메뉴 건너뛰기




Volumn 198, Issue 2, 2009, Pages 447-451

An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model

Author keywords

Dynamic programming; Finite horizon; Inventory; Optimal policies; Production

Indexed keywords

HEURISTIC METHODS; NORMAL DISTRIBUTION; OPTIMAL SYSTEMS; OPTIMIZATION; RANDOM PROCESSES; STOCHASTIC MODELS; SYSTEMS ENGINEERING;

EID: 63349104845     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2008.09.003     Document Type: Article
Times cited : (51)

References (23)
  • 1
    • 0019581159 scopus 로고
    • A procedure for production lot sizing with probabilistic dynamic demand
    • Askin R. A procedure for production lot sizing with probabilistic dynamic demand. AIIE Transactions 13 2 (1981) 132-137
    • (1981) AIIE Transactions , vol.13 , Issue.2 , pp. 132-137
    • Askin, R.1
  • 2
    • 0009857256 scopus 로고
    • Material requirements planning (MRP) and purchase discounts
    • Benton W., and Whybark D. Material requirements planning (MRP) and purchase discounts. Journal of Operations Management 2 2 (1982) 137
    • (1982) Journal of Operations Management , vol.2 , Issue.2 , pp. 137
    • Benton, W.1    Whybark, D.2
  • 3
    • 0001049772 scopus 로고
    • Strategies for probabilistic lot-sizing problem with service level constraints
    • Bookbinder J., and Tan J. Strategies for probabilistic lot-sizing problem with service level constraints. Management Science 34 9 (1988) 1096-1108
    • (1988) Management Science , vol.34 , Issue.9 , pp. 1096-1108
    • Bookbinder, J.1    Tan, J.2
  • 4
    • 0039773238 scopus 로고
    • A comparison of dynamic lot sizing rules for use in a single stage MRP system with demand uncertainty
    • Callarman T., and Hamrin R. A comparison of dynamic lot sizing rules for use in a single stage MRP system with demand uncertainty. International Journal of Operations and Production Management 4 2 (1984) 39-48
    • (1984) International Journal of Operations and Production Management , vol.4 , Issue.2 , pp. 39-48
    • Callarman, T.1    Hamrin, R.2
  • 5
    • 84989457223 scopus 로고
    • Cost increases due to demand uncertainty in MRP lot sizing
    • DeBodt M., and Van Wassenhove L. Cost increases due to demand uncertainty in MRP lot sizing. Decision Sciences 14 3 (1983) 345-361
    • (1983) Decision Sciences , vol.14 , Issue.3 , pp. 345-361
    • DeBodt, M.1    Van Wassenhove, L.2
  • 6
    • 33745969016 scopus 로고    scopus 로고
    • Ten most influential papers of Management Science's first fifty years
    • Hopp W. Ten most influential papers of Management Science's first fifty years. Management Science 50 (2004) 1763
    • (2004) Management Science , vol.50 , pp. 1763
    • Hopp, W.1
  • 7
    • 63349094738 scopus 로고    scopus 로고
    • ISI Web of Science Citation Database, 2006. Thomson Company (retrieved July 14).
    • ISI Web of Science Citation Database, 2006. Thomson Company (retrieved July 14).
  • 8
    • 0022059935 scopus 로고
    • The stochastic discrete dynamic lot size problem: An open-loop solution
    • Lasserre J., Bes C., and Roubellat F. The stochastic discrete dynamic lot size problem: An open-loop solution. Operations Research 33 3 (1985) 684-689
    • (1985) Operations Research , vol.33 , Issue.3 , pp. 684-689
    • Lasserre, J.1    Bes, C.2    Roubellat, F.3
  • 11
    • 63349089352 scopus 로고
    • The response of a concerned management scientist
    • Silver E. The response of a concerned management scientist. Production and Inventory Management 17 3 (1976) 96-99
    • (1976) Production and Inventory Management , vol.17 , Issue.3 , pp. 96-99
    • Silver, E.1
  • 12
    • 0018057838 scopus 로고
    • Inventory control under a probabilistic time-varying, demand pattern
    • Silver E. Inventory control under a probabilistic time-varying, demand pattern. AIIE Transactions 10 4 (1978) 371-379
    • (1978) AIIE Transactions , vol.10 , Issue.4 , pp. 371-379
    • Silver, E.1
  • 13
    • 0002657699 scopus 로고
    • A heuristic for selecting lot size requirements for the case of a deterministic time varying demand rate and discrete opportunities for replenishment
    • Silver E., and Meal H. A heuristic for selecting lot size requirements for the case of a deterministic time varying demand rate and discrete opportunities for replenishment. Production and Inventory Management Journal 14 2 (1973) 64-74
    • (1973) Production and Inventory Management Journal , vol.14 , Issue.2 , pp. 64-74
    • Silver, E.1    Meal, H.2
  • 14
    • 0031145148 scopus 로고    scopus 로고
    • Optimization-based planning for the stochastic lot-scheduling problem
    • Sox C., and Muckstadt J. Optimization-based planning for the stochastic lot-scheduling problem. IIE Transactions 29 5 (1997) 349-357
    • (1997) IIE Transactions , vol.29 , Issue.5 , pp. 349-357
    • Sox, C.1    Muckstadt, J.2
  • 15
    • 0742266961 scopus 로고    scopus 로고
    • The stochastic dynamic production/inventory lot-sizing problem with service-level constraints
    • Tarim S.A., and Kingsman B.G. The stochastic dynamic production/inventory lot-sizing problem with service-level constraints. International Journal of Production Economics 88 1 (2004) 105-119
    • (2004) International Journal of Production Economics , vol.88 , Issue.1 , pp. 105-119
    • Tarim, S.A.1    Kingsman, B.G.2
  • 17
    • 33847388477 scopus 로고    scopus 로고
    • Comments on "Dynamic version of the economic lot-size model"
    • (supplement)
    • Wagner H. Comments on "Dynamic version of the economic lot-size model". Management Science 50 12 (2004) 1775-1777 (supplement)
    • (2004) Management Science , vol.50 , Issue.12 , pp. 1775-1777
    • Wagner, H.1
  • 18
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot-size model
    • Wagner H., and Whitin T. Dynamic version of the economic lot-size model. Management Science 5 1 (1958) 89-96
    • (1958) Management Science , vol.5 , Issue.1 , pp. 89-96
    • Wagner, H.1    Whitin, T.2
  • 20
    • 48749144547 scopus 로고
    • The part-period balancing algorithm and its look ahead-look back feature: A theoretical and experimental analysis of a single stage lot-sizing procedure
    • Wemmerlov U. The part-period balancing algorithm and its look ahead-look back feature: A theoretical and experimental analysis of a single stage lot-sizing procedure. Journal of Operations Management 4 1 (1983) 23-39
    • (1983) Journal of Operations Management , vol.4 , Issue.1 , pp. 23-39
    • Wemmerlov, U.1
  • 21
    • 38249025345 scopus 로고
    • The behavior of lot-sizing procedures in the presence of forecast errors
    • Wemmerlov U. The behavior of lot-sizing procedures in the presence of forecast errors. Journal of Operations Management 8 1 (1989) 37-47
    • (1989) Journal of Operations Management , vol.8 , Issue.1 , pp. 37-47
    • Wemmerlov, U.1
  • 23
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark D., and Williams J. Material requirements planning under uncertainty. Decision Sciences 7 4 (1976) 595-606
    • (1976) Decision Sciences , vol.7 , Issue.4 , pp. 595-606
    • Whybark, D.1    Williams, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.