메뉴 건너뛰기




Volumn 22, Issue 1, 2007, Pages 24-33

Optimizing the spinning reserve requirements using a cost/benefit analysis

Author keywords

Expected energy not served (EENS); Loss of load probability (LOLP); Mixed integer programming (MIP); Power generation dispatch; Power generation scheduling; Spinning reserve (SR); Value of lost load (VOLL)

Indexed keywords

ELECTRIC LOAD SHEDDING; ELECTRIC POWER GENERATION; INTEGER PROGRAMMING; ITERATIVE METHODS; OPTIMIZATION; PROBABILITY;

EID: 33947366923     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2006.888951     Document Type: Article
Times cited : (224)

References (26)
  • 2
    • 33947406760 scopus 로고    scopus 로고
    • "A survey of definitions and specifications of reserve services"
    • [Online]. Available
    • Y. Rebours and D. S. Kirschen, "A survey of definitions and specifications of reserve services," 2005. [Online]. Available: http://www.umist.ac.uk/departments/mcee/research/Publications/ uom-survey_reserve_services-2005.pdf.
    • (2005)
    • Rebours, Y.1    Kirschen, D.S.2
  • 3
    • 33947373904 scopus 로고    scopus 로고
    • CAISO, Spinning Reserve Requirements, [Online]. Available
    • CAISO, "The California ISO," Spinning Reserve Requirements, 2005. [Online]. Available: http://www.caiso.com/.
    • (2005)
  • 4
    • 33947420066 scopus 로고    scopus 로고
    • "The independent electricity system operator of Ontario electrical system"
    • IESO, [Online]. Available
    • IESO, "The independent electricity system operator of Ontario electrical system," 2004. [Online]. Available: http://www.ieso.ca/.
    • (2004)
  • 5
    • 33947360662 scopus 로고    scopus 로고
    • "Red eléctrica de españa"
    • REE, Operación del Sistema Eléctrico, [Online]. Available
    • REE, "Red eléctrica de españa," Operación del Sistema Eléctrico, 1998. [Online]. Available: http://www.ree.es/cap03/pdf/po/PO_resol_30jul1998_b.pdf.
    • (1998)
  • 7
    • 33947420381 scopus 로고    scopus 로고
    • PJM, Scheduling Operation, [Online]. Available
    • PJM, "Pennsylvania-New Jersey-Maryland," Scheduling Operation, 2004. [Online]. Available: http://www.pjm.com/contributions/ pjm-manuals/pdf/m11v22.pdf.
    • (2004)
  • 8
    • 84937657196 scopus 로고
    • "Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection"
    • Oct
    • L. T. Anstine, R. E. Burke, J. E. Casey, R. Holgate, R. S. John, and H. G. Stewart, "Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection," IEEE Trans. Power App. Syst., vol. PAS-82, no. 68, pp. 720-735, Oct. 1963.
    • (1963) IEEE Trans. Power App. Syst. , vol.PAS-82 , Issue.68 , pp. 720-735
    • Anstine, L.T.1    Burke, R.E.2    Casey, J.E.3    Holgate, R.4    John, R.S.5    Stewart, H.G.6
  • 10
    • 0032652412 scopus 로고    scopus 로고
    • "Optimal scheduling of spinning reserve with ramp constraints"
    • in New York
    • H. Wu and H. B. Gooi, "Optimal scheduling of spinning reserve with ramp constraints," in Proc. IEEE Power Eng. Soc.Winter Meeting, New York, 1999, vol. 2, pp. 785-790.
    • (1999) Proc. IEEE Power Eng. Soc.Winter Meeting , vol.2 , pp. 785-790
    • Wu, H.1    Gooi, H.B.2
  • 12
    • 1442289950 scopus 로고    scopus 로고
    • "An electricity market with a probabilistic spinning reserve criterion"
    • Feb
    • F. Bouffard and F. D. Galiana, "An electricity market with a probabilistic spinning reserve criterion," IEEE Trans. Power Syst., vol. 19, no. 1, pp. 300-307, Feb. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.1 , pp. 300-307
    • Bouffard, F.1    Galiana, F.D.2
  • 13
    • 13844320119 scopus 로고    scopus 로고
    • "Operating reserve model in the power market"
    • Feb
    • J. X. Wang, X. F. Wang, and Y. Wu, "Operating reserve model in the power market," IEEE Trans. Power Syst., vol. 20, no. 1, pp. 223-229, Feb. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.1 , pp. 223-229
    • Wang, J.X.1    Wang, X.F.2    Wu, Y.3
  • 14
