-
2
-
-
76649127720
-
Long-term probabilistic evaluation of operating reserve requirements with renewable sources
-
A.L. Silva, W. Sales, L. Manso, and R. Billinton Long-term probabilistic evaluation of operating reserve requirements with renewable sources IEEE Trans Power Syst 25 1 2010
-
(2010)
IEEE Trans Power Syst
, vol.25
, Issue.1
-
-
Silva, A.L.1
Sales, W.2
Manso, L.3
Billinton, R.4
-
3
-
-
78649355843
-
Assessing the impact of wind power generation on operating costs
-
M. Ortega-Vazquez, and D. Kirschen Assessing the impact of wind power generation on operating costs IEEE Trans Smart Grid 1 3 2010
-
(2010)
IEEE Trans Smart Grid
, vol.1
, Issue.3
-
-
Ortega-Vazquez, M.1
Kirschen, D.2
-
4
-
-
79955525885
-
Setting the operating reserve using probabilistic wind power forecasts
-
M. Matos, and R.J. Bessa setting the operating reserve using probabilistic wind power forecasts IEEE Trans Power Syst 26 2 2011
-
(2011)
IEEE Trans Power Syst
, vol.26
, Issue.2
-
-
Matos, M.1
Bessa, R.J.2
-
5
-
-
84883234089
-
Reserve setting and steady-state security assessment using wind power uncertainty forecast: A case study
-
R.J. Bessa, I. Matos, L. Costa, I.F. Bremermann, R. Pesatana, and N. Machado Reserve setting and steady-state security assessment using wind power uncertainty forecast: a case study IEEE Trans Sustain Energy 3 4 2012 827 836
-
(2012)
IEEE Trans Sustain Energy
, vol.3
, Issue.4
, pp. 827-836
-
-
Bessa, R.J.1
Matos, I.2
Costa, L.3
Bremermann, I.F.4
Pesatana, R.5
Machado, N.6
-
6
-
-
80054900192
-
Reserve requirements for wind power integration: A scenario-based stochastic programming framework
-
A. Papavasilion, Sh. Oren, and R. O'Neill Reserve requirements for wind power integration: a scenario-based stochastic programming framework IEEE Trans Power Syst 26 4 2011 2197 2206
-
(2011)
IEEE Trans Power Syst
, vol.26
, Issue.4
, pp. 2197-2206
-
-
Papavasilion, A.1
Oren Sh.2
O'Neill, R.3
-
7
-
-
69649109337
-
Probabilistic evaluation of reserve requirements of generation systems with renewable power sources: The Portuguese and Spanish cases
-
M. Mastos, J. Lopes, M. Rosa, R. Ferreira, A. Silva, and W. Sales Probabilistic evaluation of reserve requirements of generation systems with renewable power sources: the Portuguese and Spanish cases Electric Power Energy Syst 31 2009 562 569
-
(2009)
Electric Power Energy Syst
, vol.31
, pp. 562-569
-
-
Mastos, M.1
Lopes, J.2
Rosa, M.3
Ferreira, R.4
Silva, A.5
Sales, W.6
-
8
-
-
79960577825
-
Operating reserve policies with high wind power penetration
-
J. Xiao, B. Hodge, J. Pekny, and G. Rekliatis Operating reserve policies with high wind power penetration Comput Chem Eng 35 2011 1876 1885
-
(2011)
Comput Chem Eng
, vol.35
, pp. 1876-1885
-
-
Xiao, J.1
Hodge, B.2
Pekny, J.3
Rekliatis, G.4
-
9
-
-
67349249985
-
Economic valuation of reserves in power systems with high penetration of wind power
-
J. Morales, A. Conejo, and J. Perez-Ruiz Economic valuation of reserves in power systems with high penetration of wind power IEEE Trans Power Syst 24 2 2009 900 910
-
(2009)
IEEE Trans Power Syst
, vol.24
, Issue.2
, pp. 900-910
-
-
Morales, J.1
Conejo, A.2
Perez-Ruiz, J.3
-
10
-
-
33947366923
-
Optimizing the spinning reserve requirements using a cost/benefit analysis
-
M. Ortega-Vazquez, and D. Kirschen Optimizing the spinning reserve requirements using a cost/benefit analysis IEEE Trans Power Syst 22 1 2007
-
(2007)
IEEE Trans Power Syst
, vol.22
, Issue.1
-
-
Ortega-Vazquez, M.1
Kirschen, D.2
-
11
-
-
80053187261
-
Reliability modeling and control schemes of composite energy storage and wind generation system with adequate transmission upgrades
-
Y. Zhang, S. Zhu, and A. Chowdhury Reliability modeling and control schemes of composite energy storage and wind generation system with adequate transmission upgrades IEEE Trans Sustain Energy 2 4 2011
-
(2011)
IEEE Trans Sustain Energy
, vol.2
, Issue.4
-
-
Zhang, Y.1
Zhu, S.2
Chowdhury, A.3
-
12
-
-
84883222957
-
