메뉴 건너뛰기




Volumn 31, Issue 6, 2007, Pages 593-602

A new approach for reserve market clearing and cost allocating in a pool model

Author keywords

Cost allocation; Deregulation; Pool model; Public good; Reserve market; Well being

Indexed keywords

COSTS; CUSTOMER SATISFACTION; DEREGULATION; MARKETING;

EID: 39449117156     PISSN: 10286284     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (16)

References (20)
  • 3
    • 33846646524 scopus 로고    scopus 로고
    • Economic theory and the application of incentive contracts to procure operating reserve
    • Wang, L., Yu, C. W. & Wen, F. S. (2007). Economic theory and the application of incentive contracts to procure operating reserve. Electric Power Systems Research, Vol. 77, pp 518-526.
    • (2007) Electric Power Systems Research , vol.77 , pp. 518-526
    • Wang, L.1    Yu, C.W.2    Wen, F.S.3
  • 4
    • 0037190996 scopus 로고    scopus 로고
    • Fundamentals of operating reserve procurance using decentralized approach with insurance theory application
    • Chan, C. Y., Ni, Y. X. & Wu, F. F. (2002). Fundamentals of operating reserve procurance using decentralized approach with insurance theory application. Electric Power Systems Research, Vol. 63, No. 3, pp. 229-238.
    • (2002) Electric Power Systems Research , vol.63 , Issue.3 , pp. 229-238
    • Chan, C.Y.1    Ni, Y.X.2    Wu, F.F.3
  • 6
    • 9944232525 scopus 로고    scopus 로고
    • Pricing and procurement of operating reserve in competitive pool-based electricity markets
    • Yu, C. W., Zhao, X. S., Wen, F. S., Chung, C. Y., Chung, T. S. & Huang, M. X. (2005). Pricing and procurement of operating reserve in competitive pool-based electricity markets. Electric Power Systems Research, Vol. 73, No. 1, pp.37-43.
    • (2005) Electric Power Systems Research , vol.73 , Issue.1 , pp. 37-43
    • Yu, C.W.1    Zhao, X.S.2    Wen, F.S.3    Chung, C.Y.4    Chung, T.S.5    Huang, M.X.6
  • 7
    • 0344081236 scopus 로고    scopus 로고
    • Well-being analysis of spinning reserve in a bilateral power market
    • Goel, L., Song, Z. & Wang, P. (2004). Well-being analysis of spinning reserve in a bilateral power market. Electric Power Systems Research, Vol. 69, No. 1, pp.37-42.
    • (2004) Electric Power Systems Research , vol.69 , Issue.1 , pp. 37-42
    • Goel, L.1    Song, Z.2    Wang, P.3
  • 8
    • 1442289950 scopus 로고    scopus 로고
    • An electricity market with a probabilistic spinning reserve criterion
    • Bouffard, F. & Galiana, F. D. (2004). An electricity market with a probabilistic spinning reserve criterion. IEEE Transactions on Power Systems, Vol. 19, pp.300-307.
    • (2004) IEEE Transactions on Power Systems , vol.19 , pp. 300-307
    • Bouffard, F.1    Galiana, F.D.2
  • 9
    • 51849157303 scopus 로고    scopus 로고
    • Optimal dispatch of spinning reserve in a competitive electricity market using genetic algorithm
    • Canberra, Australia
    • Xu, Z., Dong, Z. Y. & Wong, K. P. (2003). Optimal dispatch of spinning reserve in a competitive electricity market using genetic algorithm. The 2003 Congress on Evolutionary Computation (CEC), Canberra, Australia, Vol.1, pp. 587-592.
    • (2003) The 2003 Congress on Evolutionary Computation (CEC) , vol.1 , pp. 587-592
    • Xu, Z.1    Dong, Z.Y.2    Wong, K.P.3
  • 10
    • 27744435546 scopus 로고    scopus 로고
    • Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves
    • Galiana, F., Bouffard, F., Arroyo, J. M. & Restrepo, J. F. (2005). Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves. Proceedings of the IEEE, Vol. 93, No. 11, pp. 1970-1983.
    • (2005) Proceedings of the IEEE , vol.93 , Issue.11 , pp. 1970-1983
    • Galiana, F.1    Bouffard, F.2    Arroyo, J.M.3    Restrepo, J.F.4
  • 11
    • 0028480974 scopus 로고
    • A basic framework for generating system operating health analysis
