메뉴 건너뛰기




Volumn 35, Issue 9, 2010, Pages 3883-3890

Optimal reserve capacity allocation with consideration of customer reliability requirements

Author keywords

Cost benefit trade off; Flexible Value of Lost Load (FVOLL); Interruptible Loads (ILs); Optimal reserve capacity; Reliability requirements; Stochastic capacity allocation

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; COST EFFECTIVENESS; COSTS; CUSTOMER SATISFACTION; DECISION MAKING; ELECTRIC LOAD MANAGEMENT; MONTE CARLO METHODS; OPTIMIZATION; OUTAGES; RELIABILITY; STOCHASTIC SYSTEMS;

EID: 77955282366     PISSN: 03605442     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.energy.2010.05.044     Document Type: Article
Times cited : (24)

References (17)
  • 1
    • 49249086942 scopus 로고    scopus 로고
    • Cost of reliability analysis based on stochastic unit commitment
    • Wu L., Member I.E.E.E., Shahidehpour M., Li T. Cost of reliability analysis based on stochastic unit commitment. IEEE Trans Power Syst 2008, 23(3):1364-1373.
    • (2008) IEEE Trans Power Syst , vol.23 , Issue.3 , pp. 1364-1373
    • Wu, L.1    Member, I.E.E.E.2    Shahidehpour, M.3    Li, T.4
  • 2
    • 13844320119 scopus 로고    scopus 로고
    • Operating reserve model in the power market
    • Wang J., Wang X., Wu Y. Operating reserve model in the power market. IEEE Trans Power Syst 2005, 20(1):223-229.
    • (2005) IEEE Trans Power Syst , vol.20 , Issue.1 , pp. 223-229
    • Wang, J.1    Wang, X.2    Wu, Y.3
  • 3
    • 38649141554 scopus 로고    scopus 로고
    • Cost-benefit analysis and MILP for optimal reserve capacity determination in power system
    • Afshar K., Ehsan M., Fotuhi-Firuzabad M., Amjady N. Cost-benefit analysis and MILP for optimal reserve capacity determination in power system. Appl Math Comput 2008, 196:752-761.
    • (2008) Appl Math Comput , vol.196 , pp. 752-761
    • Afshar, K.1    Ehsan, M.2    Fotuhi-Firuzabad, M.3    Amjady, N.4
  • 4
    • 39149113484 scopus 로고    scopus 로고
    • A method for reserve clearing in disaggregated model considering lost opportunity cost
    • Afshar K., Ehsan M., Fotuhi-Firuzabad M., Amjady N. A method for reserve clearing in disaggregated model considering lost opportunity cost. Elect Power Syst Res 2008, 78:527-538.
    • (2008) Elect Power Syst Res , vol.78 , pp. 527-538
    • Afshar, K.1    Ehsan, M.2    Fotuhi-Firuzabad, M.3    Amjady, N.4
  • 5
    • 63449126606 scopus 로고    scopus 로고
    • Joint market clearing in a stochastic framework considering power system security
    • Aghaei J., Shayanfar H.A., Amjady N. Joint market clearing in a stochastic framework considering power system security. Appl Energy 2009, 86:1675-1682.
    • (2009) Appl Energy , vol.86 , pp. 1675-1682
    • Aghaei, J.1    Shayanfar, H.A.2    Amjady, N.3
  • 6
    • 77949266047 scopus 로고    scopus 로고
    • Evolution and current status of demand response (DR) in electricity markets: insights from PJM and NYISO
    • Walawalkar R., Fernands S., Thakur N., Chevva K.R. Evolution and current status of demand response (DR) in electricity markets: insights from PJM and NYISO. Energy 2010, 35(4):1553-1560.
    • (2010) Energy , vol.35 , Issue.4 , pp. 1553-1560
    • Walawalkar, R.1    Fernands, S.2    Thakur, N.3    Chevva, K.R.4
  • 7
    • 77950341803 scopus 로고    scopus 로고
    • A probabilistic risk-based approach for spinning reserve provision using day-ahead demand response program
    • Shayesteh E., Yousefi A., Parsa Moghaddam M. A probabilistic risk-based approach for spinning reserve provision using day-ahead demand response program. Energy 2010, 35(5):1908-1915.