    • 0030109655 scopus 로고    scopus 로고
    • "Evaluation of reliability worth and value of lost load"
    • Mar
    • K. K. Kariuki and R. N. Allan, "Evaluation of reliability worth and value of lost load," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 143, no. 2, pp. 171-180, Mar. 1996.
    • (1996) Proc. Inst. Elect. Eng., Gen., Transm., Distrib. , vol.143 , Issue.2 , pp. 171-180
    • Kariuki, K.K.1    Allan, R.N.2
  • 15
    • 27744435546 scopus 로고    scopus 로고
    • "Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves"
    • Nov
    • F. D. Galiana, F. Bouffard, J. M. Arroyo, and J. F. Restrepo, "Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves," Proc. IEEE, vol. 93, no. 11, pp. 1970-1983, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 1970-1983
    • Galiana, F.D.1    Bouffard, F.2    Arroyo, J.M.3    Restrepo, J.F.4
  • 17
    • 28244483147 scopus 로고    scopus 로고
    • "Market-clearing with stochastic security-Part I: Formulation"
    • Nov
    • F. Bouffard, F. D. Galiana, and A. J. Conejo, "Market-clearing with stochastic security-Part I: Formulation," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1818-1826, Nov. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.4 , pp. 1818-1826
    • Bouffard, F.1    Galiana, F.D.2    Conejo, A.J.3
  • 18
    • 28244448538 scopus 로고    scopus 로고
    • "Market-clearing with stochastic security-Part II: Case studies"
    • Nov
    • F. Bouffard, F. D. Galiana, and A. J. Conejo, "Market-clearing with stochastic security-Part II: Case studies," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1827-1835, Nov. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , Issue.4 , pp. 1827-1835
    • Bouffard, F.1    Galiana, F.D.2    Conejo, A.J.3
  • 19
    • 84991065621 scopus 로고
    • "Algorithms for bilevel optimization"
    • [Online]. Available
    • N. Alexandrov and J. E. J. Dennis, "Algorithms for bilevel optimization," 1994. [Online]. Available: http:// techreports.larc.nasa.gov/icase/1994/icase-1994-77.pdf.
    • (1994)
    • Alexandrov, N.1    Dennis, J.E.J.2
  • 21
    • 33947392510 scopus 로고    scopus 로고
    • "Optimizing the spinning reserve requirements"
    • Ph.D. dissertation, Sch. Elect. Electron. Eng., Univ. Manchester, Manchester, U.K
    • M. A. Ortega-Vazquez, "Optimizing the spinning reserve requirements," Ph.D. dissertation, Sch. Elect. Electron. Eng., Univ. Manchester, Manchester, U.K., 2006.
    • (2006)
    • Ortega-Vazquez, M.A.1
  • 23
    • 0027647348 scopus 로고
    • "Effects of ramp-rate limits on unit commitment and economic-dispatch"
    • Aug
    • C. Wang and S. M. Shahidehpour, "Effects of ramp-rate limits on unit commitment and economic-dispatch," IEEE Trans. Power Syst., vol. 8, no. 3, pp. 1341-1350, Aug. 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , Issue.3 , pp. 1341-1350
    • Wang, C.1    Shahidehpour, S.M.2
  • 24
    • 0347808559 scopus 로고    scopus 로고
    • "Iterated grid search algorithm on unimodal criteria"
    • Ph.D. dissertation, Dept. Statist., Virginia Polytechnic Inst. and State Univ., Blacksburg, VA
    • J. Kim, "Iterated grid search algorithm on unimodal criteria," Ph.D. dissertation, Dept. Statist., Virginia Polytechnic Inst. and State Univ., Blacksburg, VA, 1997.
    • (1997)
    • Kim, J.1
  • 25
    • 0029252684 scopus 로고
    • "The generalized unit commitment problem"
    • Feb
    • R. Baldick, "The generalized unit commitment problem," IEEE Trans. Power Syst., vol. 10, no. 1, pp. 465-475, Feb. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , Issue.1 , pp. 465-475
    • Baldick, R.1
  • 26
    • 33947416996 scopus 로고    scopus 로고
    • "Modeling with Xpress-MP"
    • Dash and Associates, [Online]. Available
    • Dash and Associates, "Modeling with Xpress-MP," 2005. [Online]. Available: http://www.dashoptimization.com/home/downloads/pdf/ Modeling_with_Xpress-MP.pdf.
    • (2005)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.