메뉴 건너뛰기




Volumn 40, Issue 6, 2012, Pages 774-781

Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown

Author keywords

Initial setting (process mean); Process breakdown; Process deterioration; Process tolerance; Production lot size; Quadratic quality loss function

Indexed keywords


EID: 84858750431     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2011.12.005     Document Type: Article
Times cited : (35)

References (58)
  • 2
    • 0035577718 scopus 로고    scopus 로고
    • Joint determination of production quantity, inspection schedule and quality control for an imperfect process with deteriorating products
    • Rahim M.A., Ben-Daya M. Joint determination of production quantity, inspection schedule and quality control for an imperfect process with deteriorating products. The Journal of the Operational Research Society 2001, 52:1370-1378.
    • (2001) The Journal of the Operational Research Society , vol.52 , pp. 1370-1378
    • Rahim, M.A.1    Ben-Daya, M.2
  • 3
    • 11844263312 scopus 로고    scopus 로고
    • An integrated economic model for inventory and quality control problems
    • Rahim M.A., Ohta H. An integrated economic model for inventory and quality control problems. Engineering Optimization 2005, 37(1):65-81.
    • (2005) Engineering Optimization , vol.37 , Issue.1 , pp. 65-81
    • Rahim, M.A.1    Ohta, H.2
  • 4
    • 0035340520 scopus 로고    scopus 로고
    • Optimal production run length and inspection schedules in a deteriorating production process
    • Kim C.H., Hong Y., Chang S.Y. Optimal production run length and inspection schedules in a deteriorating production process. IIE Transactions 2001, 33(5):421-426.
    • (2001) IIE Transactions , vol.33 , Issue.5 , pp. 421-426
    • Kim, C.H.1    Hong, Y.2    Chang, S.Y.3
  • 5
    • 0035452379 scopus 로고    scopus 로고
    • Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system
    • Wang C.H., Sheu S.H. Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system. Computers & Operations Research 2001, 28(11):1093-1110.
    • (2001) Computers & Operations Research , vol.28 , Issue.11 , pp. 1093-1110
    • Wang, C.H.1    Sheu, S.H.2
  • 6
    • 0032761507 scopus 로고    scopus 로고
    • An optimal production run length in deteriorating production processes
    • Kim C.H., Hong Y. An optimal production run length in deteriorating production processes. International Journal of Production Economics 1999, 58(2):183-189.
    • (1999) International Journal of Production Economics , vol.58 , Issue.2 , pp. 183-189
    • Kim, C.H.1    Hong, Y.2
  • 7
    • 0026220964 scopus 로고
    • Joint determination of production cycle and inspection intervals in a deteriorating production system
    • Lee J.S., Park K.S. Joint determination of production cycle and inspection intervals in a deteriorating production system. The Journal of the Operational Research Society 1991, 42(9):775-783.
    • (1991) The Journal of the Operational Research Society , vol.42 , Issue.9 , pp. 775-783
    • Lee, J.S.1    Park, K.S.2
  • 8
    • 31644450876 scopus 로고    scopus 로고
    • An optimal production run for an imperfect production process with allowable shortages and time-varying fraction defective rate
    • Rahim M.A., Al-Hajailan W.I. An optimal production run for an imperfect production process with allowable shortages and time-varying fraction defective rate. International Journal of Advanced Manufacturing Technology 2006, 27(11-12):1170-1177.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.27 , Issue.11-12 , pp. 1170-1177
    • Rahim, M.A.1    Al-Hajailan, W.I.2
  • 9
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Operations research 1986, 34:137-144.
    • (1986) Operations research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 10
  • 11
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • Groenevelt H., Pintelon L., Siedmann A. Production batching with machine breakdowns and safety stocks. Operations Research 1992, 40(5):959-971.
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 959-971
