메뉴 건너뛰기




Volumn 3, Issue 4, 2001, Pages 321-336

A Simple, Robust Leadtime-Quoting Policy

Author keywords

Available to Promise; Capable to Promise; Customer Service; Leadtime Quoting

Indexed keywords


EID: 0345010141     PISSN: 15234614     EISSN: None     Source Type: Journal    
DOI: 10.1287/msom.3.4.321.9968     Document Type: Article
Times cited : (24)

References (19)
  • 1
    • 0027627910 scopus 로고
    • Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops
    • Adam, N. R., J. W. M. Bertrand, D. C. Morehead, J. Surkis. 1993. Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops. Euro. J. Oper. Res. 68 212-227.
    • (1993) Euro. J. Oper. Res. , vol.68 , pp. 212-227
    • Adam, N.R.1    Bertrand, J.W.M.2    Morehead, D.C.3    Surkis, J.4
  • 2
    • 0022160975 scopus 로고
    • Setting job-shop due dates with service-level constraints
    • Bookbinder, James H., Afzal Ibn Noor. 1985. Setting job-shop due dates with service-level constraints. J. Oper. Res. Society 36(11) 1017-1026.
    • (1985) J. Oper. Res. Society , vol.36 , Issue.11 , pp. 1017-1026
    • Bookbinder, J.H.1    Noor, A.I.2
  • 3
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E., M. C. Gupta. 1989. Survey of scheduling research involving due date determination decisions. Euro. J. Oper. Res. 38 156-166.
    • (1989) Euro. J. Oper. Res. , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 4
    • 0026241609 scopus 로고
    • Due date setting and production control
    • Dellaert, N. P. 1991. Due date setting and production control. Internat. J. Production Res. 23 56-67.
    • (1991) Internat. J. Production Res. , vol.23 , pp. 56-67
    • Dellaert, N.P.1
  • 5
    • 0001131108 scopus 로고
    • Single facility due date setting with multiple customer classes
    • Duenyas, I. 1995. Single facility due date setting with multiple customer classes. Management Sci. 41(4) 608-619.
    • (1995) Management Sci. , vol.41 , Issue.4 , pp. 608-619
    • Duenyas, I.1
  • 6
    • 0000538802 scopus 로고
    • Job shop leadtime requirements under conditions of controlled delivery performance
    • Enns, S. T. 1994. Job shop leadtime requirements under conditions of controlled delivery performance. Euro. J. Oper. Res. 77 429-439.
    • (1994) Euro. J. Oper. Res. , vol.77 , pp. 429-439
    • Enns, S.T.1
  • 7
    • 0024680497 scopus 로고
    • Due date assignment in a multistage job shop
    • Fry, T. D., P. R. Philipoom, R. E. Markland. 1989. Due date assignment in a multistage job shop. IIE Trans. 21(2) 1453-1461.
    • (1989) IIE Trans. , vol.21 , Issue.2 , pp. 1453-1461
    • Fry, T.D.1    Philipoom, P.R.2    Markland, R.E.3
  • 8
    • 0033079833 scopus 로고    scopus 로고
    • Earliness penalties on a machine subject to precedence constraints: SLK due date assignment
    • Gordon, V. S., V. A. Strusevich. 1999. Earliness penalties on a machine subject to precedence constraints: SLK due date assignment. Computers and Oper. Res. 26 157-177.
    • (1999) Computers and Oper. Res. , vol.26 , pp. 157-177
    • Gordon, V.S.1    Strusevich, V.A.2
  • 9
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • Hopp, W. J., M. L. Roof. 2000. Quoting manufacturing due dates subject to a service level constraint. IIE Trans. 32(9) 771-784.
    • (2000) IIE Trans. , vol.32 , Issue.9 , pp. 771-784
    • Hopp, W.J.1    Roof, M.L.2
  • 11
    • 0029393210 scopus 로고
    • Estimating flow times and setting due dates in complex production systems
    • Lawrence, S. R. 1995. Estimating flow times and setting due dates in complex production systems. IIE Trans. 27(5) 657-668.
    • (1995) IIE Trans. , vol.27 , Issue.5 , pp. 657-668
    • Lawrence, S.R.1
  • 12
    • 84990604706 scopus 로고
    • Using neural networks to determine internally-set due date assignments for shop scheduling
    • Philipoom, P. R., L. P. Rees, L. Wiegmann. 1994. Using neural networks to determine internally-set due date assignments for shop scheduling. Decision Sci. 25(5/6) 825-851.
    • (1994) Decision Sci. , vol.25 , Issue.5-6 , pp. 825-851
    • Philipoom, P.R.1    Rees, L.P.2    Wiegmann, L.3
  • 13
    • 0032028267 scopus 로고    scopus 로고
    • Scheduling a single machine to minimize earliness penalties subject to SLK due date determination method
    • Qi, X., F. S. Tu. 1998. Scheduling a single machine to minimize earliness penalties subject to SLK due date determination method. Euro. J. Oper. Res. 105 502-508.
    • (1998) Euro. J. Oper. Res. , vol.105 , pp. 502-508
    • Qi, X.1    Tu, F.S.2
  • 14
    • 0027656563 scopus 로고
    • The job shop tardiness problem: A decomposition approach
    • Raman, N., F. B. Talbot. 1993. The job shop tardiness problem: A decomposition approach. Euro. J. Oper. Res. 69 187-199.
    • (1993) Euro. J. Oper. Res. , vol.69 , pp. 187-199
    • Raman, N.1    Talbot, F.B.2
  • 17
    • 0027540852 scopus 로고
    • An investigation of due date assignment using work-load information of a dynamic job shop
    • Udo, G. 1993. An investigation of due date assignment using work-load information of a dynamic job shop. Internat. J. Production Res. 29 89-101.
    • (1993) Internat. J. Production Res. , vol.29 , pp. 89-101
    • Udo, G.1
  • 18
    • 0001200692 scopus 로고
    • Due date setting and priority sequencing in a multiclass M/G/1 queue
    • Wein, L. M. 1991. Due date setting and priority sequencing in a multiclass M/G/1 queue. Management Sci. 37(7) 834-850.
    • (1991) Management Sci. , vol.37 , Issue.7 , pp. 834-850
    • Wein, L.M.1
  • 19
    • 0030574812 scopus 로고    scopus 로고
    • Manufacturing leadtimes, system utilization rates and leadtime-related demand
    • Weng, Z. K. 1996. Manufacturing leadtimes, system utilization rates and leadtime-related demand. Euro. J. Oper. Res. 89 259-268.
    • (1996) Euro. J. Oper. Res. , vol.89 , pp. 259-268
    • Weng, Z.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.