
-
Tunç, H.1
Kiliç, O.A.2
Tarim, S.A.3
Ekşioğlu, B.4
-
37
-
-
70749158552
-
Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties
-
Türkcan A., Aktürk M.S., Storer R.H. Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties. IIE Transactions 2009, 41(12):1080-1095.
-
(2009)
IIE Transactions
, vol.41
, Issue.12
, pp. 1080-1095
-
-
Türkcan, A.1
Aktürk, M.S.2
Storer, R.H.3
-
38
-
-
63349104845
-
An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model
-
Vargas V. An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model. European Journal of Operational Research 2009, 198:447-451.
-
(2009)
European Journal of Operational Research
, vol.198
, pp. 447-451
-
-
Vargas, V.1
-
39
-
-
0019055358
-
Two single machine sequencing problems involving controllable job processing times
-
Vickson R.G. Two single machine sequencing problems involving controllable job processing times. AIIE Transactions 1980, 12(3):258-262.
-
(1980)
AIIE Transactions
, vol.12
, Issue.3
, pp. 258-262
-
-
Vickson, R.G.1
-
40
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.M., Whitin T.M. Dynamic version of the economic lot size model. Management Science 1958, 5(1):89-96.
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
41
-
-
84866720908
-
Multi-product lot scheduling with backordering and shelf-life constraints
-
Yan C., Liao Y., Banerjee A. Multi-product lot scheduling with backordering and shelf-life constraints. Omega 2013, 41:510-516.
-
(2013)
Omega
, vol.41
, pp. 510-516
-
-
Yan, C.1
Liao, Y.2
Banerjee, A.3
|