메뉴 건너뛰기




Volumn 68, Issue , 2014, Pages 42-56

An integrated quality function deployment and capital budgeting methodology for occupational safety and health as a systems thinking approach: The case of the construction industry

Author keywords

0 1 Knapsack model; Accident cost; Construction; Injury severity score; Quality function deployment

Indexed keywords

BUDGET CONTROL; CONSTRUCTION; CONSTRUCTION INDUSTRY; HAZARDS; INVESTMENTS; SYSTEM THEORY;

EID: 84899437975     PISSN: 00014575     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.aap.2013.10.005     Document Type: Article
Times cited : (30)

References (47)
  • 1
    • 0010641875 scopus 로고    scopus 로고
    • Quality function deployment in construction design: Application in low-cost housing design
    • H. Abdul-Rahman, C.L. Kwan, and P.C. Woods Quality function deployment in construction design: application in low-cost housing design Int. J. Quality Reliability Manag. 16 6 1999 591 605
    • (1999) Int. J. Quality Reliability Manag. , vol.16 , Issue.6 , pp. 591-605
    • Abdul-Rahman, H.1    Kwan, C.L.2    Woods, P.C.3
  • 3
    • 0028464045 scopus 로고
    • An AHP framework for prioritizing customer requirements in QFD: An industrialized housing application
    • R.L. Armacost, P.J. Componation, M.A. Mullens, and W.W. Swart An AHP framework for prioritizing customer requirements in QFD: an industrialized housing application IIE Trans. 26 4 1994 72 79
    • (1994) IIE Trans. , vol.26 , Issue.4 , pp. 72-79
    • Armacost, R.L.1    Componation, P.J.2    Mullens, M.A.3    Swart, W.W.4
  • 5
    • 84877940454 scopus 로고    scopus 로고
    • Bureau of Labor Statistics Injuries, illnesses and fatalities, case and demographic characteristics for work-related injuries and illnesses involving days away from work, Supplemental Tables, Table R64
    • Bureau of Labor Statistics, 2011b. Injuries, illnesses and fatalities, case and demographic characteristics for work-related injuries and illnesses involving days away from work, Supplemental Tables, Table R64. Number of nonfatal occupational injuries and illnesses involving days away from work by event or exposure leading to injury or illness and industry sector, Available from: http://www.bls.gov/iif/oshcdnew.htm.
    • (2011) Number of Nonfatal Occupational Injuries and Illnesses Involving Days Away from Work by Event or Exposure Leading to Injury or Illness and Industry Sector
  • 8
    • 84899447524 scopus 로고    scopus 로고
    • Bureau of Labor Statistics Supplemental Tables, R31. Number of nonfatal occupational injuries and illnesses involving days away from work by event or exposure leading to injury or illness and selected natures of injury or illness
    • Bureau of Labor Statistics, 2011e. Injuries, illnesses and fatalities, case and demographic characteristics for work-related injuries and illnesses involving days away from work, Supplemental Tables, R31. Number of nonfatal occupational injuries and illnesses involving days away from work by event or exposure leading to injury or illness and selected natures of injury or illness. Available from: http://www.bls.gov/iif/oshcdnew.htm.
    • (2011) Injuries, Illnesses and Fatalities, Case and Demographic Characteristics for Work-related Injuries and Illnesses Involving Days Away from Work
  • 9
    • 84899447524 scopus 로고    scopus 로고
    • Bureau of Labor Statistics Supplemental Tables: Table R13. Number of nonfatal occupational injuries and illnesses involving days away from work by nature of injury or illness and selected parts of body affected by injury or illness
    • Bureau of Labor Statistics, 2011f. Injuries, illnesses and fatalities, case and demographic characteristics for work-related injuries and illnesses involving days away from work. Supplemental Tables: Table R13. Number of nonfatal occupational injuries and illnesses involving days away from work by nature of injury or illness and selected parts of body affected by injury or illness. Available from: http://www.bls.gov/iif/oshcdnew.htm.