Commitment and dispatch with uncertain wind generation by dynamic programming
-
J. Hargreaves, and B. Hobbs Commitment and dispatch with uncertain wind generation by dynamic programming IEEE Trans Sustain Energy 3 4 2012 724 734
-
(2012)
IEEE Trans Sustain Energy
, vol.3
, Issue.4
, pp. 724-734
-
-
Hargreaves, J.1
Hobbs, B.2
-
14
-
-
80054951518
-
Well-being analysis of wind integrated power systems
-
R. Billinton, and B. Karki Well-being analysis of wind integrated power systems IEEE Trans Power Syst 26 4 2011 2101 2108
-
(2011)
IEEE Trans Power Syst
, vol.26
, Issue.4
, pp. 2101-2108
-
-
Billinton, R.1
Karki, B.2
-
15
-
-
77955282366
-
Optimal reserve capacity allocation with consideration of customer reliability requirements
-
M. Najafi, M. Ehsan, M. Fotuhi-Firuzabad, A. Akhavein, and K. Afshar Optimal reserve capacity allocation with consideration of customer reliability requirements Energy 35 2010 3883 3890
-
(2010)
Energy
, vol.35
, pp. 3883-3890
-
-
Najafi, M.1
Ehsan, M.2
Fotuhi-Firuzabad, M.3
Akhavein, A.4
Afshar, K.5
-
16
-
-
0141894809
-
Reliability-based reserve management in a bilateral power market
-
P. Wang, and L. Goel Reliability-based reserve management in a bilateral power market Electric Power Syst Res 67 2003 185 189
-
(2003)
Electric Power Syst Res
, vol.67
, pp. 185-189
-
-
Wang, P.1
Goel, L.2
-
17
-
-
39449117156
-
A new approach for reserve market clearing and cost allocating in a pool model
-
K. Afshar, M. Ehsan, M. Fotuhi-Firuzabad, A. Ahmadi-Khatir, and N. Bigdeli A new approach for reserve market clearing and cost allocating in a pool model Iran J Sci Technol, Trans B, Eng 31 B6 2007 593 602
-
(2007)
Iran J Sci Technol, Trans B, Eng
, vol.31
, Issue.B6
, pp. 593-602
-
-
Afshar, K.1
Ehsan, M.2
Fotuhi-Firuzabad, M.3
Ahmadi-Khatir, A.4
Bigdeli, N.5
-
18
-
-
67649850570
-
Customer choice of reliability in spinning reserve procurement and cost allocation using well-being analysis
-
A. Ahmadi-Khatir, M. Fotuhi-Firuzabad, and L. Goel Customer choice of reliability in spinning reserve procurement and cost allocation using well-being analysis Electric Power Syst Res 79 2009 1431 1440
-
(2009)
Electric Power Syst Res
, vol.79
, pp. 1431-1440
-
-
Ahmadi-Khatir, A.1
Fotuhi-Firuzabad, M.2
Goel, L.3
-
19
-
-
79551685744
-
A probabilistic spinning reserve market model considering Disco' different value of lost load
-
A. Ahmadi-Khatir, and R. Cherkaoui A probabilistic spinning reserve market model considering Disco' different value of lost load Electric Power Syst Res 81 2011 862 872
-
(2011)
Electric Power Syst Res
, vol.81
, pp. 862-872
-
-
Ahmadi-Khatir, A.1
Cherkaoui, R.2
-
20
-
-
84875461852
-
A new approach for determination and cost allocation of reserve in the restructured power systems
-
K. Afshar, and M.M. Barati A new approach for determination and cost allocation of reserve in the restructured power systems Electric Power Syst Res 100 2013 25 33
-
(2013)
Electric Power Syst Res
, vol.100
, pp. 25-33
-
-
Afshar, K.1
Barati, M.M.2
-
21
-
-
0024719222
-
A reliability test system for educational purposes - Basic data
-
R. Billinton A reliability test system for educational purposes - basic data IEEE Trans Power Syst 4 3 1989 1238 1244
-
(1989)
IEEE Trans Power Syst
, vol.4
, Issue.3
, pp. 1238-1244
-
-
Billinton, R.1
-
22
-
-
28244448538
-
Market-clearing with stochastic security - Part II: Case studies
-
F. Bouffard, F.D. Galiana, and A.J. Conejo Market-clearing with stochastic security - part II: case studies IEEE Trans Power Syst 20 4 2005 1827 1835
-
(2005)
IEEE Trans Power Syst
, vol.20
, Issue.4
, pp. 1827-1835
-
-
Bouffard, F.1
Galiana, F.D.2
Conejo, A.J.3
-
23
-
-
84884890544
-
-
GAMS Release 2.50. A user's guide
-
GAMS Release 2.50. A user's guide. GAMS Development Corporation; 1999. Available from: < http://www.gams.com >.
-
(1999)
GAMS Development Corporation
-
-
-
24
-
-
84917700355
-
-
The MathWorks, MATLAB [Online]
-
The MathWorks, MATLAB [Online]. Available: < http://www.mathworks.com >.
-
-
-
|