    • (2010) Energy , vol.35 , Issue.5 , pp. 1908-1915
    • Shayesteh, E.1    Yousefi, A.2    Parsa Moghaddam, M.3
  • 8
    • 77949272222 scopus 로고    scopus 로고
    • Demand participation in the restructured Electric Reliability Council of Texas market
    • Zarnikau J.W. Demand participation in the restructured Electric Reliability Council of Texas market. Energy 2010, 35(4):1536-1543.
    • (2010) Energy , vol.35 , Issue.4 , pp. 1536-1543
    • Zarnikau, J.W.1
  • 9
    • 0031599298 scopus 로고    scopus 로고
    • Prediction of domestic, industrial and commercial interruption costs by relational approach
    • APSCOM-97 (Conf. Publ. No. 450)
    • Mok Y.L., Chung T.S. Prediction of domestic, industrial and commercial interruption costs by relational approach. Proc. 4th Int. Conf. advances in power system control, operation and management 1997, APSCOM-97 (Conf. Publ. No. 450), p. 209-15.
    • (1997) Proc. 4th Int. Conf. advances in power system control, operation and management , pp. 209-215
    • Mok, Y.L.1    Chung, T.S.2
  • 10
    • 0027543575 scopus 로고
    • Markets and pricing for interruptible electric power
    • Gedra T.W., Varaiya P.P. Markets and pricing for interruptible electric power. IEEE Trans Power Syst 1993, 8(1):122-128.
    • (1993) IEEE Trans Power Syst , vol.8 , Issue.1 , pp. 122-128
    • Gedra, T.W.1    Varaiya, P.P.2
  • 11
    • 0034186729 scopus 로고    scopus 로고
    • Real time optimal interruptible tariff mechanism incorporating utility-customer interactions
    • Bhattacharya K., Bollen H.J.M., Daalder J.E. Real time optimal interruptible tariff mechanism incorporating utility-customer interactions. IEEE Trans Power Syst 2000, 15(2):700-706.
    • (2000) IEEE Trans Power Syst , vol.15 , Issue.2 , pp. 700-706
    • Bhattacharya, K.1    Bollen, H.J.M.2    Daalder, J.E.3
  • 12
    • 33751071102 scopus 로고    scopus 로고
    • Scenario reduction in stochastic programming: an approach using probability metrics
    • Dupačová J., Gröwe-Kuska N., Römisch W. Scenario reduction in stochastic programming: an approach using probability metrics. Math Program Ser A 2003, 95:493-511.
    • (2003) Math Program Ser A , vol.95 , pp. 493-511
    • Dupačová, J.1    Gröwe-Kuska, N.2    Römisch, W.3
  • 13
    • 0032592961 scopus 로고    scopus 로고
    • The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System. Task Force of the Application of Probability Methods Subcommittee
    • Grigg C., Wong P., Albrecht P., Allan R., Bhavaraju M., Billinton R., et al. The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System. Task Force of the Application of Probability Methods Subcommittee. IEEE Trans Power Syst 1999, 14(3):1010-1020.
    • (1999) IEEE Trans Power Syst , vol.14 , Issue.3 , pp. 1010-1020
    • Grigg, C.1    Wong, P.2    Albrecht, P.3    Allan, R.4    Bhavaraju, M.5    Billinton, R.6
  • 14
    • 0027647348 scopus 로고
    • Effects of ramp-rate limits on unit commitment and economic dispatch
    • Wang C., Shahidehpour S.M. Effects of ramp-rate limits on unit commitment and economic dispatch. IEEE Trans Power Syst 1993, 8(3):1341-1350.
    • (1993) IEEE Trans Power Syst , vol.8 , Issue.3 , pp. 1341-1350
    • Wang, C.1    Shahidehpour, S.M.2
  • 16
    • 85018028507 scopus 로고    scopus 로고
    • http://www.neplan.ch.
  • 17
    • 85018005161 scopus 로고    scopus 로고
    • GAMS: a user's guide
    • GAMS: a user's guide. http://www.gams.com.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.