    • (2011) Injuries, Illnesses and Fatalities, Case and Demographic Characteristics for Work-related Injuries and Illnesses Involving Days Away from Work
  • 11
    • 34548693447 scopus 로고    scopus 로고
    • Integrating value analysis and quality function deployment for evaluating design alternatives
    • I. Cariaga, T. El-Diraby, and H. Osman Integrating value analysis and quality function deployment for evaluating design alternatives J. Construct. Eng. Manag. 133 10 2007 761 770
    • (2007) J. Construct. Eng. Manag. , vol.133 , Issue.10 , pp. 761-770
    • Cariaga, I.1    El-Diraby, T.2    Osman, H.3
  • 12
    • 0037121486 scopus 로고    scopus 로고
    • Quality function deployment: A literature review
    • L.-K. Chan, and M.-L. Wu Quality function deployment: a literature review Eur. J. Operat. Res. 143 2002 463 497
    • (2002) Eur. J. Operat. Res. , vol.143 , pp. 463-497
    • Chan, L.-K.1    Wu, M.-L.2
  • 13
    • 4744337588 scopus 로고    scopus 로고
    • Strategic use of quality function deployment (QFD) in the construction industry
    • I. Dikmen, M.T. Birgonul, and S. Kiziltas Strategic use of quality function deployment (QFD) in the construction industry Building Environ. 40 2 2005 245 255
    • (2005) Building Environ. , vol.40 , Issue.2 , pp. 245-255
    • Dikmen, I.1    Birgonul, M.T.2    Kiziltas, S.3
  • 14
    • 4744354447 scopus 로고    scopus 로고
    • Pilot study of quality function deployment in construction projects
    • N. Eldin, and V. Hikle Pilot study of quality function deployment in construction projects J. Construct. Eng. Manag. 129 3 2003 314 329
    • (2003) J. Construct. Eng. Manag. , vol.129 , Issue.3 , pp. 314-329
    • Eldin, N.1    Hikle, V.2
  • 16
    • 42949103619 scopus 로고    scopus 로고
    • Design's role in construction accident causality and prevention: Perspectives from an expert panel
    • J.A. Gambatese, M. Behm, and S. Rajendran Design's role in construction accident causality and prevention: perspectives from an expert panel Saf. Sci. 46 2008 675 691
    • (2008) Saf. Sci. , vol.46 , pp. 675-691
    • Gambatese, J.A.1    Behm, M.2    Rajendran, S.3
  • 17
    • 75149119201 scopus 로고    scopus 로고
    • Applying systems thinking concepts in the analysis of major incidents and safety culture
    • Y.M. Goh, H. Brown, and J. Spickett Applying systems thinking concepts in the analysis of major incidents and safety culture Saf. Sci. 48 3 2010 302 309
    • (2010) Saf. Sci. , vol.48 , Issue.3 , pp. 302-309
    • Goh, Y.M.1    Brown, H.2    Spickett, J.3
  • 18
    • 0035480540 scopus 로고    scopus 로고
    • Using quality function deployment for technique selection for optimum environmental performance improvement
    • A. Halog, F. Schultmann, and O. Rentz Using quality function deployment for technique selection for optimum environmental performance improvement J. Cleaner Product. 9 2001 387 394
    • (2001) J. Cleaner Product. , vol.9 , pp. 387-394
    • Halog, A.1    Schultmann, F.2    Rentz, O.3
  • 19
    • 77952545254 scopus 로고    scopus 로고
    • An analysis for the causes of accidents of repair, maintenance, alteration and addition works in Hong Kong
    • C.K.H. Hon, A.P.C. Chan, and F.K.W. Wong An analysis for the causes of accidents of repair, maintenance, alteration and addition works in Hong Kong Saf. Sci. 48 2010 894 901
    • (2010) Saf. Sci. , vol.48 , pp. 894-901
    • Hon, C.K.H.1    Chan, A.P.C.2    Wong, F.K.W.3
  • 20
    • 11544253975 scopus 로고    scopus 로고
    • Customer-oriented design methods for construction projects
    • P. Huovila, and K.J. Seren Customer-oriented design methods for construction projects J. Eng. Des. 9 3 1998 225 238
    • (1998) J. Eng. Des. , vol.9 , Issue.3 , pp. 225-238
    • Huovila, P.1    Seren, K.J.2
  • 21
    • 57649229436 scopus 로고    scopus 로고
    • Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach
    • Y.-K. Juan, Y.-H. Perng, D. Castro-Lacouture, and K.-S. Lu Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach Autom. Construct. 18 2 2009 139 144
    • (2009) Autom. Construct. , vol.18 , Issue.2 , pp. 139-144
    • Juan, Y.-K.1    Perng, Y.-H.2    Castro-Lacouture, D.3    Lu, K.-S.4
  • 22
    • 28244480436 scopus 로고    scopus 로고
    • A fuzzy optimization model for QFD planning process using analytic network approach
    • C. Kahraman, T. Ertay, and G. Büyüközkan A fuzzy optimization model for QFD planning process using analytic network approach Eur. J. Operat. Res. 171 2 2006 390 411
    • (2006) Eur. J. Operat. Res. , vol.171 , Issue.2 , pp. 390-411
    • Kahraman, C.1    Ertay, T.2    Büyüközkan, G.3
  • 23
    • 0034206905 scopus 로고    scopus 로고
    • Client requirements processing for concurrent life-cycle design and construction
    • J.M. Kamara, and C.J. Anumba Client requirements processing for concurrent life-cycle design and construction Concurr. Eng.-Res. Appl. 8 2 2000 74 88
    • (2000) Concurr. Eng.-Res. Appl. , vol.8 , Issue.2 , pp. 74-88
    • Kamara, J.M.1    Anumba, C.J.2
  • 24
    • 0002202183 scopus 로고    scopus 로고
    • Client requirements processing in construction: A new approach using QFD
    • J.M. Kamara, C.J. Anumba, and N.F.O. Evbuomwan Client requirements processing in construction: a new approach using QFD J. Architect. Eng. 5 1 1999 8 15
    • (1999) J. Architect. Eng. , vol.5 , Issue.1 , pp. 8-15
    • Kamara, J.M.1    Anumba, C.J.2    Evbuomwan, N.F.O.3
  • 25
    • 0034298691 scopus 로고    scopus 로고
    • Computer-based application for the processing of clients' requirements
    • J.M. Kamara, C.J. Anumba, and N.F.O. Evbuomwan Computer-based application for the processing of clients' requirements J. Comput. Civil Eng. 14 4 2000 264 271
    • (2000) J. Comput. Civil Eng. , vol.14 , Issue.4 , pp. 264-271
    • Kamara, J.M.1    Anumba, C.J.2    Evbuomwan, N.F.O.3
  • 26
    • 6344254954 scopus 로고    scopus 로고
    • Fuzzy multiple objective programming framework to prioritize design requirements in quality function deployment
    • E.E. Karsak Fuzzy multiple objective programming framework to prioritize design requirements in quality function deployment Comput. Ind. Eng. 47 2004 149 163
    • (2004) Comput. Ind. Eng. , vol.47 , pp. 149-163
    • Karsak, E.E.1
  • 29
    • 77955092365 scopus 로고    scopus 로고
    • The need for a systems theory approach to road safety
    • P. Larsson, S.W.A. Dekker, and C. Tingvall The need for a systems theory approach to road safety Saf. Sci. 48 9 2010 1167 1174
    • (2010) Saf. Sci. , vol.48 , Issue.9 , pp. 1167-1174
    • Larsson, P.1    Dekker, S.W.A.2    Tingvall, C.3
  • 30
    • 33645512505 scopus 로고    scopus 로고
    • Total quality performance of design/build firms using quality function deployment
    • D.-E. Lee, and D. Arditi Total quality performance of design/build firms using quality function deployment J. Construct. Eng. Manag. 132 1 2006 49 57
    • (2006) J. Construct. Eng. Manag. , vol.132 , Issue.1 , pp. 49-57
    • Lee, D.-E.1    Arditi, D.2
  • 31
    • 77957016520 scopus 로고    scopus 로고
    • Applying systems thinking to analyze and learn from events
    • N.G. Leveson Applying systems thinking to analyze and learn from events Saf. Sci. 49 1 2011 55 64
    • (2011) Saf. Sci. , vol.49 , Issue.1 , pp. 55-64
    • Leveson, N.G.1
  • 33
    • 36148947128 scopus 로고    scopus 로고
    • Using AHP and TOPSIS approaches in customer-driven product design process
    • M.-C. Lin, C.-C. Wang, M.-S. Chen, and C.A. Chang Using AHP and TOPSIS approaches in customer-driven product design process Comput. Ind. 59 2008 17 31
    • (2008) Comput. Ind. , vol.59 , pp. 17-31
    • Lin, M.-C.1    Wang, C.-C.2    Chen, M.-S.3    Chang, C.A.4
  • 35
    • 84856439870 scopus 로고    scopus 로고