    • Groenevelt, H.1    Pintelon, L.2    Siedmann, A.3
  • 12
    • 30344488182 scopus 로고    scopus 로고
    • Economic lot sizing for an imperfect production system subject to random breakdowns
    • Lin G.C., Kroll D.E. Economic lot sizing for an imperfect production system subject to random breakdowns. Engineering Optimization 2006, 38(1):73-92.
    • (2006) Engineering Optimization , vol.38 , Issue.1 , pp. 73-92
    • Lin, G.C.1    Kroll, D.E.2
  • 13
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • Giri B.C., Dohi T. Exact formulation of stochastic EMQ model for an unreliable production system. The Journal of the Operational Research Society 2005, 56(5):563-575.
    • (2005) The Journal of the Operational Research Society , vol.56 , Issue.5 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 14
    • 0035546071 scopus 로고    scopus 로고
    • Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment
    • Dohi T., Okamura H., Osaki S. Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment. International Journal of Production Economics 2001, 74:147-155.
    • (2001) International Journal of Production Economics , vol.74 , pp. 147-155
    • Dohi, T.1    Okamura, H.2    Osaki, S.3
  • 15
    • 0032764917 scopus 로고    scopus 로고
    • Analysis of a production inventory system with machine breakdowns and shutdowns
    • Liu B., Cao J. Analysis of a production inventory system with machine breakdowns and shutdowns. Computers and Operations Research 1999, 26(1):73-91.
    • (1999) Computers and Operations Research , vol.26 , Issue.1 , pp. 73-91
    • Liu, B.1    Cao, J.2
  • 17
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • Kuhn H. A dynamic lot sizing model with exponential machine breakdowns. European Journal of Operational Research 1997, 100(3):514-536.
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 514-536
    • Kuhn, H.1
  • 18
    • 0031232875 scopus 로고    scopus 로고
    • An extended optimal lot sizing model with an unreliable machine
    • Kim C.H., Hong Y., Kim S.Y. An extended optimal lot sizing model with an unreliable machine. Production Planning & Control 1997, 8(6):577-585.
    • (1997) Production Planning & Control , vol.8 , Issue.6 , pp. 577-585
    • Kim, C.H.1    Hong, Y.2    Kim, S.Y.3
  • 19
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdown
    • Chung K. Bounds for production lot sizing with machine breakdown. Computers & Industrial Engineering 1997, 32(1):139-144.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.1 , pp. 139-144
    • Chung, K.1
  • 20
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • Chung K.L., Hausmann W.H. Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Research Logistics 1997, 44(3):257-272.
    • (1997) Naval Research Logistics , vol.44 , Issue.3 , pp. 257-272
    • Chung, K.L.1    Hausmann, W.H.2
  • 22
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdowns
    • Chung K.J. Bounds for production lot sizing with machine breakdowns. Computers & Industrial Engineering 1997, 32(1):139-144.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.1 , pp. 139-144
    • Chung, K.J.1
  • 23
    • 0031273569 scopus 로고    scopus 로고
    • Analysis of a production/inventory system subject to random disruptions
    • Moinzadeh K., Aggarwal P. Analysis of a production/inventory system subject to random disruptions. Management Science 1997, 43(11):1577-1588.
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1577-1588
    • Moinzadeh, K.1    Aggarwal, P.2
  • 24
    • 0031141332 scopus 로고    scopus 로고
    • An extended EMQ model for a failure prone machine with general lifetime distribution
    • Kim C.H., Hong Y. An extended EMQ model for a failure prone machine with general lifetime distribution. International Journal of Production Economics 1997, 49(3):215-223.
    • (1997) International Journal of Production Economics , vol.49 , Issue.3 , pp. 215-223
    • Kim, C.H.1    Hong, Y.2
  • 25
    • 0027927229 scopus 로고
    • Production inventory system with unreliable machines
