메뉴 건너뛰기




Volumn 50, Issue 4, 2012, Pages 1067-1078

A fuzzy risk assessment approach for occupational hazards in the construction industry

Author keywords

Construction industry; Fuzzy ANP; Fuzzy FMEA; Occupational hazards; QFD

Indexed keywords

ASSESSMENT APPROACHES; EFFECT ANALYSIS; ENGINEERING COMPANIES; FUZZY ANALYTIC NETWORK PROCESS; FUZZY ANP; FUZZY FMEA; FUZZY RISK; IMPROVEMENT TECHNIQUE; OCCUPATIONAL HAZARDS; PERFORMANCE EVALUATION; QFD; RAPID DEVELOPMENT; RISK VALUE; SOUTHERN TAIWAN; TELECOM; TWO STAGE;

EID: 84856439870     PISSN: 09257535     EISSN: 18791042     Source Type: Journal    
DOI: 10.1016/j.ssci.2011.11.021     Document Type: Article
Times cited : (190)

References (56)
  • 2
    • 77955892275 scopus 로고    scopus 로고
    • Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP
    • Abdelgawad M., Fayek A.R. Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Management 2010, 136:1028-1036.
    • (2010) Journal of Construction Engineering and Management , vol.136 , pp. 1028-1036
    • Abdelgawad, M.1    Fayek, A.R.2
  • 4
    • 42649096303 scopus 로고    scopus 로고
    • Fuzzy inference system for software product family process evaluation
    • Ahmed F., Capretz L.F., Samarabandu J. Fuzzy inference system for software product family process evaluation. Information Sciences 2008, 178:2780-2793.
    • (2008) Information Sciences , vol.178 , pp. 2780-2793
    • Ahmed, F.1    Capretz, L.F.2    Samarabandu, J.3
  • 6
    • 42949084772 scopus 로고    scopus 로고
    • Critical success factors influencing safety program performance in the construction projects
    • Aksorn T., Hadikusumo B.H.W. Critical success factors influencing safety program performance in the construction projects. Safety Science 2008, 46:709-721.
    • (2008) Safety Science , vol.46 , pp. 709-721
    • Aksorn, T.1    Hadikusumo, B.H.W.2
  • 10
    • 34247563829 scopus 로고    scopus 로고
    • An intelligent approach to ERP software selection through fuzzy ANP Source
    • Ayag Z., Ozdemir R.G. An intelligent approach to ERP software selection through fuzzy ANP Source. International Journal of Production Research 2007, 45:2169-2194.
    • (2007) International Journal of Production Research , vol.45 , pp. 2169-2194
    • Ayag, Z.1    Ozdemir, R.G.2
  • 12
    • 6344270169 scopus 로고    scopus 로고
    • An assessment of PRN prioritization in a failure modes effects and criticality analysis
    • Bowles J.B. An assessment of PRN prioritization in a failure modes effects and criticality analysis. Journal of the IEST 2004, 47:51-56.
    • (2004) Journal of the IEST , vol.47 , pp. 51-56
    • Bowles, J.B.1
  • 13
    • 46549093655 scopus 로고
    • Fuzzy hierarchical analysis
    • Buckley J.J. Fuzzy hierarchical analysis. Fuzzy Sets and Systems 1985, 17:233-247.
    • (1985) Fuzzy Sets and Systems , vol.17 , pp. 233-247
    • Buckley, J.J.1
  • 14
    • 2342567094 scopus 로고    scopus 로고
    • Determing the importance weights for the design requirements in the house of quality using the fuzzy analytic network approach
    • Büyüközkan G., Ertay T., Kahraman C., Ruan D. Determing the importance weights for the design requirements in the house of quality using the fuzzy analytic network approach. International Journal of Intelligent Systems 2004, 19:443-461.
    • (2004) International Journal of Intelligent Systems , vol.19 , pp. 443-461
    • Büyüközkan, G.1    Ertay, T.2    Kahraman, C.3    Ruan, D.4
  • 15
    • 39449138158 scopus 로고    scopus 로고
    • Supply chain management: a modular Fuzzy Inference System approach in supplier selection for new product development
    • Carrera D.A., Mayorga R.V. Supply chain management: a modular Fuzzy Inference System approach in supplier selection for new product development. Journal of Intelligent Manufacturing 2008, 19:1-12.
    • (2008) Journal of Intelligent Manufacturing , vol.19 , pp. 1-12
    • Carrera, D.A.1    Mayorga, R.V.2
  • 18
    • 77958575786 scopus 로고    scopus 로고
    • A risk assessment methodology using intuitionistic fuzzy set in FMEA