    • A fuzzy risk assessment approach for occupational hazards in the construction industry
    • H.-T. Liu, and Y.-L. Tsai A fuzzy risk assessment approach for occupational hazards in the construction industry Saf. Sci. 50 2012 1067 1078
    • (2012) Saf. Sci. , vol.50 , pp. 1067-1078
    • Liu, H.-T.1    Tsai, Y.-L.2
  • 36
    • 77950189840 scopus 로고    scopus 로고
    • A fuzzy integrated methodology for evaluating conceptual bridge design
    • H. Malekly, S. Meysam Mousavi, and H. Hashemi A fuzzy integrated methodology for evaluating conceptual bridge design Expert Syst. Appl. 37 7 2010 4910 4920
    • (2010) Expert Syst. Appl. , vol.37 , Issue.7 , pp. 4910-4920
    • Malekly, H.1    Meysam Mousavi, S.2    Hashemi, H.3
  • 37
    • 0027667753 scopus 로고
    • Quality function deployment - A system for meeting customers' needs
    • J.C. Mallon, and D.E. Mulligan Quality function deployment - a system for meeting customers' needs J. Construct. Eng. Manag. 119 3 1993 516 531
    • (1993) J. Construct. Eng. Manag. , vol.119 , Issue.3 , pp. 516-531
    • Mallon, J.C.1    Mulligan, D.E.2
  • 39
    • 84899420247 scopus 로고    scopus 로고
    • Milli Egitim Bakanligi Milli Eǧitim BakanlIǧI Ders NotlarI, Ankara, Turkey (in Turkish)
    • Milli Egitim Bakanligi, 2006. İnsaat Teknolojisi KalIp Öncesi HazIrlIk. Milli Eǧitim BakanlIǧI Ders NotlarI, Ankara, Turkey (in Turkish).
    • (2006) İnsaat Teknolojisi KalIp Öncesi HazIrlIk
  • 40
    • 33749607077 scopus 로고    scopus 로고
    • Radiation safety management in health care - The application of quality function deployment
    • B.M. Moores Radiation safety management in health care - the application of quality function deployment Radiography 12 2006 291 304
    • (2006) Radiography , vol.12 , pp. 291-304
    • Moores, B.M.1
  • 41
    • 0032179378 scopus 로고    scopus 로고
    • Determination of an optimal set of design requirements using house of quality
    • T. Park, and K.-J. Kim Determination of an optimal set of design requirements using house of quality J. Operat. Manag. 16 1998 569 581
    • (1998) J. Operat. Manag. , vol.16 , pp. 569-581
    • Park, T.1    Kim, K.-J.2
  • 42
    • 0035369748 scopus 로고    scopus 로고
    • Quality function deployment in design/build projects
    • L.S. Pheng, and L. Yeap Quality function deployment in design/build projects J. Architect. Eng. 7 2 2001 30 39
    • (2001) J. Architect. Eng. , vol.7 , Issue.2 , pp. 30-39
    • Pheng, L.S.1    Yeap, L.2
  • 44
    • 4744339790 scopus 로고    scopus 로고
    • Use of quality function deployment in civil engineering capital project planning
    • M.A. Syed, L.P. Sang, and Z.M. Torbica Use of quality function deployment in civil engineering capital project planning J. Construct. Eng. Manag. 129 4 2003 358 368
    • (2003) J. Construct. Eng. Manag. , vol.129 , Issue.4 , pp. 358-368
    • Syed, M.A.1    Sang, L.P.2    Torbica, Z.M.3
  • 45
    • 84899452899 scopus 로고    scopus 로고
    • Trauma.org, 2012. Injury Severity Score Available at: http://www.trauma.org/index.php/main/article/383.
    • (2012) Injury Severity Score
  • 46
    • 0037139679 scopus 로고    scopus 로고
    • Innovative product development process by integrating QFD and TRIZ
    • H. Yamashina, T. Ito, and H. Kawada Innovative product development process by integrating QFD and TRIZ Int. J. Product. Res. 40 5 2002 1031 1050
    • (2002) Int. J. Product. Res. , vol.40 , Issue.5 , pp. 1031-1050
    • Yamashina, H.1    Ito, T.2    Kawada, H.3
  • 47
    • 0038147014 scopus 로고    scopus 로고
    • A fuzzy quality function deployment system for buildable design decision-makings
    • Y.Q. Yang, S.Q. Wang, M. Dulaimi, and S.P. Low A fuzzy quality function deployment system for buildable design decision-makings Automat. Construct. 12 4 2003 381 393
    • (2003) Automat. Construct. , vol.12 , Issue.4 , pp. 381-393
    • Yang, Y.Q.1    Wang, S.Q.2    Dulaimi, M.3    Low, S.P.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.