    • Berg M., Posner M.J.M., Zhao H. Production inventory system with unreliable machines. Operations Research 1994, 42(1):111-118.
    • (1994) Operations Research , vol.42 , Issue.1 , pp. 111-118
    • Berg, M.1    Posner, M.J.M.2    Zhao, H.3
  • 26
    • 0028548762 scopus 로고
    • Joint determination of production quantity, inspection schedule, and control chart design
    • Rahim M.A. Joint determination of production quantity, inspection schedule, and control chart design. IIE Transactions 1994, 26(6):2-11.
    • (1994) IIE Transactions , vol.26 , Issue.6 , pp. 2-11
    • Rahim, M.A.1
  • 27
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • Boone T., Ganeshan R., Guo Y., Ord J. The impact of imperfect processes on production run times. Decision Sciences 2000, 31(4):773-787.
    • (2000) Decision Sciences , vol.31 , Issue.4 , pp. 773-787
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.4
  • 28
    • 46149086146 scopus 로고    scopus 로고
    • Production lot sizing with process deterioration and machine breakdown under inspection schedule
    • Chakraborty T., Giri B.C., Chaudhuri K.S. Production lot sizing with process deterioration and machine breakdown under inspection schedule. Omega 2009, 37:257-271.
    • (2009) Omega , vol.37 , pp. 257-271
    • Chakraborty, T.1    Giri, B.C.2    Chaudhuri, K.S.3
  • 29
    • 0024622482 scopus 로고
    • Optimal control of a linear trend process with quadratic loss
    • Drezner Z., Wesolowsky G.O. Optimal control of a linear trend process with quadratic loss. IIE Transactions 1989, 21:66-72.
    • (1989) IIE Transactions , vol.21 , pp. 66-72
    • Drezner, Z.1    Wesolowsky, G.O.2
  • 31
    • 0030168581 scopus 로고    scopus 로고
    • Optimal tool replacement with asymmetric quadratic loss
    • Makis V. Optimal tool replacement with asymmetric quadratic loss. IIE Transactions 1996, 28(6):463-466.
    • (1996) IIE Transactions , vol.28 , Issue.6 , pp. 463-466
    • Makis, V.1
  • 34
    • 38949188721 scopus 로고    scopus 로고
    • Process mean, process tolerance, and use time determination for product life application under deteriorating process
    • Jeang A., Chung Chien-Ping Process mean, process tolerance, and use time determination for product life application under deteriorating process. International Journal of Advanced Manufacturing Technology 2008, 36(1-2):97-113.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.1-2 , pp. 97-113
    • Jeang, A.1    Chung, C.-P.2
  • 35
    • 77955423001 scopus 로고    scopus 로고
    • Optimal determination of process means, process tolerances, and resetting cycle for process planning under process shifting
    • Jeang A. Optimal determination of process means, process tolerances, and resetting cycle for process planning under process shifting. Journal of Manufacturing Systems 2010, 28(4):98-106.
    • (2010) Journal of Manufacturing Systems , vol.28 , Issue.4 , pp. 98-106
    • Jeang, A.1
  • 36
    • 33947261049 scopus 로고    scopus 로고
    • Optimal determination of production run and initial settings of process parameters for a deteriorating process
    • Rahim A., Khan M. Optimal determination of production run and initial settings of process parameters for a deteriorating process. International Journal of Advanced Manufacturing Technology 2007, 32(7-8):747-756.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.32 , Issue.7-8 , pp. 747-756
    • Rahim, A.1    Khan, M.2
  • 38
    • 34249288651 scopus 로고    scopus 로고
    • Economic manufacturing quantity, optimum process mean, and economic specification limits setting under the rectifying inspection plan
    • Chen C.H., Lai M.T. Economic manufacturing quantity, optimum process mean, and economic specification limits setting under the rectifying inspection plan. European Journal of Operational Research 2007, 183(1):336-344.
    • (2007) European Journal of Operational Research , vol.183 , Issue.1 , pp. 336-344
    • Chen, C.H.1    Lai, M.T.2
  • 40
    • 78650598834 scopus 로고    scopus 로고
