-
1
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops
-
Adam, N. R., J. W. M. Bertrand, D. C. Morehead, J. Surkis. 1993. Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops. Euro. J. Oper. Res. 68 212-227.
-
(1993)
Euro. J. Oper. Res.
, vol.68
, pp. 212-227
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Morehead, D.C.3
Surkis, J.4
-
2
-
-
0022160975
-
Setting job-shop due dates with service-level constraints
-
Bookbinder, James H., Afzal Ibn Noor. 1985. Setting job-shop due dates with service-level constraints. J. Oper. Res. Society 36(11) 1017-1026.
-
(1985)
J. Oper. Res. Society
, vol.36
, Issue.11
, pp. 1017-1026
-
-
Bookbinder, J.H.1
Noor, A.I.2
-
3
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T. C. E., M. C. Gupta. 1989. Survey of scheduling research involving due date determination decisions. Euro. J. Oper. Res. 38 156-166.
-
(1989)
Euro. J. Oper. Res.
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
4
-
-
0026241609
-
Due date setting and production control
-
Dellaert, N. P. 1991. Due date setting and production control. Internat. J. Production Res. 23 56-67.
-
(1991)
Internat. J. Production Res.
, vol.23
, pp. 56-67
-
-
Dellaert, N.P.1
-
5
-
-
0001131108
-
Single facility due date setting with multiple customer classes
-
Duenyas, I. 1995. Single facility due date setting with multiple customer classes. Management Sci. 41(4) 608-619.
-
(1995)
Management Sci.
, vol.41
, Issue.4
, pp. 608-619
-
-
Duenyas, I.1
-
6
-
-
0000538802
-
Job shop leadtime requirements under conditions of controlled delivery performance
-
Enns, S. T. 1994. Job shop leadtime requirements under conditions of controlled delivery performance. Euro. J. Oper. Res. 77 429-439.
-
(1994)
Euro. J. Oper. Res.
, vol.77
, pp. 429-439
-
-
Enns, S.T.1
-
7
-
-
0024680497
-
Due date assignment in a multistage job shop
-
Fry, T. D., P. R. Philipoom, R. E. Markland. 1989. Due date assignment in a multistage job shop. IIE Trans. 21(2) 1453-1461.
-
(1989)
IIE Trans.
, vol.21
, Issue.2
, pp. 1453-1461
-
-
Fry, T.D.1
Philipoom, P.R.2
Markland, R.E.3
-
8
-
-
0033079833
-
Earliness penalties on a machine subject to precedence constraints: SLK due date assignment
-
Gordon, V. S., V. A. Strusevich. 1999. Earliness penalties on a machine subject to precedence constraints: SLK due date assignment. Computers and Oper. Res. 26 157-177.
-
(1999)
Computers and Oper. Res.
, vol.26
, pp. 157-177
-
-
Gordon, V.S.1
Strusevich, V.A.2
-
9
-
-
0034275944
-
Quoting manufacturing due dates subject to a service level constraint
-
Hopp, W. J., M. L. Roof. 2000. Quoting manufacturing due dates subject to a service level constraint. IIE Trans. 32(9) 771-784.
-
(2000)
IIE Trans.
, vol.32
, Issue.9
, pp. 771-784
-
-
Hopp, W.J.1
Roof, M.L.2
-
10
-
-
0003912423
-
-
Prentice Hall, Englewood Cliffs, NJ
-
Larson, R. J., M. L. Marx. 1986. An Introduction to Mathematical Statistics and Its Applications, 2nd ed. Prentice Hall, Englewood Cliffs, NJ.
-
(1986)
An Introduction to Mathematical Statistics and Its Applications, 2nd Ed.
-
-
Larson, R.J.1
Marx, M.L.2
-
11
-
-
0029393210
-
Estimating flow times and setting due dates in complex production systems
-
Lawrence, S. R. 1995. Estimating flow times and setting due dates in complex production systems. IIE Trans. 27(5) 657-668.
-
(1995)
IIE Trans.
, vol.27
, Issue.5
, pp. 657-668
-
-
Lawrence, S.R.1
-
12
-
-
84990604706
-
Using neural networks to determine internally-set due date assignments for shop scheduling
-
Philipoom, P. R., L. P. Rees, L. Wiegmann. 1994. Using neural networks to determine internally-set due date assignments for shop scheduling. Decision Sci. 25(5/6) 825-851.
-
(1994)
Decision Sci.
, vol.25
, Issue.5-6
, pp. 825-851
-
-
Philipoom, P.R.1
Rees, L.P.2
Wiegmann, L.3
-
13
-
-
0032028267
-
Scheduling a single machine to minimize earliness penalties subject to SLK due date determination method
-
Qi, X., F. S. Tu. 1998. Scheduling a single machine to minimize earliness penalties subject to SLK due date determination method. Euro. J. Oper. Res. 105 502-508.
-
(1998)
Euro. J. Oper. Res.
, vol.105
, pp. 502-508
-
-
Qi, X.1
Tu, F.S.2
-
14
-
-
0027656563
-
The job shop tardiness problem: A decomposition approach
-
Raman, N., F. B. Talbot. 1993. The job shop tardiness problem: A decomposition approach. Euro. J. Oper. Res. 69 187-199.
-
(1993)
Euro. J. Oper. Res.
, vol.69
, pp. 187-199
-
-
Raman, N.1
Talbot, F.B.2
-
17
-
-
0027540852
-
An investigation of due date assignment using work-load information of a dynamic job shop
-
Udo, G. 1993. An investigation of due date assignment using work-load information of a dynamic job shop. Internat. J. Production Res. 29 89-101.
-
(1993)
Internat. J. Production Res.
, vol.29
, pp. 89-101
-
-
Udo, G.1
-
18
-
-
0001200692
-
Due date setting and priority sequencing in a multiclass M/G/1 queue
-
Wein, L. M. 1991. Due date setting and priority sequencing in a multiclass M/G/1 queue. Management Sci. 37(7) 834-850.
-
(1991)
Management Sci.
, vol.37
, Issue.7
, pp. 834-850
-
-
Wein, L.M.1
-
19
-
-
0030574812
-
Manufacturing leadtimes, system utilization rates and leadtime-related demand
-
Weng, Z. K. 1996. Manufacturing leadtimes, system utilization rates and leadtime-related demand. Euro. J. Oper. Res. 89 259-268.
-
(1996)
Euro. J. Oper. Res.
, vol.89
, pp. 259-268
-
-
Weng, Z.K.1
|