Volumn 37, Issue 6, 2010, Pages 1002-1013

An anticipative scheduling approach with controllable processing times

Author keywords

Anticipative scheduling; Controllable processing times; Match up time; Reactive scheduling

Indexed keywords

COMPUTATIONAL RESULTS; CONTROLLABLE PROCESSING TIME; IDLE TIME; INITIAL SCHEDULE; JOB ASSIGNMENTS; JOB SEQUENCING; LIMITED CAPACITY; MACHINE SCHEDULES; MACHINE SCHEDULING; MANUFACTURING COST; PROCESSING TIME; PRODUCTION RESOURCES; REACTIVE SCHEDULING; TIME BUFFERS; TIME DISTRIBUTION; UP TIME;

EID: 71749091907     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2009.09.001     Document Type: Article
Times cited : (34)

References (16)
  • 1
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: a review and some future directions
    • Aytug H., Lawley M.A., McKay K., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: a review and some future directions. European Journal of Operational Research 161 (2005) 86-110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 2
    • 1642270229 scopus 로고    scopus 로고
    • Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures
    • Jensen M.T. Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures. Applied Soft Computing 1 (2001) 35-52
    • (2001) Applied Soft Computing , vol.1 , pp. 35-52
    • Jensen, M.T.1
  • 3
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon J., Wu S.D., and Storer R.H. Robustness measures and robust scheduling for job shops. IIE Transactions 26 (1994) 32-43
    • (1994) IIE Transactions , vol.26 , pp. 32-43
    • Leon, J.1    Wu, S.D.2    Storer, R.H.3
  • 5
    • 34249882437 scopus 로고    scopus 로고
    • Scheduling for stability in single-machine production systems
    • Leus R., and Herroelen W. Scheduling for stability in single-machine production systems. Journal of Scheduling 10 (2007) 223-235
    • (2007) Journal of Scheduling , vol.10 , pp. 223-235
    • Leus, R.1    Herroelen, W.2
  • 6
    • 40849087858 scopus 로고    scopus 로고
    • Predictive-reactive scheduling on a single resource with uncertain future jobs
    • Yang B., and Geunes J. Predictive-reactive scheduling on a single resource with uncertain future jobs. European Journal of Operational Research 189 (2008) 1267-1283
    • (2008) European Journal of Operational Research , vol.189 , pp. 1267-1283
    • Yang, B.1    Geunes, J.2
  • 7
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen W., and Leus R. On the merits and pitfalls of critical chain scheduling. Journal of Operations Management 19 (2001) 559-577
    • (2001) Journal of Operations Management , vol.19 , pp. 559-577
    • Herroelen, W.1    Leus, R.2
  • 8
    • 34249981704 scopus 로고    scopus 로고
    • Optimal allocation and processing time decisions on non-identical parallel CNC machines: ε{lunate}- constraint approach
    • Gürel S., and Aktürk M.S. Optimal allocation and processing time decisions on non-identical parallel CNC machines: ε{lunate}- constraint approach. European Journal of Operational Research 183 (2007) 591-607
    • (2007) European Journal of Operational Research , vol.183 , pp. 591-607
    • Gürel, S.1    Aktürk, M.S.2
  • 9
    • 34547404222 scopus 로고    scopus 로고
    • A survey of scheduling with controllable processing times
    • Shabtay D., and Steiner G. A survey of scheduling with controllable processing times. Discrete Applied Mathematics 155 13 (2007) 1643-1666
    • (2007) Discrete Applied Mathematics , vol.155 , Issue.13 , pp. 1643-1666
    • Shabtay, D.1    Steiner, G.2
  • 10
    • 0000229534 scopus 로고
    • Match-up scheduling with multiple resources, release dates and disruptions
    • Bean J.C., Birge J.R., Mittenthal J., and Noon C.E. Match-up scheduling with multiple resources, release dates and disruptions. Operations Research 39 3 (1991) 470-483
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 12
    • 76549090186 scopus 로고    scopus 로고
    • Parallel machine match-up scheduling with manufacturing cost considerations
    • to appear, doi:10.1007/s10951-009-0111-2
    • Aktürk MS, Atamtürk A, Gürel S. Parallel machine match-up scheduling with manufacturing cost considerations. Journal of Scheduling, 2009, to appear, doi:10.1007/s10951-009-0111-2.
    • (2009) Journal of Scheduling
    • Aktürk, M.S.1    Atamtürk, A.2    Gürel, S.3
  • 13
    • 13544276185 scopus 로고    scopus 로고
    • A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
    • Kayan R.K., and Aktürk M.S. A new bounding mechanism for the CNC machine scheduling problems with controllable processing times. European Journal of Operational Research 167 (2005) 624-643
    • (2005) European Journal of Operational Research , vol.167 , pp. 624-643
    • Kayan, R.K.1    Aktürk, M.S.2
  • 14
    • 64949093409 scopus 로고    scopus 로고
    • A strong conic quadratic reformulation for machine-job assignment with controllable processing times
    • Aktürk M.S., Atamtürk A., and Gürel S. A strong conic quadratic reformulation for machine-job assignment with controllable processing times. Operations Research Letters 37 (2009) 187-191
    • (2009) Operations Research Letters , vol.37 , pp. 187-191
    • Aktürk, M.S.1    Atamtürk, A.2    Gürel, S.3
  • 16
    • 0026897390 scopus 로고
    • Single machine flow-time scheduling with scheduled maintenance
    • Lee C.Y., and Liman S.D. Single machine flow-time scheduling with scheduled maintenance. Acta Informatica 29 (1992) 375-382
    • (1992) Acta Informatica , vol.29 , pp. 375-382
    • Lee, C.Y.1    Liman, S.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.