    • Economic production order quantity and quality
    • Jeang A. Economic production order quantity and quality. International Journal of Production Research 2011, 49(6):1753-1783.
    • (2011) International Journal of Production Research , vol.49 , Issue.6 , pp. 1753-1783
    • Jeang, A.1
  • 42
    • 0028208112 scopus 로고
    • Tolerance design: choosing optimal tolerance specification in the design machined parts
    • Jeang A. Tolerance design: choosing optimal tolerance specification in the design machined parts. Quality and Reliability Engineering International 1994, 10(1):27-35.
    • (1994) Quality and Reliability Engineering International , vol.10 , Issue.1 , pp. 27-35
    • Jeang, A.1
  • 45
    • 0041783233 scopus 로고    scopus 로고
    • Reliable tool replacement policy for quality and cost
    • Jeang A. Reliable tool replacement policy for quality and cost. European Journal of Operational Research 1998, 108(2):334-344.
    • (1998) European Journal of Operational Research , vol.108 , Issue.2 , pp. 334-344
    • Jeang, A.1
  • 47
    • 0025403241 scopus 로고
    • Least cost tolerance allocation for mechanical assemblies with automated process selection
    • Chase K.W., Greenwood W.H., Loosli B.G., Hauglund L.F. Least cost tolerance allocation for mechanical assemblies with automated process selection. Manufacturing Review 1990, 3(1):49-59.
    • (1990) Manufacturing Review , vol.3 , Issue.1 , pp. 49-59
    • Chase, K.W.1    Greenwood, W.H.2    Loosli, B.G.3    Hauglund, L.F.4
  • 50
    • 70649114418 scopus 로고    scopus 로고
    • Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"
    • Chang H.C., Ho C.H. Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering". Omega 2010, 38(3-4):233-237.
    • (2010) Omega , vol.38 , Issue.3-4 , pp. 233-237
    • Chang, H.C.1    Ho, C.H.2
  • 51
    • 79551690259 scopus 로고    scopus 로고
    • The EPQ with partial backordering and phase-dependent backordering rate
    • Pentico D.W., Drake M.J., Toews C. The EPQ with partial backordering and phase-dependent backordering rate. Omega 2011, 39(5):574-577.
    • (2011) Omega , vol.39 , Issue.5 , pp. 574-577
    • Pentico, D.W.1    Drake, M.J.2    Toews, C.3
  • 52
    • 79957535321 scopus 로고    scopus 로고
    • A note on "The EPQ with partial backordering and phase-dependent backordering rate
    • Hsieh T.P., Dye C.Y. A note on "The EPQ with partial backordering and phase-dependent backordering rate. Omega 2012, 40(1):131-133.
    • (2012) Omega , vol.40 , Issue.1 , pp. 131-133
    • Hsieh, T.P.1    Dye, C.Y.2
  • 53
    • 80051923091 scopus 로고    scopus 로고
    • A supplement to the EPQ with partial backordering and phase-dependent backordering rate
    • Wee H.M., Wang W.T. A supplement to the EPQ with partial backordering and phase-dependent backordering rate. Omega 2012, 40(3):264-266.
    • (2012) Omega , vol.40 , Issue.3 , pp. 264-266
    • Wee, H.M.1    Wang, W.T.2
  • 54
    • 0035360680 scopus 로고    scopus 로고
    • An integrated economic design model for quality control, replacement, and maintenance
    • Lee B.H., Rahim M.A. An integrated economic design model for quality control, replacement, and maintenance. Quality Engineering 2001, 13(4):581-593.
    • (2001) Quality Engineering , vol.13 , Issue.4 , pp. 581-593
    • Lee, B.H.1    Rahim, M.A.2
  • 56
    • 77952551347 scopus 로고    scopus 로고
    • Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities
    • Yang S.J., Yang D.L. Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities. Omega 2010, 38(6):528-533.
    • (2010) Omega , vol.38 , Issue.6 , pp. 528-533
    • Yang, S.J.1    Yang, D.L.2
  • 58
    • 79953163480 scopus 로고    scopus 로고
    • Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell
    • Berthaut F., Gharbi A., Dhouib K. Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell. Omega 2011, 39(6):642-654.
    • (2011) Omega , vol.39 , Issue.6 , pp. 642-654
    • Berthaut, F.1    Gharbi, A.2    Dhouib, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.