|
Volumn 18, Issue 3-4, 2002, Pages 223-231
|
Unrelated parallel machine scheduling with setup times using simulated annealing
a a b c |
Author keywords
Parallel machine scheduling; Simulated annealing; Total tardiness
|
Indexed keywords
HEURISTIC METHODS;
MACHINE DESIGN;
SCHEDULING;
SIMULATED ANNEALING;
PARALLEL MACHINE SCHEDULING;
COMPUTER INTEGRATED MANUFACTURING;
|
EID: 0036609211
PISSN: 07365845
EISSN: None
Source Type: Journal
DOI: 10.1016/S0736-5845(02)00013-3 Document Type: Conference Paper |
Times cited : (213)
|
References (28)
|