메뉴 건너뛰기




Volumn 2, Issue 4, 2011, Pages 520-526

Reliability modeling and control schemes of composite energy storage and wind generation system with adequate transmission upgrades

Author keywords

Energy storage; planning; reliability; renewable; transmission upgrade; wind generation

Indexed keywords

COMPOSITE ENERGY; IEEE-RELIABILITY TEST SYSTEM; INTERMITTENCY; ON-SITE ENERGY; POTENTIAL NEEDS; PROBABILISTIC RELIABILITY ASSESSMENT; RELIABILITY MODELING; RENEWABLE; TRANSMISSION EXPANSION; WIND FARM; WIND GENERATION; WIND GENERATION SYSTEM;

EID: 80053187261     PISSN: 19493029     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSTE.2011.2160663     Document Type: Article
Times cited : (60)

References (10)
  • 1
    • 52349086797 scopus 로고    scopus 로고
    • CAISO [Online]
    • CAISO, Integration of Renewable Resources 2007 [Online].Available: http://www.caiso.com/1ca5/1ca5a7a026270.pdf
    • (2007) Integration of Renewable Resources
  • 3
    • 79956365865 scopus 로고    scopus 로고
    • Probabilistic wind energy modeling in electric generation system reliability assessment
    • May/Jun
    • Y. Zhang, A. A. Chowdhury, and D. O. Koval, "Probabilistic wind energy modeling in electric generation system reliability assessment," IEEE Trans. Ind. Appl., vol. 47, no. 3, pp. 1507-1514, May/Jun. 2011.
    • (2011) IEEE Trans. Ind. Appl. , vol.47 , Issue.3 , pp. 1507-1514
    • Zhang, Y.1    Chowdhury, A.A.2    Koval, D.O.3
  • 4
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • DOI 10.1016/0026-2714(95)00154-9
    • R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Reliability, vol. 36, no. 9, pp. 1253-1261, 1996. (Pubitemid 126378823)
    • (1996) Microelectronics Reliability , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 5
    • 79956342844 scopus 로고    scopus 로고
    • Reliability assessment of wind generation in planning and operating phases in generation system
    • Calgary, Canada, Jul. 26-30
    • Y. Zhang and A. A. Chowdhury, "Reliability assessment of wind generation in planning and operating phases in generation system," in Proc. IEEE PES 2009 General Meeting, Calgary, Canada, Jul. 26-30, 2009.
    • (2009) Proc. IEEE PES 2009 General Meeting
    • Zhang, Y.1    Chowdhury, A.A.2
  • 9
    • 0018040081 scopus 로고
    • Reliability evaluation in energy limited generating capacity studies
    • R. Billionton and P. Harrington, "Reliability evaluation in energy limited generating capacity studies," IEEE Trans. Power Apparat. Syst., vol. PAS-97, no. 6, pp. 2076-2085, Nov./Dec., 1978. (Pubitemid 9413495)
    • (1978) IEEE Trans Power Appar Syst , vol.PAS-97 , Issue.6 , pp. 2076-2085
    • Billinton Roy1    Harrington Patrick, G.2
  • 10
    • 80053177398 scopus 로고    scopus 로고
    • Transmission Economic Assessment Methodology (TEAM) [Online]. Available
    • California ISO, Transmission Economic Assessment Methodology (TEAM) [Online]. Available: http://www.caiso.com/docs/2004/06/03/ 2004060313241622985. pdf


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.