메뉴 건너뛰기




Volumn 39, Issue 9, 2001, Pages 1943-1954

Stage due date planning for multistage assembly systems

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; COMPUTER SIMULATION; COST EFFECTIVENESS; CRITICAL PATH ANALYSIS; HEURISTIC METHODS; MANUFACTURE; PLANNING; RISK ASSESSMENT;

EID: 0035878030     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540110035543     Document Type: Article
Times cited : (10)

References (26)
  • 1
    • 0019582153 scopus 로고
    • A comparison of due date selection rules
    • Baker, K. R. and Bertrand, J. W. M., 1981, A comparison of due date selection rules. AIIE Transactions, 13, 123-131.
    • (1981) AIIE Transactions , vol.13 , pp. 123-131
    • Baker, K.R.1    Bertrand, J.W.M.2
  • 3
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due date determination decisions. European Journal of Operation Research, 38, 156-166.
    • (1989) European Journal of Operation Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 5
    • 0010850387 scopus 로고
    • Enhanced production scheduling and capacity management: Is it worth it?
    • June
    • Donovan, R. M., 1992, Enhanced production scheduling and capacity management: is it worth it? APICS - The Performance Advantage, June, 42-46.
    • (1992) APICS - the Performance Advantage , pp. 42-46
    • Donovan, R.M.1
  • 8
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee, E. S. and Smith, C. H., 1993, Selecting allowance policies for improved job shop performance. International Journal of Production Research, 31, 1839-1852.
    • (1993) International Journal of Production Research , vol.31 , pp. 1839-1852
    • Gee, E.S.1    Smith, C.H.2
  • 10
    • 0028423190 scopus 로고
    • Optimal leadtimes planning in a serial production system
    • Gong, L. G., Kok, T. and Ding, J., 1994, Optimal leadtimes planning in a serial production system. Management Science, 40, 629-632.
    • (1994) Management Science , vol.40 , pp. 629-632
    • Gong, L.G.1    Kok, T.2    Ding, J.3
  • 11
    • 0024961857 scopus 로고
    • Production planning systems and their applicability to make-to-order companies
    • Hendry, L. C. and Kingsman, B. G., 1989, Production planning systems and their applicability to make-to-order companies. European Journal of Operational Research, 40, 1-15.
    • (1989) European Journal of Operational Research , vol.40 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 12
    • 0003527397 scopus 로고    scopus 로고
    • Computer aided production management (CAPM) systems in make to order/engineering to order heavy engineering company
    • PhD thesis, University of Newcastle
    • Hicks, C., 1998, Computer aided production management (CAPM) systems in make to order/engineering to order heavy engineering company, PhD thesis, University of Newcastle.
    • (1998)
    • Hicks, C.1
  • 13
    • 0028429305 scopus 로고
    • Evaluating the impact of lead-time uncertainty in material requirements planning systems
    • Ho, C. J. and Lau, H. S., 1994, Evaluating the impact of lead-time uncertainty in material requirements planning systems. European Journal of Operational Research, 75, 89-99.
    • (1994) European Journal of Operational Research , vol.75 , pp. 89-99
    • Ho, C.J.1    Lau, H.S.2
  • 14
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due-dates in complex production systems
    • Lawrence, S. R., 1995, Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions, 27, 657-668.
    • (1995) IIE Transactions , vol.27 , pp. 657-668
    • Lawrence, S.R.1
  • 15
    • 0033075592 scopus 로고    scopus 로고
    • A heuristic algorithm for a production planning problem in an assembly
    • Park, M. W. and Kim, Y. D. 1999, A heuristic algorithm for a production planning problem in an assembly. Journal of the Operational Research Society, 50, 138-147.
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 138-147
    • Park, M.W.1    Kim, Y.D.2
  • 16
    • 0031078573 scopus 로고    scopus 로고
    • Cost-based due date assignment with the use of classical and neural-network approaches
    • Philipoom, P. R., Weigmann, L. and Rees, L. P., 1997, Cost-based due date assignment with the use of classical and neural-network approaches. Naval Research Logistics, 44, 21-46.
    • (1997) Naval Research Logistics , vol.44 , pp. 21-46
    • Philipoom, P.R.1    Weigmann, L.2    Rees, L.P.3
  • 18
    • 0030172572 scopus 로고    scopus 로고
    • Dynamic assignment of due-dates in an assembly shop based in simulation
    • Roman, D. B. and Valle, A. G., 1996, Dynamic assignment of due-dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
    • (1996) International Journal of Production Research , vol.34 , pp. 1539-1554
    • Roman, D.B.1    Valle, A.G.2
  • 19
    • 0019560165 scopus 로고
    • Due date assignment for production systems
    • Seidmann, A. and Smith, M. L., 1981, Due date assignment for production systems. Management Science 27(5), 571-581.
    • (1981) Management Science , vol.27 , Issue.5 , pp. 571-581
    • Seidmann, A.1    Smith, M.L.2
  • 20
    • 0024064120 scopus 로고
    • Approximations for the time spent in a dynamic job shop with applications to due-date assignment
    • Shanthikumar, J. G. and Sumita, U., 1988, Approximations for the time spent in a dynamic job shop with applications to due-date assignment. International Journal of Production Research, 26, 1329-1352.
    • (1988) International Journal of Production Research , vol.26 , pp. 1329-1352
    • Shanthikumar, J.G.1    Sumita, U.2
  • 21
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith, C. H. Minor, E. D. and Wen, H. J., 1995, Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
    • (1995) International Journal of Production Research , vol.33 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 22
    • 0010772513 scopus 로고    scopus 로고
    • Due date planning in manufacturing systems with complex product structure and uncertain processing times
    • Working Paper, Department of Mechanical, Materials and Manufacturing Engineering, Newcastle University, UK
    • Song, D. P., Hicks, C. and Earl, C. F., 1999, Due date planning in manufacturing systems with complex product structure and uncertain processing times. Working Paper, Department of Mechanical, Materials and Manufacturing Engineering, Newcastle University, UK (submitted to International Journal of Production Economics).
    • (1999) (International Journal of Production Economics)
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 23
    • 0033102034 scopus 로고    scopus 로고
    • Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
    • Soroush, H. M., 1999, Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. European Journal of Operational Research, 113, 450-468.
    • (1999) European Journal of Operational Research , vol.113 , pp. 450-468
    • Soroush, H.M.1
  • 24
    • 0018454859 scopus 로고
    • A simulation study of predictable due dates
    • Weeks, J. K., 1979, A simulation study of predictable due dates. Management Science, 25, 363-373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 25
    • 0001200692 scopus 로고
    • Due-date setting and priority sequencing multiclass M/G/1 queue
    • Wein, L. M., 1991, Due-date setting and priority sequencing multiclass M/G/1 queue. Management Science, 37, 834-850.
    • (1991) Management Science , vol.37 , pp. 834-850
    • Wein, L.M.1
  • 26
    • 0023207074 scopus 로고
    • Setting planned lead-times in serial production systems with tardiness costs
    • Yano, C. A., 1987, Setting planned lead-times in serial production systems with tardiness costs. Management Science, 33, 95-106.
    • (1987) Management Science , vol.33 , pp. 95-106
    • Yano, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.