    • Chang K.H., Cheng C.H. A risk assessment methodology using intuitionistic fuzzy set in FMEA. International Journal of Systems Science 2010, 41:1457-1471.
    • (2010) International Journal of Systems Science , vol.41 , pp. 1457-1471
    • Chang, K.H.1    Cheng, C.H.2
  • 19
    • 18844391780 scopus 로고    scopus 로고
    • Accident patterns and prevention measures for fatal occupational falls in the construction industry
    • Chi C.F., Chang T.H., Ting H.I. Accident patterns and prevention measures for fatal occupational falls in the construction industry. Applied Ergonomics 2005, 36:391-400.
    • (2005) Applied Ergonomics , vol.36 , pp. 391-400
    • Chi, C.F.1    Chang, T.H.2    Ting, H.I.3
  • 20
    • 0031257675 scopus 로고    scopus 로고
    • Effects of age and occupation on occupational fatality rates
    • Chi C.F., Wu M.L. Effects of age and occupation on occupational fatality rates. Safety Science 1997, 27:1-17.
    • (1997) Safety Science , vol.27 , pp. 1-17
    • Chi, C.F.1    Wu, M.L.2
  • 21
    • 67349096684 scopus 로고    scopus 로고
    • In-depth accident analysis of electrical fatalities in the construction industry
    • Chi C.F., Yang C.C., Chen Z.L. In-depth accident analysis of electrical fatalities in the construction industry. International Journal of Industrial Ergonomics 2009, 39:635-644.
    • (2009) International Journal of Industrial Ergonomics , vol.39 , pp. 635-644
    • Chi, C.F.1    Yang, C.C.2    Chen, Z.L.3
  • 22
    • 38349073493 scopus 로고    scopus 로고
    • Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management
    • Dagdeviren M., Yüksel I. Developing a fuzzy analytic hierarchy process (AHP) model for behavior-based safety management. Information Sciences 2008, 178:1717-1733.
    • (2008) Information Sciences , vol.178 , pp. 1717-1733
    • Dagdeviren, M.1    Yüksel, I.2
  • 23
    • 43949085065 scopus 로고    scopus 로고
    • A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system
    • Daĝdeviren M., Yüksel I., Kurt M. A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system. Safety Science 2008, 46:771-783.
    • (2008) Safety Science , vol.46 , pp. 771-783
    • Daĝdeviren, M.1    Yüksel, I.2    Kurt, M.3
  • 24
    • 33745836126 scopus 로고    scopus 로고
    • Ranking fuzzy numbers with an area method using radius of gyration
    • Deng Y., Zhenfu Z., Qi L. Ranking fuzzy numbers with an area method using radius of gyration. Computers and Mathematics with Applications 2006, 51:1127-1136.
    • (2006) Computers and Mathematics with Applications , vol.51 , pp. 1127-1136
    • Deng, Y.1    Zhenfu, Z.2    Qi, L.3
  • 25
    • 0020767537 scopus 로고
    • Human factors in consumer product accident investigation
    • Drury C.G., Brill M. Human factors in consumer product accident investigation. Human Factors 1983, 25:329-342.
    • (1983) Human Factors , vol.25 , pp. 329-342
    • Drury, C.G.1    Brill, M.2
  • 26
    • 25144466515 scopus 로고    scopus 로고
    • Quality function deployment implementation based on analytic network process with linguistic data: an application in automotive industry
    • Ertay T., Büyüközkan G., Kahraman C., Ruan D. Quality function deployment implementation based on analytic network process with linguistic data: an application in automotive industry. Journal of Intelligent & Fuzzy Systems 2005, 16:221-232.
    • (2005) Journal of Intelligent & Fuzzy Systems , vol.16 , pp. 221-232
    • Ertay, T.1    Büyüközkan, G.2    Kahraman, C.3    Ruan, D.4
  • 28
    • 0032100379 scopus 로고    scopus 로고
    • Safety assessment in the built environment of saudi Arabia
    • Jannadi O., Assaf S. Safety assessment in the built environment of saudi Arabia. Safety Science 1998, 29:15-24.
    • (1998) Safety Science , vol.29 , pp. 15-24
    • Jannadi, O.1    Assaf, S.2
  • 30
  • 31
    • 0037209876 scopus 로고    scopus 로고
    • Product planning in quality function deployment using a combined analytic network process and goal programming approach
    • Karsak E.E., Sozer S., Alptekin S.E. Product planning in quality function deployment using a combined analytic network process and goal programming approach. Computers and Industrial Engineering 2002, 44:171-190.
