-
1
-
-
0019582153
-
A comparison of due date selection rules
-
Baker, K. R. and Bertrand, J. W. M., 1981, A comparison of due date selection rules. AIIE Transactions, 13, 123-131.
-
(1981)
AIIE Transactions
, vol.13
, pp. 123-131
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
2
-
-
0022160975
-
Setting job-shop due-dates with service-constraints
-
Bookbinder, J.H. and Noor, A.I., 1985, Setting job-shop due-dates with service-constraints. Journal of the Operational Research Society, 36, 1017-1026.
-
(1985)
Journal of the Operational Research Society
, vol.36
, pp. 1017-1026
-
-
Bookbinder, J.H.1
Noor, A.I.2
-
3
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due date determination decisions. European Journal of Operation Research, 38, 156-166.
-
(1989)
European Journal of Operation Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
4
-
-
0004113622
-
-
(Reading, MA: Addison-Wesley)
-
Conwey, R. W., Maxwell, W. L. and Miller, L. W., 1967, Theory of Scheduling (Reading, MA: Addison-Wesley).
-
(1967)
Theory of Scheduling
-
-
Conwey, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
5
-
-
0010850387
-
Enhanced production scheduling and capacity management: Is it worth it?
-
June
-
Donovan, R. M., 1992, Enhanced production scheduling and capacity management: is it worth it? APICS - The Performance Advantage, June, 42-46.
-
(1992)
APICS - the Performance Advantage
, pp. 42-46
-
-
Donovan, R.M.1
-
6
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S. and Chowdhury, I. G., 1976, Due dates in job shop scheduling. International Journal of Production Research, 14, 223-238.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 223-238
-
-
Eilon, S.1
Chowdhury, I.G.2
-
7
-
-
0024641735
-
The effects of product structure and sequencing rule on assembly shop performance
-
Fry, T. D., Oliff, M. D., Minor, E. D. and Leong, G. K., 1989, The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research, 27, 671-686.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 671-686
-
-
Fry, T.D.1
Oliff, M.D.2
Minor, E.D.3
Leong, G.K.4
-
8
-
-
0027642739
-
Selecting allowance policies for improved job shop performance
-
Gee, E. S. and Smith, C. H., 1993, Selecting allowance policies for improved job shop performance. International Journal of Production Research, 31, 1839-1852.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1839-1852
-
-
Gee, E.S.1
Smith, C.H.2
-
9
-
-
0018483024
-
Production planning: A review
-
Gelders, L. F. and Van Wassenhove, L. N., 1981, Production planning: a review. European Journal of Operational Research, 7, 101-110.
-
(1981)
European Journal of Operational Research
, vol.7
, pp. 101-110
-
-
Gelders, L.F.1
Van Wassenhove, L.N.2
-
10
-
-
0028423190
-
Optimal leadtimes planning in a serial production system
-
Gong, L. G., Kok, T. and Ding, J., 1994, Optimal leadtimes planning in a serial production system. Management Science, 40, 629-632.
-
(1994)
Management Science
, vol.40
, pp. 629-632
-
-
Gong, L.G.1
Kok, T.2
Ding, J.3
-
11
-
-
0024961857
-
Production planning systems and their applicability to make-to-order companies
-
Hendry, L. C. and Kingsman, B. G., 1989, Production planning systems and their applicability to make-to-order companies. European Journal of Operational Research, 40, 1-15.
-
(1989)
European Journal of Operational Research
, vol.40
, pp. 1-15
-
-
Hendry, L.C.1
Kingsman, B.G.2
-
12
-
-
0003527397
-
Computer aided production management (CAPM) systems in make to order/engineering to order heavy engineering company
-
PhD thesis, University of Newcastle
-
Hicks, C., 1998, Computer aided production management (CAPM) systems in make to order/engineering to order heavy engineering company, PhD thesis, University of Newcastle.
-
(1998)
-
-
Hicks, C.1
-
13
-
-
0028429305
-
Evaluating the impact of lead-time uncertainty in material requirements planning systems
-
Ho, C. J. and Lau, H. S., 1994, Evaluating the impact of lead-time uncertainty in material requirements planning systems. European Journal of Operational Research, 75, 89-99.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 89-99
-
-
Ho, C.J.1
Lau, H.S.2
-
14
-
-
0029393210
-
Estimating flowtimes and setting due-dates in complex production systems
-
Lawrence, S. R., 1995, Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions, 27, 657-668.