    • Billinton, R. & Fotuhi-Firuzabad, M. (1994). A basic framework for generating system operating health analysis. IEEE Transactions on Power Systems, Vol. 9, No. 3, pp. 1610-1617.
    • (1994) IEEE Transactions on Power Systems , vol.9 , Issue.3 , pp. 1610-1617
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 12
    • 0028482457 scopus 로고
    • Generating system operating health analysis considering stand-by units, interruptible load and postponable outages
    • Billinton, R. & Fotuhi-Firuzabad, M. (1994). Generating system operating health analysis considering stand-by units, interruptible load and postponable outages. IEEE Transactions on Power Systems, Vol. 9, No. 3, pp. 1618-1625.
    • (1994) IEEE Transactions on Power Systems , vol.9 , Issue.3 , pp. 1618-1625
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 13
    • 0030291434 scopus 로고    scopus 로고
    • Response health constraints in economic load dispatch considering standby units, interruptible loads and postponable outages
    • Fotuhi-Firuzabad, M., Billinton, R. & Aboreshaid, S. (1996). Response health constraints in economic load dispatch considering standby units, interruptible loads and postponable outages. IEE Proceedings- Generation, Transmission and Distribution, Vol. 143, No. 6, pp. 599-607.
    • (1996) IEE Proceedings- Generation, Transmission and Distribution , vol.143 , Issue.6 , pp. 599-607
    • Fotuhi-Firuzabad, M.1    Billinton, R.2    Aboreshaid, S.3
  • 15
    • 0031198387 scopus 로고    scopus 로고
    • Unit commitment health analysis for interconnected systems
    • Billinton, R. & Fotuhi-Firuzabad, M. (1997). Unit commitment health analysis for interconnected systems. IEEE Transactions on Power Systems, Vol. 12, No. 3, pp. 1194-1201.
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.3 , pp. 1194-1201
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 17
    • 0142135089 scopus 로고    scopus 로고
    • Reliability assessment of a restructured power system using reliability network equivalent techniques
    • Wang, P. & Billinton, R. (2003). Reliability assessment of a restructured power system using reliability network equivalent techniques. IEE Proceeding on Generation, Transmission and Distribution, Vol. 150, No. 5, pp. 555-560.
    • (2003) IEE Proceeding on Generation, Transmission and Distribution , vol.150 , Issue.5 , pp. 555-560
    • Wang, P.1    Billinton, R.2
  • 18
    • 33645898325 scopus 로고    scopus 로고
    • Technical and economic aspects of ancillary services markets in the electric power industry: An international comparison
    • Raineri, R., Rios, S. & Schiele, D. (2006). Technical and economic aspects of ancillary services markets in the electric power industry: an international comparison. Energy Policy, 34, 1540-1555.
    • (2006) Energy Policy , vol.34 , pp. 1540-1555
    • Raineri, R.1    Rios, S.2    Schiele, D.3
  • 19
    • 27744577488 scopus 로고    scopus 로고
    • Electricity market design: An integrated approach to reliability assurance
    • Chow, J. H., Mello, R. W. D. & Cheung, K. W. (2005). Electricity market design: an integrated approach to reliability assurance. Proceedings of the IEEE, Vol. 93, No. 11, 1956-1959.
    • (2005) Proceedings of the IEEE , vol.93 , Issue.11 , pp. 1956-1959
    • Chow, J.H.1    Mello, R.W.D.2    Cheung, K.W.3
  • 20
    • 39449127147 scopus 로고    scopus 로고
    • IEEE Committee Report, (1996). The IEEE reliability test system-1996, Report 96 WM 326-9 PWRS, presented at the IEEE Power Engineering Society Winter Meeting, Baltimore, MD, USA.
    • IEEE Committee Report, (1996). The IEEE reliability test system-1996, Report 96 WM 326-9 PWRS, presented at the IEEE Power Engineering Society Winter Meeting, Baltimore, MD, USA.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.