    • (2002) Computers and Industrial Engineering , vol.44 , pp. 171-190
    • Karsak, E.E.1    Sozer, S.2    Alptekin, S.E.3
  • 32
    • 56349109412 scopus 로고    scopus 로고
    • Robustness indices and robust prioritization in QFD
    • Kim D.H., Kim K.J. Robustness indices and robust prioritization in QFD. Expert Systems with Applications 2009, 36:2651-2658.
    • (2009) Expert Systems with Applications , vol.36 , pp. 2651-2658
    • Kim, D.H.1    Kim, K.J.2
  • 34
  • 35
    • 45249098913 scopus 로고    scopus 로고
    • Data mining for occupational injuries in the Taiwan construction industry
    • Liao C.W., Perng Y.H. Data mining for occupational injuries in the Taiwan construction industry. Safety Science 2008, 46:1091-1102.
    • (2008) Safety Science , vol.46 , pp. 1091-1102
    • Liao, C.W.1    Perng, Y.H.2
  • 36
    • 77951130075 scopus 로고    scopus 로고
    • A QFD-based optimization method for a scalable product platform
    • Luo X., Tang J., Kwong C.K. A QFD-based optimization method for a scalable product platform. Engineering Optimization 2010, 42:141-156.
    • (2010) Engineering Optimization , vol.42 , pp. 141-156
    • Luo, X.1    Tang, J.2    Kwong, C.K.3
  • 38
    • 36749032682 scopus 로고    scopus 로고
    • Evaluation of general-purpose lifters for the date harvest industry based on a fuzzy inference system
    • Mazloumzadeh S.M., Shamsi M., Nezamabadi H. Evaluation of general-purpose lifters for the date harvest industry based on a fuzzy inference system. Computers and Electronics in Agriculture 2008, 60:60-66.
    • (2008) Computers and Electronics in Agriculture , vol.60 , pp. 60-66
    • Mazloumzadeh, S.M.1    Shamsi, M.2    Nezamabadi, H.3
  • 39
    • 42749083183 scopus 로고    scopus 로고
    • Pre-operative ordering of minimally invasive surgical tools: a fuzzy inference system approach
    • Miller D.J., Nelson C.A., Oleynikov D., Jones D.D. Pre-operative ordering of minimally invasive surgical tools: a fuzzy inference system approach. Artificial Intelligence in Medicine 2008, 43:35-45.
    • (2008) Artificial Intelligence in Medicine , vol.43 , pp. 35-45
    • Miller, D.J.1    Nelson, C.A.2    Oleynikov, D.3    Jones, D.D.4
  • 43
    • 0037226720 scopus 로고    scopus 로고
    • Modified failure mode and effects analysis using approximate reasoning
    • Pillay A., Wang J. Modified failure mode and effects analysis using approximate reasoning. Reliability Engineering and System Safety 2003, 79:69-85.
    • (2003) Reliability Engineering and System Safety , vol.79 , pp. 69-85
    • Pillay, A.1    Wang, J.2
  • 45
    • 0003757829 scopus 로고    scopus 로고
    • Decision Making with Dependence and Feedback: The Analytic Network Process
    • RWS, Pittsburgh.
    • Saaty, T.L., 1996. Decision Making with Dependence and Feedback: The Analytic Network Process. RWS, Pittsburgh.
    • (1996)
    • Saaty, T.L.1
  • 49
    • 77950832179 scopus 로고    scopus 로고
    • Linking company with customers and competitors: a comprehensive QFD model and its post-matrix analysis
    • Sharma J.R., Rawani A.M. Linking company with customers and competitors: a comprehensive QFD model and its post-matrix analysis. International Journal of Modelling and Simulation 2009, 29:191-198.
    • (2009) International Journal of Modelling and Simulation , vol.29 , pp. 191-198
    • Sharma, J.R.1    Rawani, A.M.2
  • 51
    • 0003600750 scopus 로고
    • Failure Mode and Effect Analysis: FMEA from Theory to Execution
    • American Society for Quality.
    • Stamatis, D.H., 1995. Failure Mode and Effect Analysis: FMEA from Theory to Execution. American Society for Quality.
    • (1995)
    • Stamatis, D.H.1
  • 53
    • 79955730038 scopus 로고    scopus 로고
    • Prioritization determination of project tasks in QFD process using design structure matrix
    • Tseng C.C., Torng C.C. Prioritization determination of project tasks in QFD process using design structure matrix. Journal of Quality 2011, 18:137-154.
    • (2011) Journal of Quality , vol.18 , pp. 137-154
    • Tseng, C.C.1    Torng, C.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.