-
(1995)
IIE Transactions
, vol.27
, pp. 657-668
-
-
Lawrence, S.R.1
-
15
-
-
0033075592
-
A heuristic algorithm for a production planning problem in an assembly
-
Park, M. W. and Kim, Y. D. 1999, A heuristic algorithm for a production planning problem in an assembly. Journal of the Operational Research Society, 50, 138-147.
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 138-147
-
-
Park, M.W.1
Kim, Y.D.2
-
16
-
-
0031078573
-
Cost-based due date assignment with the use of classical and neural-network approaches
-
Philipoom, P. R., Weigmann, L. and Rees, L. P., 1997, Cost-based due date assignment with the use of classical and neural-network approaches. Naval Research Logistics, 44, 21-46.
-
(1997)
Naval Research Logistics
, vol.44
, pp. 21-46
-
-
Philipoom, P.R.1
Weigmann, L.2
Rees, L.P.3
-
17
-
-
0021468849
-
A framework for the study of due date management in job shops
-
Ragatz, G. L. and Mabert, V. A., 1984, A framework for the study of due date management in job shops. International Journal of Production Research, 22, 685-695.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 685-695
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
18
-
-
0030172572
-
Dynamic assignment of due-dates in an assembly shop based in simulation
-
Roman, D. B. and Valle, A. G., 1996, Dynamic assignment of due-dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1539-1554
-
-
Roman, D.B.1
Valle, A.G.2
-
19
-
-
0019560165
-
Due date assignment for production systems
-
Seidmann, A. and Smith, M. L., 1981, Due date assignment for production systems. Management Science 27(5), 571-581.
-
(1981)
Management Science
, vol.27
, Issue.5
, pp. 571-581
-
-
Seidmann, A.1
Smith, M.L.2
-
20
-
-
0024064120
-
Approximations for the time spent in a dynamic job shop with applications to due-date assignment
-
Shanthikumar, J. G. and Sumita, U., 1988, Approximations for the time spent in a dynamic job shop with applications to due-date assignment. International Journal of Production Research, 26, 1329-1352.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1329-1352
-
-
Shanthikumar, J.G.1
Sumita, U.2
-
21
-
-
0001385963
-
Regression-based due date assignment rules for improved assembly shop performance
-
Smith, C. H. Minor, E. D. and Wen, H. J., 1995, Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
22
-
-
0010772513
-
Due date planning in manufacturing systems with complex product structure and uncertain processing times
-
Working Paper, Department of Mechanical, Materials and Manufacturing Engineering, Newcastle University, UK
-
Song, D. P., Hicks, C. and Earl, C. F., 1999, Due date planning in manufacturing systems with complex product structure and uncertain processing times. Working Paper, Department of Mechanical, Materials and Manufacturing Engineering, Newcastle University, UK (submitted to International Journal of Production Economics).
-
(1999)
(International Journal of Production Economics)
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
23
-
-
0033102034
-
Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs
-
Soroush, H. M., 1999, Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs. European Journal of Operational Research, 113, 450-468.
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 450-468
-
-
Soroush, H.M.1
-
24
-
-
0018454859
-
A simulation study of predictable due dates
-
Weeks, J. K., 1979, A simulation study of predictable due dates. Management Science, 25, 363-373.
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
25
-
-
0001200692
-
Due-date setting and priority sequencing multiclass M/G/1 queue
-
Wein, L. M., 1991, Due-date setting and priority sequencing multiclass M/G/1 queue. Management Science, 37, 834-850.
-
(1991)
Management Science
, vol.37
, pp. 834-850
-
-
Wein, L.M.1
-
26
-
-
0023207074
-
Setting planned lead-times in serial production systems with tardiness costs
-
Yano, C. A., 1987, Setting planned lead-times in serial production systems with tardiness costs. Management Science, 33, 95-106.
-
(1987)
Management Science
, vol.33
, pp. 95-106
-
-
Yano, C.A.1
|