메뉴 건너뛰기




Volumn 41, Issue 3, 2013, Pages 510-516

Multi-product lot scheduling with backordering and shelf-life constraints

Author keywords

Backordering; Economic lot scheduling; Shelf life constraint

Indexed keywords

PRODUCTION CONTROL; SCHEDULING ALGORITHMS;

EID: 84866720908     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2012.06.004     Document Type: Article
Times cited : (17)

References (15)
  • 1
    • 0000183771 scopus 로고
    • A note on effect of production cost on shelf -life
    • Goyal S.K. A note on effect of production cost on shelf -life. International Journal of Production Research 1994, 32(9):2243-2245.
    • (1994) International Journal of Production Research , vol.32 , Issue.9 , pp. 2243-2245
    • Goyal, S.K.1
  • 2
    • 0031161584 scopus 로고    scopus 로고
    • An optimal algorithm for the basic period approach to the economic lot scheduling problem
    • Grznar J., Riggle C. An optimal algorithm for the basic period approach to the economic lot scheduling problem. Omega 1997, 25(3):355-364.
    • (1997) Omega , vol.25 , Issue.3 , pp. 355-364
    • Grznar, J.1    Riggle, C.2
  • 3
    • 3242776106 scopus 로고    scopus 로고
    • Optimal production policy with shelf life including shortages
    • Sharma S. Optimal production policy with shelf life including shortages. Journal of the Operational Research Society 2004, 55(8):902-909.
    • (2004) Journal of the Operational Research Society , vol.55 , Issue.8 , pp. 902-909
    • Sharma, S.1
  • 4
    • 38149063657 scopus 로고    scopus 로고
    • Incorporating fractional backordering in the multi-product manufacturing situation with shelf-lives
    • Sharma S. Incorporating fractional backordering in the multi-product manufacturing situation with shelf-lives. Journal of Engineering Manufacture 2006, 220(7):1151-1156.
    • (2006) Journal of Engineering Manufacture , vol.220 , Issue.7 , pp. 1151-1156
    • Sharma, S.1
  • 5
    • 34250810340 scopus 로고    scopus 로고
    • A procedure to optimize the constrained multiple-item production system
    • Sharma S. A procedure to optimize the constrained multiple-item production system. Journal of Engineering Manufacture 2007, 221(3):467-475.
    • (2007) Journal of Engineering Manufacture , vol.221 , Issue.3 , pp. 467-475
    • Sharma, S.1
  • 6
    • 43449138507 scopus 로고    scopus 로고
    • A modification for the carrying cost estimation with respect to the flexibility in production rate
    • Sharma S. A modification for the carrying cost estimation with respect to the flexibility in production rate. International Journal of Advanced Manufacturing Technology 2008, 36(11-12):1252-1260.
    • (2008) International Journal of Advanced Manufacturing Technology , vol.36 , Issue.11-12 , pp. 1252-1260
    • Sharma, S.1
  • 7
    • 52249092684 scopus 로고    scopus 로고
    • Revisiting the shelf life constrained multi-product manufacturing problem
    • Sharma S. Revisiting the shelf life constrained multi-product manufacturing problem. European Journal of Operational Research 2009, 193(1):129-139.
    • (2009) European Journal of Operational Research , vol.193 , Issue.1 , pp. 129-139
    • Sharma, S.1
  • 9
    • 0024881398 scopus 로고
    • Shelf life considerations in a family production context
    • Silver E.A. Shelf life considerations in a family production context. International Journal of Production Research 1989, 27(12):2021-2026.
    • (1989) International Journal of Production Research , vol.27 , Issue.12 , pp. 2021-2026
    • Silver, E.A.1
  • 10
    • 0001450111 scopus 로고
    • Dealing with a shelf life constraint in cyclic scheduling by adjusting both the cycle time and production rate
    • Silver E.A. Dealing with a shelf life constraint in cyclic scheduling by adjusting both the cycle time and production rate. International Journal of Production Research 1995, 33(3):623-629.
    • (1995) International Journal of Production Research , vol.33 , Issue.3 , pp. 623-629
    • Silver, E.A.1
  • 11
    • 79953127832 scopus 로고    scopus 로고
    • A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint
    • Tempelmeier H. A column generation heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint. Omega 2011, 39(6):627-633.
    • (2011) Omega , vol.39 , Issue.6 , pp. 627-633
    • Tempelmeier, H.1
  • 12
    • 0032209032 scopus 로고    scopus 로고
    • Single-machine scheduling of unit-time jobs with earliness and tardiness penalties
    • Verma S., Dessouky M. Single-machine scheduling of unit-time jobs with earliness and tardiness penalties. Mathematics of Operations Research 1998, 23(4):930-943.
    • (1998) Mathematics of Operations Research , vol.23 , Issue.4 , pp. 930-943
    • Verma, S.1    Dessouky, M.2
  • 13
  • 14
    • 0031168341 scopus 로고    scopus 로고
    • Optimal cycle time and production rate in a family production context with shelf-life considerations
    • Viswanathan S., Goyal S.K. Optimal cycle time and production rate in a family production context with shelf-life considerations. International Journal of Production Research 1997, 35(6):1703-1711.
    • (1997) International Journal of Production Research , vol.35 , Issue.6 , pp. 1703-1711
    • Viswanathan, S.1    Goyal, S.K.2
  • 15
    • 0034628944 scopus 로고    scopus 로고
    • Incorporating planned backorders in a family production context with shelf-life considerations
    • Viswanathan S., Goyal S.K. Incorporating planned backorders in a family production context with shelf-life considerations. International Journal of Production Research 2000, 38(4):829-836.
    • (2000) International Journal of Production Research , vol.38 , Issue.4 , pp. 829-836
    • Viswanathan, S.1    Goyal, S.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.